***** **** ***** **.. ****** SPRINGS, LA.*****
PHONE: 225-***-**** CELL # 985-***-****
**********@*****.***
RONALD W. COOK
Summary
Experience
Petrochemical, Oil Gas experience Onshore, Offshore, including Construction QA/QC, Commissioning & Start-Up, Process Operations, Maintenance, with background in Health, Safety & Environmental.
WOODGROUP PSN
MECHANICAL Commissioning Lead –BIGFOOT PROJECT MANAGER, LEONARD DICKHAUT June 2014
Responsibilities
Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre-Start Safety Review.
Mechanical Completion Walk downs with Construction and Client
Finishing all final punch list activities to QA/QC acceptance
Performed As Built Drawings for the Client with the Design Engineer
Vessel, Line, and Equipment inventorying for flushing, circulating, and line cleaning. Coupled Loaded 4 hour Pump and Motor Run ins.
Blower and Compressor make-ready for initial starts and runs
Coordination with Construction, Client, and Commissioning for Permits to Work and all HSE issues
Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre- Start Safety Review.
Performed As Built Drawings for the Client with the Design Engineer
Chevron EGTL/EGP3 Projects Nigeria, January ’09 – June ‘14
Senior Piping Representative, QA/QC – Manager Jim Ash
Responsibilities:
Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre-Start Safety Review.
Mechanical Completion Walk downs with Construction and Client
Finishing all final punch list activities to QA/QC acceptance
Performed As Built Drawings for the Client with the Design Engineer
Performed OJT (on the job training) for all in O2 Cleaning, Pipe fitting; BIC (build it clean) and many other jobs.
Mechanical Completion Walk downs with Construction and Client
Coordination of Confined Space Entries for Internals verification and
Vessel Closures
Electric Solo Motor Run-Ins Monitoring and Reporting
Vessel, Line, and Equipment inventorying for flushing, circulating, and line cleaning.
Experience
Tengiz Chevroil Second Generation Project, Kazakhstan July ‘06 – Nov. 08
Mechanical/Pre-Commissioning Lead - Commissioning Engr. Dan Morrow
Responsibilities:
Superintendant Core commissioning support team
Finishing all final punch list activities to QA/QC acceptance
Superintendant for completion of LPG plant
Punch List Walk downs and Quality Verification Document completion
Mechanical Completion Walk downs with Construction and Client
Coordination of Confined Space Entries for Internals verification and Vessel Closures
Electric Solo Motor Run-Ins Monitoring and Reporting
Vessel, Line, and Equipment inventorying for flushing, circulating, and line cleaning.
Coupled Loaded 4 hour Pump and Motor Run ins.
Blower and Compressor make-ready for initial starts and runs
Coordination with Construction, Client, and Commissioning for Permits to Work and all HSE issues
Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre- Start Safety Review.
Performed As Built Drawings for the Client with the Design Engineer
BP Thunderhorse Offshore Drilling and Production Platform June ‘04 – July ‘06
Mechanical/Process Commissioning Lead, QA/QC. Commission Eng. Dan Morrow
Responsibilities:
QA/QC Inspections to verify proper construction methods and materials
Supervision of QA/QC Mechanics during Construction Phase.
Punch List Walk downs and Quality Verification Document completion
Mechanical Completion Walk downs with Construction and Client
Coordination of Confined Space Entries for Internals verification/alignments and Vessel Closures
Electric Solo Motor Run-Ins Monitoring and Reporting
Vessel, Line, and Equipment inventorying for flushing, circulating, and Coupled Loaded Pump and Motor Run ins.
Blower and Compressor make-ready for initial starts and runs
Coordination with Construction, Client, and Commissioning for Permits to Work, Start-Up Activity and Control Board DCS, HMI) communications
Integral in the Turnover to Client all systems of Topsides, and several items located in the Hull.
Performed As Built Drawings for the Client with the Design Engineer
Harmony Const. QA/QC Supervising Field Engineer Jan.2004 – June 2004
Responsibilities include Mech. Completion Walk downs with Construction and Client Managers, Doug Simoneaux, Don Richard
CS Metals Supervisor, Dan Huzar Nov., 2003 – Jan.2004
Responsibilities include Foreman, Piping Hydro and Consultant
Gulf South, Harmony Supervisor, Bubba Dikes July, 2003 – Nov., 2003
Responsibilities include QC and Leader man, Construction, Commissioning and Start-up
Motiva with Turner Industries Jan., 2003 – July 2003
QA/QC Plant Wide Leak Testing and Repair of all Systems.
Dow Chemical, Supervisor Doug Simoneaux July 2002 – Jan., 2003
QA/QC, Plant Wide Leak Testing and Repair.
Gulfstream Natural Gas System, Coden AL Mar, 2002 – July 2002
Field Engineer for Natural Gas Booster Compressor Station - Engr Dan Morrow
Managing the QA/QC group for all Mechanical and Piping Inspections
Plant Wide Hydrostatic Leak Testing and Line Flushing of all Systems
System Mechanical and Process Completion Walkdowns for Turnover
Precommissioning and Commissioning performance of Rotating Equipment
Management of Final Walkdowns for Turnover to Client
Nitrogen High Pressure Tightness Testing of all Hydrocarbon Systems
Oxygen Freeing of all systems prior to First Gas
Flare initial start up and Natural Gas introduction to Plant
Run In of Propane Chilling System and Gas Exchangers
Running Maintenance and Performance Testing Support
Harmony/Turner October, 2001 – March 2002
Field Engineer for Vulcan Chemical Co. Geismar, LA
Plant Wide Leak Testing and Repair of all Systems, Management of Final Walkdowns Turnover to Client, Troubleshooting for bringing plant to NOC, Conducted Closing End Inspection and Line Commissioning, Managing the commissioning and QA/QC
Four Star Contractors January, 1995 – October, 2001
Shop QA/QC and Pipe Fitter Baton Rouge, LA
Supervision of Hydrostatic Strength Tests, Responsible for coordination of all piping installation by use of Isometric Drawings, Line lay-outs for Fabrication, Weld Mapping, Stencils of X-rays
Performance Contractors January, 1980 – January, 1995
Field QA/QC and Pipe Fitter
Activity in various industrial sites, including general maintenance in co-polymer production site. Responsibilities included Job Foreman, Safety coordination, and Work Permitting…etc.
Personal
Have maintained excellent physical personal health, and am highly capable of “hands on” type of work. I have worked my way from bottom to become part of a management team by being an example and encouraging others to their highest level possible.
Personal References
James Huffman - Chevron email HHUF
Jim Ash - Chevron email ASJC
Dennis Echer - Chevron email DFEC
Jay Pence - Chevron email HPEN
Pete LaCroix H 713-***-**** C 281-***-****
Leonard Dickhaut H 228-***-**** C 228-***-****
James Cooley H 850-***-**** C 619-***-****
Richard Stage C 256-***-****
Education Training
Graduation Istrouma High School 3.6 grade average, National Pipefitter Certificate,
ABC Technical School – 2003, Rolls Royce Turbines/Dresser compressor training,
AWS Fundamental of Welding Inspection – Certificate – AWS.
Ashwood University, Bachelor of Science, Industrial Engineering
Ashwood University, Master of Education, Process Engineering