Post Job Free

Resume

Sign in

piping speacalist

Location:
Walker, LA
Posted:
June 09, 2016

Contact this candidate

Resume:

***** **** ***** **.. ****** SPRINGS, LA.*****

PHONE: 225-***-**** CELL # 985-***-****

acu53j@r.postjobfree.com

RONALD W. COOK

Summary

Experience

Petrochemical, Oil Gas experience Onshore, Offshore, including Construction QA/QC, Commissioning & Start-Up, Process Operations, Maintenance, with background in Health, Safety & Environmental.

WOODGROUP PSN

MECHANICAL Commissioning Lead –BIGFOOT PROJECT MANAGER, LEONARD DICKHAUT June 2014

Responsibilities

Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre-Start Safety Review.

Mechanical Completion Walk downs with Construction and Client

Finishing all final punch list activities to QA/QC acceptance

Performed As Built Drawings for the Client with the Design Engineer

Vessel, Line, and Equipment inventorying for flushing, circulating, and line cleaning. Coupled Loaded 4 hour Pump and Motor Run ins.

Blower and Compressor make-ready for initial starts and runs

Coordination with Construction, Client, and Commissioning for Permits to Work and all HSE issues

Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre- Start Safety Review.

Performed As Built Drawings for the Client with the Design Engineer

Chevron EGTL/EGP3 Projects Nigeria, January ’09 – June ‘14

Senior Piping Representative, QA/QC – Manager Jim Ash

Responsibilities:

Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre-Start Safety Review.

Mechanical Completion Walk downs with Construction and Client

Finishing all final punch list activities to QA/QC acceptance

Performed As Built Drawings for the Client with the Design Engineer

Performed OJT (on the job training) for all in O2 Cleaning, Pipe fitting; BIC (build it clean) and many other jobs.

Mechanical Completion Walk downs with Construction and Client

Coordination of Confined Space Entries for Internals verification and

Vessel Closures

Electric Solo Motor Run-Ins Monitoring and Reporting

Vessel, Line, and Equipment inventorying for flushing, circulating, and line cleaning.

Experience

Tengiz Chevroil Second Generation Project, Kazakhstan July ‘06 – Nov. 08

Mechanical/Pre-Commissioning Lead - Commissioning Engr. Dan Morrow

Responsibilities:

Superintendant Core commissioning support team

Finishing all final punch list activities to QA/QC acceptance

Superintendant for completion of LPG plant

Punch List Walk downs and Quality Verification Document completion

Mechanical Completion Walk downs with Construction and Client

Coordination of Confined Space Entries for Internals verification and Vessel Closures

Electric Solo Motor Run-Ins Monitoring and Reporting

Vessel, Line, and Equipment inventorying for flushing, circulating, and line cleaning.

Coupled Loaded 4 hour Pump and Motor Run ins.

Blower and Compressor make-ready for initial starts and runs

Coordination with Construction, Client, and Commissioning for Permits to Work and all HSE issues

Coordination and Performance of Final Walk downs and Turnover to Client following Custody Transfer, Technical Commissioning, and Pre- Start Safety Review.

Performed As Built Drawings for the Client with the Design Engineer

BP Thunderhorse Offshore Drilling and Production Platform June ‘04 – July ‘06

Mechanical/Process Commissioning Lead, QA/QC. Commission Eng. Dan Morrow

Responsibilities:

QA/QC Inspections to verify proper construction methods and materials

Supervision of QA/QC Mechanics during Construction Phase.

Punch List Walk downs and Quality Verification Document completion

Mechanical Completion Walk downs with Construction and Client

Coordination of Confined Space Entries for Internals verification/alignments and Vessel Closures

Electric Solo Motor Run-Ins Monitoring and Reporting

Vessel, Line, and Equipment inventorying for flushing, circulating, and Coupled Loaded Pump and Motor Run ins.

Blower and Compressor make-ready for initial starts and runs

Coordination with Construction, Client, and Commissioning for Permits to Work, Start-Up Activity and Control Board DCS, HMI) communications

Integral in the Turnover to Client all systems of Topsides, and several items located in the Hull.

Performed As Built Drawings for the Client with the Design Engineer

Harmony Const. QA/QC Supervising Field Engineer Jan.2004 – June 2004

Responsibilities include Mech. Completion Walk downs with Construction and Client Managers, Doug Simoneaux, Don Richard

CS Metals Supervisor, Dan Huzar Nov., 2003 – Jan.2004

Responsibilities include Foreman, Piping Hydro and Consultant

Gulf South, Harmony Supervisor, Bubba Dikes July, 2003 – Nov., 2003

Responsibilities include QC and Leader man, Construction, Commissioning and Start-up

Motiva with Turner Industries Jan., 2003 – July 2003

QA/QC Plant Wide Leak Testing and Repair of all Systems.

Dow Chemical, Supervisor Doug Simoneaux July 2002 – Jan., 2003

QA/QC, Plant Wide Leak Testing and Repair.

Gulfstream Natural Gas System, Coden AL Mar, 2002 – July 2002

Field Engineer for Natural Gas Booster Compressor Station - Engr Dan Morrow

Managing the QA/QC group for all Mechanical and Piping Inspections

Plant Wide Hydrostatic Leak Testing and Line Flushing of all Systems

System Mechanical and Process Completion Walkdowns for Turnover

Precommissioning and Commissioning performance of Rotating Equipment

Management of Final Walkdowns for Turnover to Client

Nitrogen High Pressure Tightness Testing of all Hydrocarbon Systems

Oxygen Freeing of all systems prior to First Gas

Flare initial start up and Natural Gas introduction to Plant

Run In of Propane Chilling System and Gas Exchangers

Running Maintenance and Performance Testing Support

Harmony/Turner October, 2001 – March 2002

Field Engineer for Vulcan Chemical Co. Geismar, LA

Plant Wide Leak Testing and Repair of all Systems, Management of Final Walkdowns Turnover to Client, Troubleshooting for bringing plant to NOC, Conducted Closing End Inspection and Line Commissioning, Managing the commissioning and QA/QC

Four Star Contractors January, 1995 – October, 2001

Shop QA/QC and Pipe Fitter Baton Rouge, LA

Supervision of Hydrostatic Strength Tests, Responsible for coordination of all piping installation by use of Isometric Drawings, Line lay-outs for Fabrication, Weld Mapping, Stencils of X-rays

Performance Contractors January, 1980 – January, 1995

Field QA/QC and Pipe Fitter

Activity in various industrial sites, including general maintenance in co-polymer production site. Responsibilities included Job Foreman, Safety coordination, and Work Permitting…etc.

Personal

Have maintained excellent physical personal health, and am highly capable of “hands on” type of work. I have worked my way from bottom to become part of a management team by being an example and encouraging others to their highest level possible.

Personal References

James Huffman - Chevron email HHUF

Jim Ash - Chevron email ASJC

Dennis Echer - Chevron email DFEC

Jay Pence - Chevron email HPEN

Pete LaCroix H 713-***-**** C 281-***-****

Leonard Dickhaut H 228-***-**** C 228-***-****

James Cooley H 850-***-**** C 619-***-****

Richard Stage C 256-***-****

Education Training

Graduation Istrouma High School 3.6 grade average, National Pipefitter Certificate,

ABC Technical School – 2003, Rolls Royce Turbines/Dresser compressor training,

AWS Fundamental of Welding Inspection – Certificate – AWS.

Ashwood University, Bachelor of Science, Industrial Engineering

Ashwood University, Master of Education, Process Engineering



Contact this candidate