AKHILESH .V. NANDU Welding/Painting Inspector / Mechanical Engineer
**************@*****.*** +91-984*******
EDUCATION
B.Tech in MECHANICAL ENGINEERING
AWS CERTIFIED WELDING INSPECTOR C . Number: 12021551
B GAS CSWIP Gr.2 -CERTIFIED PAINTING INSPECTOR C . Number: 633635
ASNT Level II in Radiographic Testing, Ultrasonic Testing, Magnetic Particle Testing ASNT Level II in Liquid Penetrant Testing
PROCESS PIPING DESIGN and ENGINEERING AS per ASMEB-31.3
COMPUTER SKILLS ;
AUTOCAD, MS OFFICE, MS PROJECT, PRIMAVERA-6
TRAINING ATTENDED :
: API 570 Piping Inspector Preparatory Course at Chennai, India
: ISO 9000:2008 Internal Quality Auditor Training (KSPC, Kalamassery, Kerala
: Permit To Work (PTW), H2S, Fall Protection Borouge-3, UAE &Sadara HP-LDPE, KSA
Languages Known : English/Hindi/Tamil/Malayalam
Total Experience : 5.5 Years
Experienced in deployment of Quality Assurance /Quality Control/Inspection, Construction and Pre Commissioning functions of Oil & Gas, Petrochemical/Refinery industry.
Experienced in Preparation and review of Testing Procedures, Test Plan/ Packs, WPS, PQR,Work Procedures, Inspection Test Plan and method of statements.
Well conversant in inspection related activities of welding, painting/coating, Non Destructive testing of structural, piping, pipe line (structural, storage tanks, pressure vessel, fired heaters etc.).
Handled more than 40 numbers of welding team and team of 25 peoples for painting during construction phase.
Actively participated in Inspection, Pre commissioning and commissioning activities of Static and Rotary Packages
TESTING & INSPECTION SERVICES ARABIA (TISA), UAE
Position : RESIDENT QC INSPECTOR PIPING, WELDING & PAINTING
Period : 28-Februvary-2016 to 26-May-2016
Project: SEC-WORLEY PARSONS PROJECT, KSA
Presently working as a Resident QC Inspector for STF SPA at Al-Shabia Engineering, Hamriyah FZE, UAE
-Monitoring and Inspection of Fabrication, Welding and Painting activities of Piping and Mechanical jobs as per client Specifications
-Submit daily report to Team Leader which includes Inspections done, Results, Area of concern, NCR, SDR, Close out Status.
-Review of Contractors Quality Plan, ITP
-Review of Raw Materials and Consumable certificates
-Review weld Parameters of SMAW, GMAW, GTAW, FCAW, SAW to be within range as specified in WPS
-Perform Hold, Witness and Surveillance inspections.
-Interpretation of Radiography films and review of reports, witness UT, PT, MT tests and review results
-Witness, Carry out visual, dimensional Inspections(stage wise and final)
-Verification of PMI, Mill Test Certificates
-Preparation of QC weekly reports
-Review of Dossiers
-Witness, Inspecting and Monitoring the following Painting, Coating activities as per Specifications and Standards
.
TECNIMONT ARABIA, SADARA HP-LDPE Project, Al Jubail, KSA
Position : WELDING AND PAINTING INSPECTOR
Period : 13-March-2015 to 22-December-2015
-Inspection and verification of Incoming material with MTC
-Conduct Welding Procedure Qualification Tests and Welder Qualification Tests in accordance with Standards and Codes
-The Welding Includes SMAW and FCAW
-Responsible for maintain and Improve welding quality and minimize rejection percentage
-Documentation of files and final reports
-Maintain all QC documents related to all Stage Wise Inspection
-Inspection of Surface Profile with Testex Tape and Profile Gauge
-Inspection of Paint materials to confirm batch number, Manufacturing and Expiry Dates
-Observe Mixing of Paint Materials, to see they are mixed Properly
-Recording weather parameters, Surface profile, WFT and DFT
-Preparation of Inspection Requests and Reports, witness Inspection With Client
TECNIMONT ICB, BOROUGE-3 Project, Al-Ruwais, AbuDhabi
Position : Welding and Painting QC Inspector
Period : 25-02-2012 to 07-02-2015
-Project Experience Includes Inspection Related activities of Welding, Painting, Non Destructive Testing
-Conducting Welders Qualification Test, Surveillance of welding Activities throughout the site
-The Welding Includes SMAW, GMAW, The Welding of Dissimilar Metals
-Planning the Welding activities, Preparation of WPS and maintain Constant Contact with Project Team and Client
-Co-ordination of welding Procedure qualification, Certify Welders
-Checking of Welding Consumables in the Storage and identification
-Monitoring Site welding Activities
-Reviewing RT film of weld joints
-Witness hydro test, Pneumatic Test
-Preparation and Implementation of Inspection Test Plans
-Review of Test pack
-Clear NCRs after meeting with client
-Issue CPAR if company failed to meet Specifications, Standards or Procedures
-Control of Repair welding. Prepare and Submit Inspection Offer letters to client/consultant
-Familiar with various types of Coating methods and Their application
-Performing the Surface preparation Inspection Prior to Painting
-Performing the Painting Inspection throughout the site and checking DFT of Painted areas, Galvanized Objects.
TECNIMONT ICB, MRPL, Mangalore, India
Position : Supervisor
Period : 06-12-2010 to 10-12-2011
-Worked as a supervisor for the fabrication of different types of Panel Base Frames. Instrument Stanchions, different types of Unisted base plates, Bus duct Supports etc
-There was Direct man Power handling up to60 members
-Performing other duties associated with the Project when Required
-Holding an account of 40 welders
-
MICA ENGINEERING PRIVATE LTD, Vasai, Mumbai, India
Position : Mechanical Engineer/QC
Period : 08-05-2010 to 22-11-2010
-Worked as a Mechanical Engineer For the Company’s day to day activities and Involved in QC related works for welding(GTAW and GMAW) and Galvanizing
-Arranging Proper Man Power, Responsible for maintaining an up to date document/drawing register
-Maintain files and Generates electronic/ hard Copies for all documents and Drawings
-Preparing PDI(Pre-Dispatch Inspection) Report, DIR(Detail Inspection Report), checking and making quality assurance for materials manufactured in the company for company such as Mahindra, Force motors, Tata
Trainings
Industrial Training in Kerala Minerals and Metals Industrial Limited, Chavara for a period of one month for the project on Predictive Maintenance training at Kerala Minerals through condition monitoring
Vocational Training at KSRTC Central works, Thiruvanamthapuram.
PERSONAL DETAILS
Address : Valiamannil Puthen Veedu, Thengumkavu P.O -Pathanamthitta.
Kerala Pin: 689646, India
Date of Birth : 06-10-1986
Gender : Male
Marital Status : Married
Father’s Name : V.M. Nandakumaran Nair
Nationality : Indian
Passport Number Issued Place : H0566064. Expiry date : 23-9-2018, Trivandrum
Contact Numbers : +91-984*******
E-mail: **************@*****.***