CURRICULUM VITAE
QA/QC INSPECTOR– PAINTING/COATING
B.RAKESH KUMAR (B.E.,)
Contact No: +968-********
E-mail: *************@*****.***
CERTIFIED BGAS GRADE-2 PAINTING INSPECTOR
BGAS- British Gas Approval Scheme
Certificate No: 49119; Approval No: BG 602633
Issue date: 08 Sep 2010; Expiry date: 22 July 2020
EDUCATIONAL QUALIFICATION:
Bachelor Degree in Mechanical Engineering (2003-2007) 72%
EXPERIENCE – 7 Years & 7 months
CAREER OBJECTIVE:
To pursue a challenging job in a competitive field and deliver a higher standard of all aspects in the industry, also ensuring goals and objectives are accomplished in accordance with outlined priorities and requirements.
EMPLOYMENT RECITAL:
Company: Petron Gulf
Project: Sohar Refinery Improvement Project (SRIP)
Client: Oman Oil Refinery and Petroleum Industries Company (ORPIC)
Location: Sohar - Oman
Position: QA/QC-Inspector (Painting/Coating)
Duration August 2015 – till date
Company: Descon Engineering Limited
Project: Overhaul of Crude Oil Storage Tank - Offshore
Client: Abu Dhabi Oil Company (ADOC)
Location: Offshore – Mubarraz Island, U.A.E
Position: QA/QC-Inspector (Painting/Coating)
Duration February 2015 – April 2015
Company: Descon Engineering Limited
Project: Ruwais 4th NGL Shutdown
Client: GASCO (Abu Dhabi Gas Industries)
Location: Ruwais, Abu Dhabi-U.A.E
Position: QA/QC-Inspector (Painting/Coating)
Duration December 2014 – January 2015
Company: GASCO (Abu Dhabi Gas Industries)
Project: Ruwais 1st NGL Shutdown
Location: Ruwais, Abu Dhabi-U.A.E
Position: QA/QC-Inspector (Painting/Coating)
Duration October 2014 – November 2014
Company: Petron Engineering & Construction Ltd
Project: Paradeep Refinery Project
Client: IOCL (Indian Oil Corporation Ltd)
Location: Odisha-India
Position: QA/QC-Executive Engineer (Painting/Coating)
Duration June 2013 – July 2014
Company: Larsen & Toubro Ltd
Project: Shah Gas Development Project Package-5
Client: Al Hosn Gas
Location: Abu Dhabi-UAE
Position: QC Engineer – Coating & Painting
Duration: Feb 2012 – Apr 2013
Company: Spiecapag
Project: ALNG Pipeline Project
Client: Angola LNG
Location: Soyo-Angola
Position: QC-Coating/Painting/Fire Proof Inspector
Duration: Mar 2010 – Dec 2011
Company: Archirodon Construction LLC
Project: Ruwais 3rd NGL Train Project
Client: GASCO (Abu Dhabi Gas Industries)
Location: Abu Dhabi-UAE
Position: QC-Painting Inspector
Duration: Nov 2007 – Jan 2010
Duties & Responsibility of Inspection:
Painting/Coating task includes:
Carrying out Inspection of Surface Preparation & painting works for Tank’s, Structural steel, External & Internal Pipeline, Column, Vessel & Piping.
Evaluated Inspection & Test Plan (ITP) and conducting PQT for Painting/Coating procedures.
Experience of Inspection on FBE, 3LPE in vendor manufacture pipe and for Pipeline Coating, Field Joint Coating, Heat Shrink Sleeves and Visco-Elastic Coating System Wrapping for below ground pipes.
Ensure weather conditions are acceptable in line with applicable standards/ specifications (Environmental, time and economic constraints).
Ensure manufacturer’s instructions and MSDS are followed while handling & storage of Painting/Coating materials abrasives at site.
Ensure that data sheets are available, material traceability is maintained and correct material used.
Monitor performance of contractors, ensure Applicators are competent and where required have valid certification for the process in use, equipment is in serviceable condition.
Ensure inspection and test equipment is serviceable, with in calibration period and personnel are knowledgeable in its use.
Ensure weld area is covered before blasting, where pressure testing is not completed.
Ensure protection of flange serration, instruments etc before blasting.
Ensure surface preparation blast profile/cleanliness meet requirements.
Carry out inspection of surface profile, chloride contamination test as per applicable standards
Monitor surface preparation, application of CTE coating and post curing tests on pipeline.
Monitor surface preparation, application of heat shrink sleeves, holiday tests on field joints.
Monitor surface preparation, wrapping (Servi wrap M 30 B), holiday detection on offshore pipeline.
Monitor surface preparation, application of bonding agent, elastomer, wrapping and curing operation (for Neoprene coating) on riser pipes / clamps.
Continuous monitoring of surface cleanliness and record surface profile (Should take place at least three times during the coating process: before any surface preparation activities starts, after surface preparation, before coating begins and between each application of coating in a multi-coat system).
Monitor wet film thickness during application and application technique.
Monitor dry film thickness and recoating intervals.
Ensure any identification marks or tags removed or over coated are replaced.
After the full curing activity conduct visual inspection and specified non-destructive and/or destructive tests.
Visual inspection after each coat (Verify correct shade, degree of gloss and evenness and be free from tackiness after drying/curing and free from cracks, holidays, runs sags, wrinkles, patches, brush or roller marks or other defects that may deleterious to the quality of the coating).
Witness destructive tests as applicable in accordance with the project specifications (Holiday detection, Adhesion testing, Impact resistance testing, Cathodic dis-bondment testing, Thickness of coating on steel body, Thickness of coating on weld bead, Peel test, Overall degree of adhesion,voids exposing bare metal).
Check for any damages and defects upon completion of the each stage of painting/coating works.
Carrying out failure analysis assessment for old coating systems, recording and reporting coating failure analysis according to the standardized report form (defect, size, distribution, pattern and shape) and advising of repair system and procedure.
KNOWLEDGE PREVIEW:
Alkyd Enamel, Aluminum Pigment Alkyd Coating, Epoxy Coating, Inorganic Zinc Coating, High Build Polyamide, MIO, Polyurethane, Epoxy Mastic Coating, Glass Flake Epoxy Coating, Pyrocrete, Coal Tar EPOXY, FBE, Heat Shrink Sleeves, Thermal Insulations etc.
Whirling Hygrometer, Dew Point Calculator (Elcometer E319), SURFACE profile Gauge (Elcometer E123), Testex Tape, Hypodermic Needle Gauge, Salt Contamination Meter (Elcometer SCM400), Pin Hole Detector (Elcometer E270), Wet Comb Gauge (Elcometer
E1120, Dry Film Thickness Gauge (Elcometer E456), Dolly Adhesion Tester & Foil Thickness Gauge( Elcometer E124).
Pipes, Fittings, Pressure Vessels, Mud Tank, Fuel Tank, Power Skid, BOP trailer assembly, Brine Tank, Circulation Tank, Mast & Substructure and various oil & gas related equipments & structures.
Conversant to most of the International codes & standards of NACE, SSPC, BS, ASTM, ISO.
PERSONAL DOSSIER:
Date of Birth : 27th March 1985
Languages Known: English, Hindi, Tamil and Portuguese
Nationality : Indian
Marital Status : Married
Permanent Address: No. 162, S.S Manickapuram, Tuticorin - 628001, Tamil Nadu-India
Passport Details : L 4146212; DOI: 18.09.2013; DOE: 17.09.2023
(Old Passport No: F 9736668)
DECLARATION:
I hereby inform that the above information is true to my knowledge and i will work to satisfy the arising expectation.
Date:
Place: (RAKESH KUMAR.B)