Objective:
To obtain a responsible position that utilizes my experience in
telecom/transmission engineering and project implementation responsible for
all aspects of turnkey telecom project.
Professional Summary:
An experienced telecommunications professional involved in turnkey projects
that included:
. Project Engineering from conducting site & LOS surveys, microwave link
design (backhaul/backbone) and performance analysis using Pathloss
V4/V5 and Google Earth, RF planning and interference analysis to
developing contract unit lists and BoMs.
. Project Management and Implementation. Tracked daily progress, updated
schedules, participated in progress meetings. Involved in
installation, test and commissioning of assigned microwave projects.
Latest project: Saudi government's Public Safety Radio Network using
Aviat microwave, Motorola MTS4 BTS, Antennas and sub-systems.
. Developed project documentation packages from Propagation Survey
Reports, Acceptance Test Procedures and test data sheets to Method of
Procedures (MoP), including redlining and as-built documents. At
Sprint, approved construction drawings.
. Network management system (NMS) deployment using Cisco Routers,
Inverters, HP Server and Client PCs. Upgraded the microwave NMS and
tested all connected network elements. Installed IP addresses to radio
terminals that used OSPF routing protocol.
. Managed the redeployment of Nokia BTS terminals that included bar
coding inventory, reconfiguring, retesting, repacking and sending back
to another site with all accessories.
. Pre-sales engineering support. Authored turnkey proposals for
microwave systems and a Fiber Optic link.
. Strong knowledge in telecomm engineering concepts, fundamentals and
theory of PCM, SDH/PDH and SONET multiplexing plus Gigabit/fast
Ethernet.
. Windows PC user with Outlook and user of MS Office, MS Project and
Visio applications.
. Ability to multi-task and work with mixed cultures and nationalities.
. CCNA/CCNP online courses leading to Cisco certifications completed on
Sept 3, 2015.
. Passed the Ventura County Oral Board Exam & pre-interview for a
Telecom Network Specialist position taken on Sep 25 & Oct 6, 2015,
respectively.
. Recently completed online courses leading to wireless certifications
(CWNA & CWSP).
Experiences:
1. RF Engineer IV (Microwave), Sprint (Contractor: Nexius/FPG), 12524
Sunrise Valley Dr, Reston, VA 20191, Feb 2, 2016 to Apr 1, 2016 (Full
time: 40 hours/week)
. Evaluated the line-of-site (LOS) of proposed cellsites linked to
other candidates and/or donor sites using Pathloss V5 and Google
Earth Pro, in New York, VA, DC and MD.
. Updated Sprint databases (ClearVision, Appian, EPT) to reflect recent
changes.
. Attended and participated in presentations conducted by Ceragon,
DragonWave and Fastback Network Solutions on their latest microwave
product offerings.
. Reviewed and participated in approving construction drawings of cell
sites.
2. SR Microwave Engineer, Capital Hills Co. (formerly HATCO), PO Box 10510,
Riyadh 11443, Saudi Arabia; from Oct 1, 2004 to Apr 30, 2014 (Full time:
48 hours/week)
. Oversaw the installation, testing (with 24hr BER) and commissioning
of Aviat's Eclipse MW radios or Saudi MOI's Public Safety Radio
Network with electrical or optical interfaces. It also included
Motorola MTS4 base stations, GPS, IP phones, Patch Panels/DACs (CAT5)/
Rectifiers/ Inverters/Batteries, HD Camera and OMNI/Parabolic
antennas/feeders. Technical support in troubleshooting systems and LOS
issues.
. Project management and implementation (completed in 2010) of the
rollout of MTC's (Zain) backbone microwave system using Siemens SRA4 &
SRT1F SDH radios and hiT7070 series ADM/MUXs (32E1 to STM-4(OC12), a
NSN/Nokia sub-contract.
. Using Aviat Networks Eclipse packet MW radios, installed, tested and
commissioned 82 digital MW links of up to 400Mb/s capacity in
Abha/Khamis area for STC's LTE field trial (via a Samsung/Aviat
Networks subcontract, Sep-Dec 2011).
. Lead man responsible for system engineering, installation, testing and
commissioning of J2007 Project of Saudi Telecom Co.(STC) using Nera
InterLink and Evolution SDH radios including CISCO Routers &
Inverters, Nera NetMaster NMS & HP server. Configured each radio
terminal with IP and Subnet addresses and set it to work on OSPF
routing protocol.
. In-charge (Year 2005) of dismantling, reconfiguration, inventory &
retesting for redeployment of over 120 Nokia BTS cabinets at the HATCO
testing facility (R02).
. Responsible of receiving from other Contractors decommissioned cell
site equipment for storage that included shelters with all cabinets
and outdoor equipment, tower steel, antenna mounts and perimeter
fencing hardware.
. Implemented a field trial microwave link for STC using Dragonwave
Horizon (3 hops).
. Involved in LOS and site surveys and supervised the
implementation/commissioning of a microwave ring around Riyadh for
Saudi Oger using E-Band 70/80 GHz equipment.
. Prime Engineer (year 2006-2007) in the turnkey system engineering of
the SDH backbone network of the 2nd UAE Operator, du, a Nokia Sub-
contract. Over 40 microwave hops in 4 rings, deployed Nera Interlink
SDH radios (up to 4+1) and Andrew antenna systems. The scope also
included site/LOS surveys, installation, acceptance testing &
commissioning phases. Configured each radio terminal with IP and
Subnet addresses and set it to work on OSPF routing protocol.
. Prepared and submitted (year 2008) a proposal for a complete microwave
system (STM-1, 1+0) for MODA Border Security Project (for EADS Defense
& Security) consisting of 39 sites using Nera Evolution radios in the
Northern Border of Saudi Arabia.
. Prepared and submitted to GPT (SANG) a proposal for 25km OSP Fiber
Optic link from MODA HQ to Riyadh SANG HQ using Single Mode (G.652D
24F & G.655 24F) FO cables.
. Developed Method of Procedures, Floor Plans, DC power calculations,
schedules and test procedures/forms for the field teams using SW
applications MS Office, MS Project, Visio, Outlook (for emails) and
AUTOCAD. Generated request for licensed RF channel utilization and
submitted these to Saudi Spectrum Management organization.
3. Systems Engineer (Transmission), House of Invention Int'l, PO Box 15963,
Riyadh 11454, Saudi Arabia; From Jan 1, 2003 to Sept 30, 2004 (Full
time: 48 hours/week)
. Turnkey engineering of 53 SDH microwave sites being upgraded and 19
SDH microwave sites with new systems (total value: SAR 25m), a part of
TEP450K project of STC.
. Prepared Propagation Survey Reports and Method of Procedures (MoP)
that included work description, contract unit list, frequency plans,
system availability calculations and installation details.
. As a part of Junction 2003 Project of STC, was involved in system
engineering of 8 microwave links awarded to Nera/HOI using Nera's
CityLink SDH Radios and using Pathloss V4.0 design software.
4. Principal Engineer (Microwave) B-Level, Lucent Technologies (SA)
formerly AT&TI (from Western Electric International, Saudi Arabia), PO Box
4945, Riyadh 11412, Saudi Arabia;
From Jan 1, 1981 to Dec 31, 2002 (Full time: 40 hours/week)
. Turnkey system engineering of PDH and SDH (STM-1/OC3) microwave radios
(up to 7+1) and antenna systems including associated AT&T digital
MUXs/ADMs(STM-1/OC3) to STM-4/OC12) of the TEP6/GSM Expansion Project.
It also included DDFs, Network Management System (NMS), TV and Audio
Codecs, DC power and later engineered Lucent's Acculink and AnyMedia
Access Systems. Developed BOMs for equipment ordering. Authored a
network design for the microwave links.
. Prepared Contract Change Orders as requested by Saudi Telecom Co.
(STC) for new sites and/or new contract units not in the original
TEP6/GSM contract.
. Conducted frequency coordination studies and RF interference
calculations of the expansion microwave hops and generated radio
license applications for approval.
. During summer vacation, was assigned to coach a few Saudi Trainees who
were on on-the-job training with Lucent on the aspects of radio
engineering used in Saudi.
. Participated in the radio propagation (fading) investigation conducted
by Bell Labs in 2 microwave hops of Route 32 (1990-1991), after
visiting a site in Parr, Florida.
. Worked at AT&T main office (1988) in USA providing engineering
assistance in the preparation of international bids for the
Philippines (PLDT), Thailand, Chile and Bolivia.
Education:
. Career Academy online courses in CCNA/CCNP certifications,
completed Sept 3. 2015
. IEEE Self Study Course in Cellular Radio & Personal Comm.,
02/1997
. IEEE Self Study Course in Satellite Communications, 10/1995
. CREI Home Study Course in Minicomputers & Microprocessors, 1978
. CREI Home Study Course in Electronics Engineering Technology,
Major in Communications Engineering, 1974
. BS Ind. Educ., Major in App. Electronics, DMMMSU(formerly
LUSAT), Philippines, 1966
Equipment Utilized:
. Microwave products from Aviat, ALU, Nera, DragonWave, Siemens(NSN), E-
Band, AT&T and Rockwell-Collins; Multiplexers from AT&T, WECO, NSN and
Marconi; Test sets from Anritsu, HP/Agilent and Fluke; GPS from
Trimble and Garmin.