HARON C. ESPERA
Profession : Electrical Engineer
Permanent Address : Sta. Maria Bulacan, Philippines
Current Address : Tamuning, Guam
Contact Number : +1-671-***-**** (Guam)
: +639********* (Phil)
Email Address : ***********@*****.***
Skype Name : harth08
Objective:
To enter a work that will contribute my expertise and will expand my professional development.
QUALIFICATIONS:
Licensed Electrical Engineer (PRC Registered No. 0032434) (Philippines)
Total of eleven (11) years of experienced as an Electrical Engineer
Three (3) years experienced in Oil and Gas construction in Saudi Arabia with various SAUDI ARAMCO projects
Approved QA/QC Electrical Inspector under ARAMCO Projects (SAP No. 70007033)
Approved Quality Control U.S. Army Corps of Engineering (CQMC)
Experienced in inspection /construction of Buildings, Oil and gas, Cathodic Protection and Industrial Water Distribution and Pumping Station (33Kv Substation, Electrical Bldg. & Pump Station Bldg.)
Experienced in High rise building construction
Skilled in MEP and EPC projects
Handled equipment like MV switchgear, Line Dist. Panel, Protection Panel, Busbar Protection Panel, Hsbts, Distribution Transformer, Phase Shift Transformer, LV MCC, SMDB, MV Cables, VSD, MV motor, UPS System and Cathodic Protection
Well-versed in Project Estimating, Costing, Implementation, Controlling, Inspection and Supervision
Capable in Electrical Design, Project Planning and Scheduling
Proficient in Windows, MS Office (Word, Excel, PowerPoint), Auto CAD and Primavera
Flexibility in the job and ability to deal with different kinds of people
With Philippines, Singapore, Guam, and UAE driving license
JOB EXPERIENCE:
COMPANY: Core Tech International
(NAVFAC Main Contractor)
ADDRESS: 388 South Marine Corps Drive, Ste. 400, Tamuning Guam 96913
POSITION: Project Electrical Engineer
PROJECT: 4 Towers High Rise Building & PAR Tanker Hangar Project
DATE: February 2015 to Present
JOB DESCRIPTION:
Package design reviews. Evaluate project specifications, ensure to that all documents are approved before commencing to inspection. Approved Material submittal, Approved Shop Drawing, Approved Method Statement and Approved ITP. Reporting direct to Site Superintendent. Ensure work compliance under NAVFAC, Electrical Engineering Standards, IEEE, NEMA, IEC, BS, NFPA, and other internal standards for electrical installation that will apply on the project.
COMPANY: STFA Marine & Building Construction Co.
(SAUDI ARAMCO Main Contractor)
ADDRESS: No.307, Al Tamimi building 3rd floor, King Abdullah Road, P.O. Box 32447, Al 31952, K.S.A Khobar
POSITION: QA/QC Electrical Inspector
PROJECT: Building Dareen Port Expansion Project (BI No. 10-004**-****-***)
DATE: February 2013 to December 2014
JOB DESCRIPTION:
Package design reviews. Evaluate project specifications, Prepare quality control plan, Develop inspection test plan and procedures. Go to the project site for inspection to ensure the quality and standard of work prior to schedule of RFI from Aramco Inspectors. Ensure company compliance with Saudi Aramco Electrical Engineering Standards, IEEE, NEMA, IEC, BS, and other internal standards for electrical installation in gas and oil processing facilities. Attend project MCC. Preparation of as-built drawings and other QA/QC documentation as per project finished.
COMPANY: TORISHIMA PUMP MFG. CO. LTD
(TRANSCO Main Contractor)
ADDRESS: Office No. 503, AlSalmeen, Golden Tower, Electra Street, P.O. Box : 53567 Abu Dhabi, U.A.E
POSITION: Project Electrical Engineer
PROJECT: ALAIN Water Distribution Network (Pumping Station at AARC, Contract No. N6820)
DATE: May 2010 to October 2012
JOB DESCRIPTION:
Have full awareness of contract requirements and procedures. Ensure agreed testing procedures for inclusion in work method statement. Ensure proper maintenance, calibration and operation of all testing equipment and all specified standard are available and their requirements observed. Liaise with Consultant staff. Carry out inspection of materials and equipment at site. Review and accept the record and issue acceptance / rejection notes and non-conformity reports. Update the Quality Manager in weekly basis. Where appropriate the summary of inspection of materials and equipment at site and their acceptance note. Witness the inspection and testing of the construction work, review inspection and test record and verify that the construction work complies with the inspection and testing requirements.
COMPANY: COFELY SOUTH EAST ASIA PTE LTD
(Land Transportation Authority Contractor)
ADDRESS: 146B Paya Lebar Road #03-01 Singapore (409017)
POSITION: Lead Engineer
PROJECT: Electrical Maintenance of East side of Singapore under LTA Government
DATE: July 2008 to November 2009
JOB DESCRIPTION:
Construction, Maintenance and troubleshooting of the Commuter Facilities, which is Pedestrian Overhead Bridge (POB), Footpath (FP), Cover Link way (CL), Vehicle Bridge (VB) and Bus Shelter (BS) in its Lighting fittings and Lightning protection system. Coordinate to Project Manager and LTA officer for daily work activity, attending monthly meeting to the LTA for further briefing and project instruction. Calculating and updating the Lux illumination of the Commuter Facilities in order for the better view of the public citizen. Checking and monitoring the control box and electrical earth pit as per quarterly schedule. Prepare the submission for monthly scheduled documents as per LTA requirements.
COMPANY: MOH’D AL-MARAE MODERN EST. (AME)
(Short and Long Form Contractor of ARAMCO)
ADDRESS: P.O. Box 46 Abqaiq 31992 Kingdom Saudi Arabia
POSITION: QA/QC Electrical Inspector
PROJECT: Short and Long form contract, Oil and Gas Pipe line construction
DATE: February 2006 to March 2008
JOB DESCRIPTION:
Package design reviews. Evaluate project specifications, Prepare quality control plan, Develop inspection test plan and procedures. Go to the project site for inspection to ensure the quality and standard of work prior to schedule of RFI from Aramco Inspectors. Ensure company compliance with Saudi Aramco Electrical Engineering Standards, IEEE, NEMA, IEC, BS, and other internal standards for electrical installation in gas and oil processing facilities. Attend project MCC. Preparation of as-built drawings and other QA/QC documentation as per project finished.
PROJECT FINISHED:
Installation of PDHMS Surface Equipments E&I for Oil Well HRDH-201
Installation of PDHMS Surface Equipments & Control Device E&I for HWYH-334
Installation of PDHMS Surface Equipments & Control Device E&I for ANDR-502
Installation of PDHMS Surface Equipments & Control Device E&I for SDGM-224 Gosp-1
Installation of PDHMS with Well Dynamics (SHS) for Oil Well SDGM-496 to SDGM Gosp-6
Tie-In SDGM-529 Flow Line to SDGM GOSP-1
Tie-In ANDR-529 Flow Line to ANDR GOSP-1
COMPANY: MIESCOR BUILDERS INCORPORATED (MBI)
(Manila Electric Company Contractor)
ADDRESS: Bacood St. Lubiran Sta. Mesa Manila, Philippines
POSITION: Distribution Engineer
PROJECT: Electrical Maintenance of Network underground cable
DATE: July 2004 to December 2005
JOB DESCRIPTION:
Updating all Data files of network underground cable connection and transformer. Monitoring, coordinating and organizing the field project. Making work order for the Sub-contractor for their billing. Scheduling for monthly Preventive maintenance of old Pad Mounted Transformer. Operating MERALCO software such as Operation Troubleshoot Management System (OTMS), Work Order Management System (WOMS), and Facility Management System (FMS).
COMPANY: TECHWERK SYSTEM CORP.
ADDRESS: Sta. Cruz, Manila Philippines
POSITION: Field Engineer
PROJECT: 14 Storey Bldg.
DATE: December 2003 to June 2004
JOB DESCRIPTION:
Package design reviews and construction plan schedule preparation. Materials take off, and preparation of project specifications. Coordinate with purchasing and warehousing department to obtain materials on time and required quantity. Supervises all types of electrical and instrumentation works to ensure excellent execution in accordance with approved plans and specifications. Measuring the work performance to ensured the proper utilization of resources. Develop project contingency plan, evaluating options and devising workarounds. Prepare As-built plans prior to MCC scheduled date and directly responsible for the area and everyone’s safety.
SEMINAR ATTENDED:
Construction Quality Management for Contractors - #784
April 22 & 23, 2015 at Tumon, Guam U.S.A
U.S. Army Coprs of Engineers
Confined Space Entry
December 7, 2010 at TORISHIMA Pump Mfg Co. Ltd office
By Safety Zone Consultancy
Basic Traffic Management
August 4, 2009 at The Plaza 7500A Beach Road #04-323 Singapore 199591
By Bond International Consultants Pte Ltd
Quake-Resistant Buildings & Structures
September 27, 2011 at Flora Creek Hotel, Deira, Dubai, U.A.E
By Ocean Rubber Factory L.L.C.
Basic First Aid
April 2, 2012 at TORISHIMA Pump Mfg Co. Ltd Office
By Safety Zone Consultancy
Basic Fire Fighting
April 3, 2012 at TORISHIMA Pump Mfg Co. Ltd Office
By Safety Zone Consultancy
PERSONAL DATA:
Birth Date : February 13, 1982
Birth Place : Tupi, South Cotabato Philippines
Sex : Male
Age : 34 yrs. old
Civil Status : Married
Nationality : Filipino
Language : English, Tagalog
Passport : EB9682246
PROFESSIONAL MEMBERSHIP:
Registered Electrical Engineer - Philippines Regulatory Commission (PRC)
Member of Electrical Engineer - Integrated Institute Of Electrical Engineers (IIEE)
HIGHEST EDUCATIONAL ATTAINMENT:
COLLEGE : Technological Institute of the Philippines (TIP)
DEGREE EARNED : Bachelor of Science in Electrical Engineering
YEAR TAKEN : 1998 to 2003 (March)
CHARACTER REFERENCES:
Available upon request.
I hereby certify that the above-mentioned facts are true / accurate to the best of my knowledge and belief.
Engr. Haron C. Espera