Board of Intermediate & Secondary Education, D G Khan Working as an Assistant Maintenance Engineer from April the 11th, 2013 till now in Nishat Power Limited. The facility contains 11x18v46 Engines with 11 Heat Recovery Steam Generators for a 14 MW Dresser-Rand Steam Turbine. During my stay at Nishat Power major routine chores were, Performing and Planning of preventive and corrective maintenance of,
• 11 x 18V46 Wartsila Diesel Engines.
• 14 MW Dresser-Rand Steam Turbine.
• 11 x AV-6N AALBORG HRSGs.
• Plant auxiliaries e.g. Alfa Laval SA846 & SA 866 Separators, Sperre and Gardner Denver Compressor, ABB Turbo Chargers TPL 76c and other pumps of different types.
• Vibration Analysis on routine readings of Steam Turbine and supported pumps.
• Maintaining demands and arranging supplies of consumable tools and parts while closely coordinating with purchase department and inventory controller.
• To ensure the quality of Fuel oil same as per Engine manual definition, for that Involving various types of detail testing even Plasma Emission spectroscopy. Some major accomplished tasks were as given below, Hassan Mohiuddin
118 Ali Town, Lahore
Mobile: +92-333-*******
Email: ******.******@*******.***
OBJECTIVE:
An able, enthusiastic, skilled and reliable Mechanical Engineer, seeking a co-op position that reflects my three year experience in field of power plant maintenance and operation, skills and personal attributes including dedication, meeting goals, creativity and the ability to follow through. Educational Background
Industrial Experience
• Identification of cooling tower plume grounding and effects and for rectification installation and design study of funnel extensions of cooling tower fans on all cooling towers of SPX.
• Installation of steam trap in steam drums of all HRSGs and also proposed design to avoid mixing of HP steam outlet to super heater and steam entering in steam drum from HP super heater.
• Installation of Low expansion foam extinguishing system which was not part of the project for plant installation.
• Part of installation team with Dresser-Rand Personnel in installation project of new Rotor of Steam Turbine also cyclone separator in Superheated line.
• Installation activity of replacing seven Converteam generators with ABB Generators of capacity 21345 KVA. Also for steam turbine Converteam generator replacing with the Jeuomont generator of capacity 17000 KVA.
• Defining all plant locations on the basis of Wartsila Coding process and also defined Assets for these locations for implementation of IBM MAXIMO 7.6
• Defining work flow, and other flow for MAXIMO 7.6 implementations.
• Outsourcing of parts which were previously in practice to be purchased from Wartsila other sources were searched on a comparative basis purchased and used.
• Formats of all types of report which were in practice were establishing on plant under warstila design and flow were redefined personally as per requirements, also for MAXIMO report generations meters were associated with assets and design implemented.
Some of the main responsibilities from Job Description are given below,
• Work with plant maintenance staff to ensure that the plant facility and equipment are maintained in safe and efficient operating conditions at all time.
• Assist supervisor in scheduling overhauls.
• Provide schedules for normal operating periods, planned and forced outages to maintenance team and contractor personnel.
• Responsible for setting and maintaining the maintenance qualification and specific training standards for personnel.
• Identify and actively seek to improve operations and maintenance, to provide operational reliability and availability, to maximize equipment life and to provide detailed feedback to seniors.
• Responsible for safe working practice at plant.
• Responsible for maintaining housekeeping standards during maintenances. Worked as an Internee for Eight weeks in Maintenance Section Kot Addu Power Company. The facility is an independent power company having a capacity of overall capacity of 1600 MW while section bearing capacity of 397 MW working on a combined cycle operation having Two Siemens V94.2 gas Turbine and a steam turbine was operated by heat recovery of Gas Turbines. SUMMER INTERNSHIP
Design and Fabrication of Solar Stirling Engine.
Excellent management potentials with strong confrontation, persuasion and planning capabilities.
Maintaining all Office documentation with proficiency. Good systematic and analytical problem solving approach. Function well as both independently and as a team member. Adapt easily to new concepts and can adapt myself in an Environment of changing circumstances. Traveling & Hiking mountains, Reading Books & Novels, Watching TV, Internet surfing, Photography and Badminton are some of extracurricular activities. Is runner up from all UET Badminton Tournament.
Will be furnished on demand.
FINAL YEAR PROJECT
INTERPERSONAL SKILLS
EXTRACURRICULAR ACTIVITIES
REFERENCES