ALAN LAGOS PERLAS
***** ******* ***** **** *******, Texas 77082
832-***-**** *********@*****.*** or *********@*****.*** EXPERIENCED SENIOR PROJECT, MECHANICAL & COMMISSIONING ENGINEER Initiation Planning Execution Monitoring & Control Close-out & Completion Dedicated, innovative engineering professional with a combined 27 years extensive oil and gas industry experiences. Highly developed technical knowledge in the execution & management of small and large scale EPC capital projects from inception to completion.
Areas of Expertise:
Excellent Written & Oral Communication
EPC Oil & Gas Project Management
Pre-tender/Post Tender Management
P&ID, UFD & PFD
Fabrication & Erection
MS Office, AutoCAD, PRIMAVERA
Power Generation
U/O Cavern Tanks/Terminals
Manufacturing/Operations/Maintenance
On-Shore & Off-Shore Facilities
QA/QC & NDE
Commissioning/Start-up & Operation
Automation (DCS/SIS)
Process Engineering
Mechanical Engineering
HVAC/NH3 Refrigeration System
ASME, API, TEMA etc.
HSE/PSM
PROFESS IONAL EXPERI ENCES
Exterran Energy Solutions (Integrated Projects), Houston, Texas June 2014 – Up to date Senior Project Engineer
Provided leadership in the successful EPC & EPCM execution of the following projects: Trinmar Mobile Offshore (MOPU) 400 mmscfd jack -up rig Damus, Trinidad, PEMEX-LAKACH 400 mmscfd, Villa Cruz, Mexico, Grady Woodford Cryo Plant (Train 1 & 2), Lindsay Oklahoma
KEY ACCOMPLISHMENTS:
Effectively managed project execution plan for design, specifications and schedule requirements; controlled project costs and expenditures; successfully administered contractor & subcontractor/vendor contracts
Expedited released for on time procurement requisitions.
Organized & managed inter discipline checks per Exterran’s generated document/drawing review & approval procedure.
Prepared project balance of plant activity list and prioritized the same in conformance with project specifications, cost
& schedule.
Ventech Engineering North America, Houston, Texas May 2013 – June 2014 Senior Project Engineer
Achieved project goals and objectives for 20,000 BPSD Dakota Prairie Refinery (DPR) Project following units: Crude Distillation Unit
(Unit 100), Naptha Stabilizer (Unit 500), Diesel Hydro treater (Unit 800), SRU (Unit 1300), Amine Unit (Unit 1200). KEY ACCOMPLISHMENTS:
Managed project deliverables cost and schedule, established project responsibilities by identifying project execution phases and elements; assigned personnel & other resources to various phases and elements
Confirms product performance by design and conducted test verifications.
Prepared project status reports – collected, analyzed and summarized information and trends; recommended actions as required.
Daelim Engineering & Construction Co LTD, Yeoungdongpo-Gu, South Korea January 2011 – January 2013 Assistant Project Manager
Managed pre-qualification, tender documents and the finalization of EPC and EPCM main contracts and subcontracts for the following projects: Aramco Jazan and Marine Project, 400 MBD Grass Root Refinery and Northern Tank Farm Project, NGHI Son Refinery and Petrochemical Project, Sala Al-Razboot (SARB) Oil Field and Development Project. KEY ACCOMPLISHMENTS:
Managed pre-qualification, tendering documents and finalization of EPC & EPCM Main Contracts and Subcontracts
(proposal until execution/completion stage).
Provided project management oversight for scope of work; controlled cost, schedule and adhered to project quality standards and HSE.
Managed engineering/design, procurements, construction, commissioning and start-up – ensured that all activities were completed on schedule and on budget.
Alan Lagos Perlas Resume, Page 2
PROFESS IONAL EXPERI ENCES
ontinued
Brunei Shell Petroleum, Brunei Darussalam December 2009 – January 2011 Senior Contract & Project Engineer
Managed various BSP LNG’s projects and Annual Turn-Around Plant Shutdown. KEY ACCOMPLISHMENTS:
In-charge for the pre-qualification & qualification of successful bidder, provided contracts and procurement support for bids and assertively negotiated favorable terms and requirements.
Proven leadership in the preparation of project planning procedures, detailed engineering, construction method of work execution, prepared, monitored and controlled variances and administered MOC.
Coordinated commercial audits for ongoing projects, successfully resolved non-conformances issues.
Resolved contract conflicts, commercial matters and claims on arbitration proceedings and finalized disputed resolution with contractor or subcontractor.
Daewoo Engineering & Construction Co LTD, Seoul, South Korea November 2006 – November 2009 Assistant Project Manager
Managed pre-tender and post tender stages – to include pre-commissioning, commissioning and acceptance for the following turnkey projects: Qatar Q-Chem HDPE Saudi Aramco Bulk Plant Project, Brass LNG Tank, Nigeria, KNPC Tank Farm Project, Kuwait. KEY ACCOMPLISHMENTS:
Administered various project contracts and prequalification of Contractor/Subcontractors. Lead in the review of engineering design specifications; determined overall feasibility and proposed the necessary resources required for the project.
Ensured generation of all deliverables by Engineering Disciplines as per Bid requirement (BOQs, Technical Documents, Costing for various equipment and Bulks etc).
Evaluated progress and technical specification requirements for subcontractors. Monitored financial statement, contractual status and accomplishments.
Ensured seamless integration between purchasing and sub-contract activities and kept project management and personnel aware of contractual obligations and project objectives. SAUDI ARAMCO, Saudi Arabia June 2002 – October 2006 Senior Commissioning & Operation Engineer
Successfully executed & completed the fabrication, erection, examination/inspection, acceptance, commissioning, start-up and operations and maintenance of Site 3,6 & 7 Underground Cavern Tanks and Ancillaries. KEY ACCOMPLISHMENTS:
Prepared commissioning and start up, operation and maintenance procedures for various systems and subsystems.
Prepared resources and consumables required for the execution of pre-commissioning, commissioning and start-up for all sub-systems/systems.
Successfully completed N.D.E & other testing and acceptance required to achived mechanical completion.
Prepared documentation and AS-BUILT drawings required for project completion. DOW Chemicals-Juffali (Arabian Chemical Company), Saudi Arabia March 1993 – March 2002 Operations /Process Engineer
Responsible for inspection/testing, acceptance and commissioning, start-up & operation and maintenance for all equipment. KEY ACCOMPLISHMENTS:
Prepared basic piping and Instrumentation Diagrams (P&ID), Utility Balance Diagram for each process units, prepared sizing calculation for specific project process equipment and process & mechanical data sheet information.
Planned and executed all required testing and product/process validation necessary for all equipment.
Developed operations, commissioning and maintenance philosophies, management systems, arrangements, procedures, processes and resources.
Provided operations input into the engineering design and equipment selection for new developments. Alan Lagos Perlas Resume, Page 3
PROFESS IONAL EXPERI ENCES
Continued
San Miguel Corporation, Magnolia-Nestle, Iloilo City, Philippines November 1990 – February 1994 Shift Plant Supervisor
Provide leadership for operations and maintenance of various static & rotating equipment. KEY ACCOMPLISHMENTS:
Monitored and prepared report on asset performance and efficiencies against budgets using KPI’s and scorecards; analyzed and prepared report on variances.
Lead in the implementation of plant preventive maintenance and repairs, ensured that high quality of product is produced with minimum delays by implementing an active preventive maintenance program and rapid problem solving in case of equipment failure.
Implemented continuous operation and improvement programs to meet or exceed ISO 9000 standards, analyzed & reported production losses and implemented Root Cause Analyses (RCA)
Resolved complex equipment operational problems. Implemented corrective actions and eliminated risk of productivity downtime.
Passi Sugar Milling & Refinery, Iloilo City, Philippines August 1988 – August 1990 Boiler Engineer
Ensured the smooth operation for normal steam generation required to drive mills and turbines for sugar production. KEY ACCOMPLISHMENTS:
Ensured Boiler and ancillaries were operated in a safe, efficient and economical manner, and in compliance with the government regulated clean air act.
Monitored performance, conducted period inspection and performed effective maintenance or repairs to mitigate or reduce production down time.
Responsible for recording operating data such as process conditions, instrument readings and test results; responsible for reporting material requirements and production yields. EDUCAT ION & SPECIAL IZED TRAINING
BACHELOR OF SCIENCE
(MECHANICAL ENGINEERING), 1983-1988
CENTRAL PHILIPPINE UNIVERSITY, Philippines
Specialized Training
Instrumentation, West Visayas School of Arts & Technology, Iloilo City, Philippines Industrial Electricity, National Manpower & Youth Council, Iloilo City, Philippines SMC Pneumatics, Magnolia – Nestle Corporation, Iloilo City, Philippines Petro Phil Corporation, Amigo Terrace Hotel, Iloilo City, Philippines Lubrication Engineers, Magnolia Corporation, Iloilo City, Philippines Computer Training, Arabian Petro Chemical Company LTD, Jubail, Kingdom of Saudi Arabia HYSIS Process Modeling, ASPEN HYSYS, Singapore
AutoCAD (2D & 3D), STI College, Iloilo City, Philippines