Post Job Free
Sign in

Project Manager Construction

Location:
Centerville, MA, 02632
Posted:
March 04, 2016

Contact this candidate

Resume:

Dennis Tavares

Ph. 508-***-**** *** Compass Cir. Hyannis, MA. 02601 *********@*******.***

Cell 774-***-****

Over 10 years of industry experience as lead Field Engineer and 20 years as Project Superintendent delivering safe, on time, on budget projects incl., industrial tilt-up, and pre-cast structures, high end retail (ground up stand alone, and build to suit remodels), new plant, and expansions to water and waste water treatment, high rise commercial, entertainment and hospitality industry projects, in a wide variety of climate and logistical conditions.

CORE QUALIFICATIONS

Strong leadership skills

Excellent communications skills

Word, Excel, PPT proficient

Suretrak, MS Project proficient

OSHA 30 Certified

Strong time mgt. & organization skills

Complete understanding of plans, specs, and shop dwgs

.

Professional Skills

Scheduling

Develop and maintain CPM schedule. Update weekly with two week look ahead.

Conduct weekly Sub-Contractor / project coordination meetings

Monitoring, evaluate and rectify as needed, sub-contractor progress vs. schedule.

Documentation

Set up and maintain “Record” set of contract drawings and as-built conditions.

Create and maintain daily record of construction operations and force reports.

Generate and track RFI's and any Change Orders resulting from them.

Quality Control

Inspection of subcontractors work and materials to assure compliance with all contract documents

Shop drawing review and correction as needed.

Sampling, testing and assessment of testing results to project specifications.

Cost control

Prepare cost estimations for field change orders.

Confirmation of Sub-Contractor percent of work complete for monthly draws.

Shop suppliers for the best material unit prices and equipment rental prices.

Identify, document and quantify “change in conditions”.

Safety

Constant evaluation of existing safety conditions taking corrective and preventative action as needed.

Conduct Weekly on site safety meeting with all trades.

Setup and maintain all OSHA required documentation.

OSHA 30 Hour certified. I have extensive experience in developing and implementing safety plans for confined space entry including those situations meeting “permitted access” and non-permit access into excavations as well existing structures.

Work History

April 2005 Peak Performance Inc.

Dec. 2007 Project superintendent

Larkspur Landing Hotels in Pleasanton, Milpitas, CA. & The Lodge at Tiburon

Structural and Architectural renovations to the main Lobbies, dining rooms, kitchen and conference rooms, while maintaining all floors of hotel operations.

March 2003 Suffolk Constructors

March 2005 Area Superintendent

Jury’s Hotel, Downtown Boston 154 Berkely St.

$50 Mil. Conversion of existing eight story concrete and brick structure. Eleven story addition to the existing structure and added three stories to the original 8 story footprint. Extensive structural improvements at every floor to transform this building into a 240 room, four star hotel. (now known as “Lowes Boston”)

June 1998 Devcon Enterprises Inc.

Jan. 2002 Project Superintendent

Saks’ 5th Avenue / Full line High end Retail Store /

/ $400 Per Sq. Ft. / 3 story / lvl. 5 finishes

Saks’ 5th Avenue /one 41k sq. ft. outlet store

Mall of The Great Plains Outlet Mall. Kansas City MO.

One 48k Sq. Ft. outlet in the Forest Fair Mall Cincinnati, OH.

Roberts’ Tire / 100k Sq. Ft. / Tilt Up / Tire Mfg. Facility

Buffalo Crossings – Square city block Retail site development and public improvements, @ Buffalo & Flamingo BLVD, Las Vegas NV.

April 1996 Murray & Stafford Inc.

June 1998 Project Superintendent

Mann Theaters / 14 screen conventional seating movie theater.

Arvada, CO. / 3000 seat / 75000 Sq. Ft. / Project cost 8 Mil.

Mann Theaters / 16 screen stadium seat movie theater

Thornton, CO. / 4000 seat / 85000 Sq. Ft. / Project cost 12 Mil.

Western Distributing Inc. / 40k Sq. Ft. pre-cast wall, steel frame, warehouse addition

June 1993 Etkin Construction Inc.

Dec 1994 Project Superintendent

Lucky Penny Casino and Hotel / Phase One / Central City CO.

K-Mart Regional Dist. Warehouse. 3 Mil. Sq. ft. w/ a $50 mil. Concrete

Package.

Projects prior to 1994 furnished upon request

Professional References

John Hays

Head of Construction Prestige Brands at Swatch Group

Retail Development

Phone: 201-***-****

Email - ****.****@***********.***

My association with John Hays was during his tenure as VP of Construction for Sak’s 5th Avenue during which I was Superintendent for a full line retail store in Palos Verdes CA., and two Off 5th Outlet stores, one in Olathe, KS. and one in Cincinnati, OH.

Clark Benson CCCA, LEED AP

Senior Project Manager / Estimator at Sage Commercial Builders

Phone: 602-***-****

Email - ************@*****.***

Clark and I worked together on the two Sak’s 5th Ave. outlet stores delivering these projects on time, on budget from vanilla box to open store in 90 days.

Dan Wallner

Senior Project Manager at HMC-Construction

Riverside, California

Email - ********@***.***

Mobile # - 909-***-****

Dan and I worked together building the Palos Verdes CA. Sak’s 5th Avenue store and Roberts Tire Mfg. in Mesa AZ. while we were both employed by Devcon.

Warren H. Wagner,

C.O.O. / Owner

Murray & Stafford Inc.

Phone: 303-***-****

Email – ******@*****************.***

I worked for Mr. Wagner as a Project Superintendent building a 14 screen movie theatre for Mann Theaters Inc., a 16 screen stadium seat theater, and a pre-cast warehouse addition.



Contact this candidate