Applicant Information Report
Personal Information
Applicant Name: Antonio N. Celoza
Position Applied: TIG WELDER COMBINATION
Country preferred: Australia
Birth Date:june 13,1975 Birth Place:Binangonan,Rizal
Age: 40 yrs old Height:5 ft,8 inches Weight: 175 lbs.
Gender: Male Civil Status: married Religion: Roman Catholic
NickName;tony Passport #:EB7586421 Date issued:March 13,2013
Educational Information
Education Yr – To School/Address Course
vocational
03-04,1996
Cavite manpower development corp,Cavite;Eng.Iquipment inc.(EEI
TIG/pipe welding
Vocational
03-08,1994
Rizal Cement Corp.Binangonan,Rizal
SMAW/GAS welding course
High School
1988-1992
(R.T.P.I) Rizal technological and Polytechnic Inst.
Secondary graduate
Elementary
1982 -1988
Pilapila Elementary school
Primary graduate
Employment Information
Company: (SPSI)Scott Process System Inc>
Address: OHIO, U.S.A
Position: (Production Associate as Welder
Date: Oct.2012 –Feb.2013
Duties and Responsibilities (Job Description)
I work with this fabrication as a production associate as welder, this fabrication usually fabricates pipes for a nuclear power plant and refineries so all of my weld must be on the right procedure and all butt weld are subjected for 100 % R.T.and the fillets weld are subjected for pentrant test(P.T.)
Ive been Perform all welding positions such (2G,2Gr,5G,5Gr,6G,6Gr) using GTAW,SMAW or GMAW it defends on a procedure.
Im Qualified to weld carbon steel using tig wire ER70S-2 or -6,stainless steel using the wire ER316L,ER308L,with or without purge,it defends on the welding procedure,im qualified also to weld chromes,start with 1,1/4 crome up to 9 chrome.with the heat stress around the pipe again it is always defending on weld procedure.
While im performing my weld,I make sure that every pass of weld that I made is clean so that the job will be done faster,safer,and on the the right time,and one time only.
I make sure after the whole day of work,at the end of my shift,I spare time for cleaning my area so that the next shift welder will work safe.
Company : IPS ( International Plant Services)
Address : Texas USA
Position : Combination welding Specialist
Date : March 2006- Oct. 2012
Duties and Responsibilities
This company used to supply manpower for specialized welder and pipe fitters all over the state of America,wherever those skills are needed.
My first assignment with our company is to work in a turnaround(refinery shutdown)in Lousiana,named Norco Shell refinery.we weld most of main pipes stainless steel with size of 20 inches up 40 inches in diameter schedule 80 I used the wire er316L for the tig wire all pipes are subjected for 100% r.t.our job last for month,our company that we with that job is the TIMEC/Worldwide.
After that project our company sent me on a contractor named REPCON in Oklahoma,this company deals on a turnaround on Alkaline unit means this pipe line is an acid line.so they train us welders and pipe fitters how to deal and prevent any possible accident that will occur by complying the safety procedures.most pipe line are just carbon stee using the wire er70s-6 and stick rod er7018l,our crew help each other and comply with our supervisor what are the priorities.before we start the job,we make sure the hot work permit is been signed in by the authority. Before welding I clean the metal to make sure that there is no oil or dirt or water because this can cause porosity like blow holes and pinholes., after cleaning we can start welding.this project last six moth,but we move to Kansas for same project for another six month,and fter that we move to Caltex in Borger,texas with same project again,my knowledge that ive leaned working with the hazardourdouz area,is to have pesence of mine,focus on what you doing,don’t act that you know everything,don’t hesitate to ask question if you have doubt,stop look and listen.
.
After that project I work in Texas city,Texas,British petroleum refinery for 3 years,as a combination welder,our main contractor is named JACOBS,it is the main contractor,for the first four months I work with them on a shutdown,replacing old lines that is needed to be replaced,such as coker unit,reactor unit,alkylation,steam reforming ect.,most pipes are schedule 40 but in different sizes from inch socket weld up to 40 inches diameter of pipe with the metal of carbon steel using er 70s-6,stick rod er 7018,stainlees steel using er 316L or er308L ive been qualified also for the downhill process using er6010 for for stick rod penetration and hot pass and er 7018 for filling and capping .Every day in the morning before we start working we, and the welding boss have meeting to assign all welder where to work and discuss about safety.
My remaining time working in the states is in SHAW group of company,this company deals building Power Plants. In North Carolina.i worked as a welder,welding 16 inches of pipe up to 60 inches schedule 40,in the process of SMAW and GTAW,root pass and hot pass of tig wire using ER70s-2,filling,and capping using er7018.most of line are water line so they just do visual most of the penetrant test for the Tie-In.
After welding we also do the self inspection to see If there is welding defect and repairing it by welding and grindering to make good quality.
After a day of work I make sure that the welding machine is switched off and also the tools and equipments must be in proper place and report immediately just in case lost or damage tools.
.
Must clean the area after work.
Company : EEI/ARCC Engineering Equipment Inc./Al Rashaid Co.Corp.
Address : Juaymah,K.S.A.
Position : Combination welder
Date : april 1999-june2004
Duties and Responsibilities
In this project,we built 4 by 632 megawatt unit of power plant,SCECO(Saudi Consolidated Electric Corp.)I worked as a,boiler welder,for the first year of my job,working in area of roof tube,terminal tube,water wall,secondary and primary heater of the boiler,most sizes of tubes pipe are 1.1/2 diameter,schedule 60 using tig wire er70s-6,and ive been trained by the Japanese boiler specialist on how to repair and fix busted weld or weld rejection.most area are 10 % radiographic test,so you must be carefull more because when they got you one bad weld,they will keep shooting your weld.
On my second year in that project,ive been qualified for for the heavy wall welding,using the tig root and hot pass with wire of er 80sb3 with purge and filling up to final capping using stick rod 80sb3 are test is a 8inches dia.with the thickness of schedule120,this qualification will qualified me for crome welding on the unlimited thickness. We used weld the Main steam piping,,Down comer line,Primary super heater,Heat and Cold reheat.most pipes have diameter of 24 inches to 40 inches with the thickness from 1.1/4 inches up to 4 inches.i worked in this area for 3 years,welding big pipes and heavy wall.
For my last year in this project I worked as maintainance welder,we work all together as a team to finish very task that we need to accomplish and we always did it on time and safe.we used worked punchlist,or if theres any revisions of the design on inside and out of the boilers and turbines,placing thermocouples,using different kind of weld material on a appropriate metal.
IMaterials/Tools/Equipment Used:
oWelding rod: E6010,, E7018, ER308L,er316L,er80s b2,er80s b3,er90sb9
oArgos gas, Air hose, Chipper,Nozzle, Tip,Body, tig torch, electrode holder
o Angle grinder (small, big), Grinding disc (5’’d, 8’’d), Cutting disc(5’’d, 14’’d),pencil grinder,
oAdjustable wrench, Chipping hammer, Pliers,flash light
oargon tank, Electrical tape, argon gauge.
oPersonal Equipment: Welding mask,fire retardant clothing Long sleeve shirt,fire retardant pants, Safety shoes, Goggles, Gas mask, Welding gloves, Dark glass, Clear glass, Leggings, leather jacket.
Seminar/ Training / Achievements / Certification Information (if available)
Houston area Safety council ( Reciprocal Courses) Safety Training
24HrSAFETY ( Pulmonary Function Test and Training )
JE JACOBS ( 3# Vent Gas Realibility )
GHAZLAN II POWER PLANT Project Completion Certificate
Career Related skills
Profound knowledge of appropriate safety practices in operation and even using of power hand tools.
Can cut steel from 1mm up to 50mm of steel with precision by using oxy-acetylene torch and plasma cutting.
Can perform different welding position: flat, horizontal, vertical, overhead
Groove: 1G, 2G, 3G, 4G, 5G, 6G,2Gr,5Gr,6Gr
Fillet: 1F, 2F, 3F, 4F, 5F, 6F.
Proper knowledge of welding tools, welding symbols, welding codes, blueprint.
Knowledge in SMAW, GMAW, GTAW, MIG.
Profound knowledge of welding Theories and Principles.
Arc: Shielded Metal Arc Welding, Tungsten Inner Gas
Gas: gas metal.
Personal Skills Information
Languages/Dialect:
Speak Write Read
English: Yes Yes Yes
Others:
Contact Details
Mobile: 091******** / 091********
Email Add: *********@*****.***
Address: sitio hulo,pila pila,binangonan,rizal