S.SANKARANARAYANAN,
Manager- Site Services.
GMV Engineering Pvt Ltd. CURRICULUM VITAE
E-mail: actsbr@r.postjobfree.com
Phone: 099********, 994*******.
Career Objective:
To obtain a long term career in an organization, where innovation, engineering excellence is the way of life and where my full potential is explored for the development of new plant construction projects. Company profiles & Designations:
Sl.
No
Organisation Company Profile Designation
Duration of
work
01
M/s. GMV
Engineering Pvt Ltd,
Chennai.
Consultant and turnkey basis
contractor for cement industry with
specialized for material handling
equipment supply and service.
Manager Site
Service
10/Since 05/2013
02
M/s. Dhandapani
Cements Pvt Ltd,
Trichy, Tamilnadu.
Manufacturing of high quality 53,43
grade OPC and PPC cements (Expansion
Project for 1200TPD total circuits)
Dy.Manager,
Mechanical
Projects
02/30/(2 05/04/Years) To 2011 2013
03
M/s. LNV
Technology Pvt
Ltd,Chennai,
Tamilnadu.
Cement plant Consultant and
manufactures of Ball mill, VRM, Kiln,
Seperator, Cooler, ESP, RABH, BF, BC,BE
& all kinds of cement industry
equipments.
Service
Engineer
18/30/(3 02/04/Years) To 2008 2011
04
M/s. Issojet Burner
Pvt Ltd, Hosur,
Tamilnadu.
Consultant and manufactures of
Refractory Kilns and Material Handling
Equipments
Service
Engineer
25/06/(1 06/02/year) To 2006 2008
05
M/s. Issojet Burner
Pvt Ltd, Hosur,
Tamilnadu.
Consultant and manufactures of
Refractory Kilns and Material Handling
Equipments
Engineer
Trainee
10/24/(1 07/06/year) To 2005 2006
Educational Qualification:
B.E in Mechanical Engineering from RVS engineering college, Dindigul, Tamilnadu and Anna University Roles in the & year Responsibilities: 2005.
Project schedule preparation and man power schedule preparation for civil & mechanical construction using documents like general plant layout, static & rotating equipment drawings
and Maintaining manuals, & required follow routing ups the of engineering heavy or light drawings ducting works. documents up to final revision and important documents of protocols & Minutes of meetings with suppliers or vendors or
consultant. Maintaining & follow ups the contractor works follow up and review, Team organizing for
Project Inspection Cement follow plant for ups all equipments supplier as per project equipments erection schedule. and as commissioning per given QAP. as per customer calls or order with
turnkey Working basis as an project Dy.Manager at site as (Mechanical a Manager-Site project) service with in M/responsibility s.GMV Engineering like site Pvt in Ltd. charge for total expansion project of 1200 TPD {Raw Mill retro fittings and RABH erection, Pyro circuit
(PreHeater, Rotary Kiln, Grate bar cooler, ESP with chimney), Raw Meal Silo circuit, Coal Mill circuit, clinker transport circuit} for civil construction & Mechanical erection and co
ordination Have been at Worked site. as Site in charge (Mechanical) with responsibility like Work schedule preparation, man power handling, fabrication, erection, mobilizing, inspection and leading the projects to the total cement plant circuits till commissioning like Raw mill, Pyro, Coal mill, Cement mill (VRM with Classifiers, Ball Mill With classifier, Bag Filters, material handling equipments, Cyclone, All Duct and fabrication jobs erection) circuits in M/s.LNVT &
M/Have s.Issojet been Worked Burners as Pvt Design Ltd. engineer in M/s.Issojet Burner Pvt Ltd with responsibility like surveying, preparing and finalizing the general layouts and plan drawings with respect to the customer commands at site.
Projects & Site executions:
Site Service conducted Plant name Activities
Lafarge Republic Ltd,Batangas Plant,
Philippines Duration of Project: under M/15/s.02/GMV 2014 to 26/12/2014
Cement handling circuit erection for Pack
house. transport Civil equipment ducting pedestal (work Cement existing erection ) work Silo system for including to new Packing demolishing equipments, structural’s plant cement work, New and Lafarge Republic Ltd, Therasa Plant, Philippines
under Duration M/of s.GMV Project: 16/01/2014 to 14/2/2014
Fly (conveyors, gates and contractor. Fly ash co ash with ordination handling hopper proper Drag to chain circuit with structural Finish conveyors, Client mill erection and & feeding=sub stair RAL, case) Screw Slide Lafarge Republic Ltd, Bulacan Plant, Philippines
under Duration M/of s.GMV Project: 12/10/2013 to 16/12/2013
EP (feed=Pipe system, structural case) contractor. EP dust hopper lines Screw and Bag conveying co from plat to Conveyor,filter, ordination Finish forms blower Air circuit mill and slide FK to with Bucket supports pump, Bin, with erection Client Bin Blowers Roots elevator weighing and & sub blower, stair and Lafarge Republic Ltd, Norzagray Plant,
Philippines Duration of Project: under M/09/s.09/GMV 2013 to 11/10/2013
Cement (Silo=filters elevators, valves,sub Finish contractor. Air with RAL) mill slides conveying Pneumatic fan, Cyclone and with Belt co ordination blowers,circuit conveyors, discharge slide gates, erection Dedusting with to Belt Flap Cement Client bucket bag & Dhandapani Duration of Project: Cement 2/Pvt 04/Ltd,2011 Trichy to 30/4/2013 Madras Cements Ltd,R.R.nagar,Tamilnadu under New Mechanical Kiln blowers, conveyor,circuit, Belt ball classifier process co consultant contractors. ordination mill conveyors, with Expansion Clinker & internal Drag with DA ESP dedusting & construction duct Civil with with chain CA silo Raw 1200 changes, fan,connection, and M/Fan, with conveyor, mill fan RABH s.Mechanical TPD Sabash Coal weighing with for retro new with project PH mill bag Cooler Deep fit raw engineering with fan, closed works filters.systems, mill pan (PH all with Civil ) like Fan, and & M/Duration s.LNVT of Project: 2 Month.
Raw Fan erection. Mill VRPM circuit Classifier erection and CA Athi River Mining Ltd, Nirobi, Kenya under
M/Duration s.LNVT of Project: 2 Month.
Cement job. Mill Classifier and ball mill erection Nagarjuna Cement Ltd, Mattapally site, Andhra
Pradesh Duration under of project: M/s.1 LNVT year 2 months. Jaypee cements Ltd, Chunar site work, Uttar Site separator) Raw Cement in mill charge mill (VRM circuit (Ball of with Line mill erection, separator) 2 with Coal O–Sepa mill circuit (VRM Separator) with Pradesh Duration under of Project: M/s.3 LNVT months. Satna Cement works, Satna, Madhya Pradesh Classifier Cement mill erection No’s 3, and 4, 5 project works execution at site. for under Duration M/of s.LNVT Project: 25 days.
Mangalam Cement Ltd, Kota, Rajasthan under Erection Raw mill and circuit. servicing of VRPM classifier for M/s.LNVT
Duration of Project: 3 months.
Erection circuit Erection and its for circuit. and and clinker servicing servicing grinding. of of VRPM Coal mill classifier classifier Nagarjuna Cement, Kondapally site, Andhra
Pradesh Duration under of Project: M/s.4 LNVT months.
Site with activities. in O-charge Sepa seperator) for Line 2 erection Cement mill and (execution Ball mill JK lakshmi cement, Sirohi, Rajasthan.
JK lakshmi cement, Kalol,Gujarat under
M/s.LNVT
Duration of Project: 8 months.
Zuari Cements ltd,sithapuram,Andra pradesh Erection with grinding. Erection circuit Erection mill with ball at and and and mill Sirohi LV classifier execution execution servicing and site. classifier circuit the of of Cement Raw cement for at clinker Mill Kalol mill grinding Precrusher Site circuit ball under Duration M/of s.LNVT Project: 2 months.
Co fittings ordination and classifier of Cement erection. mill circuit retro Kesoram Cement ltd,Basanth Nagar,
Ramagundam,Duration of Project: Andra 3 months. pradesh under M/s.LNVT Mecawber Beekay Pvt Ltd, Delhi for M/s Mejia Co and Execution VRPM ordination classifier with and Classifier erection, of erection Coal works. mill of circuit Cement retro mill fittings circuit Thermal Power Station, Durgapur, West Bengal.
Under Duration M/of s.Project: LNVT 2 months.
Erection of Fly ash Classifier works
Vishnu Chemicals Ltd, Vizag, Andhra Pradesh
under Duration M/of s.LNVT Project: 20 days.
Execution activities. of Classifier and Ball mill erection Murali Industries Ltd, Narada site,Durgapur,
Maharastra Duration of Project: under M/3 months. s.LNVT
Cement ordination mill and mill KVT for grinding Separator LV Classifier, circuit erection. Roller erection press, and Ball co- Tata Duration Refractory of Project: Ltd. 5 Orissa months. under M/s.Issojet Orissa Duration Cement of Project: Ltd, 3 Orissa months. under M/s.Issojet Lay commissioning kiln. out preparation, of tunnel erection Kiln, and pre cast shuttle SAK Duration abresives of Project: Ltd, 2 Chennai. months. Under M/s.Issojet Lay commissioning Kiln. out preparation, of tunnel erection Kiln and (5 & 6), Shaft
Carbell ordination Kiln, for recuparator Line 1 & 2. erection and Co- PERSONAL PROFILE:
Name : S.Sankaranarayanan
Date of Birth : 01-07-1984.
Marital Status : Married.
Children : 5 years old boy.
Language known : Tamil, Hindi, Telugu & English.
Nationality : Indian.
Passport Number : Z3108572 & Expired date 26/05/2025. Permanent Address: S.Sankaranarayanan, S/o.V.Sangaiah, 5/11,Nambi lane,Perumal koil St, Bodinayakanur, Theni dist-625513, Declaration: I hereby declare Tamilnadu.that the India. information furnished above is true to the best of my knowledge. Date:
Place: Chennai. (S.Sankaranarayanan)