Post Job Free
Sign in

Senior Manufacturing Engineer

Location:
Dallas, TX
Posted:
February 29, 2016

Contact this candidate

Resume:

Roman S. Gibson

*************@*****.*** 817-***-****

OBJECTIVE

To be in a position that promotes innovation while implementing and controlling various operations. Also involving vendor development by means of effective communication while being profitable to the organization I belong to.

SUMMARY OF QUALIFICATIONS

Experienced in researching and development of technical studies/writing, investigations, designs, data integration and cost estimates and applications.

Able to provide technical leadership while implementing changes within multidisciplinary team environments internally and externally.

Hard worker with strong track record of completing projects on time and within budget.

TECHNICAL SKILLS

Auto Cad 2005/2011, Solid Works Microsoft Visio, SharePoint, Lean Methodologies (product lifecycle management), SAP, MS-DOS, Microsoft: Word, Excel, Power Point

PROFESSIONAL EXPERIENCE

Creation Technologies – Contractor – Plano, Tx Jan 2015 – Current

Production Engineering Technician

Created and Maintained process flows and assembly work instructions

Improved efficiency (Performance to Standard, Turnaround time, Changeover time)

Worked on continuous improvement of the process on the production floor to improve quality and cycle time by focusing on:

Defect data analysis

Assembly tools and fixture

Automation of processes and equipment

Elimination of redundant and non-value added operations

Optimizing the product flow

Proactively pursue better methods and/or new technologies in order to assist the customer in improving the product design and enabling Creation Technologies to produce better product, cost effectively.

KONE – Contractor – Allen, Tx July 2015 – December 2015

Application Engineer

Process custom components documentation

Creating BOMS in SAP to list custom components for electrification and signalization

Created listings for signalization that comes from outside suppliers (Vendor Fixture Listings – VFL)

Check other engineer’s work after they have listed the job

Encouraged/Coached 5s for the engineering teams office

Provided scheduling status for Engineering and Project Management teams(MS excel macros)

Assisted in training New Electrical Engineers

Created Work order/Engineering Task Documentation

Attended training courses to see the latest Elevator technology from KONE and Competitors

Baker Hughes (Quest – Global) Houston, Texas July 2011 – January 2015

Sr. Manufacturing/Project Engineer

Provide analysis, oversight and coordination of major and minor procurement and production activities.

Creating quality workflow diagrams; drove and optimized process Improvement while reducing cycle time and identifying gaps in performance to reduce backlogs, reduce bottlenecks and deviations. Product Data Management/Product Lifecycle Managment

Worked with vendors on quotes and delivery (Grainger, Hisco & Creform)

Trained Assemblers and Technicians

Created, managed and monitored design and documentation for drilling tools.

Plant Design/Layout for production efficiency using Lean tools

Trained Assemblers and Technicians on PCBA (CCA)

Implemented routers and barcode systems for a steady flow in SAP by working with the Lean Team, Procurement and Engineering.

Established guidelines for the quality control department inspection process with Managers and the Director. (CAD inspection drawings training procedures)

Created BOM’s and ECO’s workmanship standards along with manuals for manufacturing events to improve process capability which reduced overall costs and increase capacity. All special projects were completed using Lean Principles (Lean, Value Stream Mapping, 5s,Time Studies, Just-In-Time, Work Flow Diagrams.

Implemented routers and barcode systems for a steady flow in SAP by working with the Lean Team, Procurement and Engineering.

Simtek Inc. Euless, Texas June 2009 – July 2011

Electrical Design Engineer

Prepared miscellaneous Pilots Cabin (Defense/Commercial) instrumentation for the Pre assembly/QC/ department; All Documentation and Assembly

Executed continuous improvement throughout the whole facility (80 Employees)

Guided the implementation of the clean room for PCB’S

Created preliminary documentation (PCB, Calibration Tables, Pin outs, and "on special projects" Technical Writing) all documents were sent off to customer for preliminary approval then released to production for assembly and testing. Throughout the formation of each project all work was documented on a work schedule to assured all goals were met in a timely manner.

Tested mechanical parts of instrument to make certain all switches, knobs, and other manual functions were design correctly using digital multi-meter. (data acquisition systems)

Calculated tolerances, to create Calibration Tables Microsoft Excel was used which also listed connector types, and special notifications such as cable lengths, and tolerance for the Technicians.

EDUCATION

MBA – Project Management – Keller University (online) Current

ITT Technical Institution- Arlington, Texas June 2007- April 2011

Bachelors Degree, Electronics and Communications Engineering Technology

Associates in Applied Science Degree, Computer and Electronics Engineering Technology



Contact this candidate