Roman S. Gibson
*************@*****.*** 817-***-****
OBJECTIVE
To be in a position that promotes innovation while implementing and controlling various operations. Also involving vendor development by means of effective communication while being profitable to the organization I belong to.
SUMMARY OF QUALIFICATIONS
Experienced in researching and development of technical studies/writing, investigations, designs, data integration and cost estimates and applications.
Able to provide technical leadership while implementing changes within multidisciplinary team environments internally and externally.
Hard worker with strong track record of completing projects on time and within budget.
TECHNICAL SKILLS
Auto Cad 2005/2011, Solid Works Microsoft Visio, SharePoint, Lean Methodologies (product lifecycle management), SAP, MS-DOS, Microsoft: Word, Excel, Power Point
PROFESSIONAL EXPERIENCE
Creation Technologies – Contractor – Plano, Tx Jan 2015 – Current
Production Engineering Technician
Created and Maintained process flows and assembly work instructions
Improved efficiency (Performance to Standard, Turnaround time, Changeover time)
Worked on continuous improvement of the process on the production floor to improve quality and cycle time by focusing on:
Defect data analysis
Assembly tools and fixture
Automation of processes and equipment
Elimination of redundant and non-value added operations
Optimizing the product flow
Proactively pursue better methods and/or new technologies in order to assist the customer in improving the product design and enabling Creation Technologies to produce better product, cost effectively.
KONE – Contractor – Allen, Tx July 2015 – December 2015
Application Engineer
Process custom components documentation
Creating BOMS in SAP to list custom components for electrification and signalization
Created listings for signalization that comes from outside suppliers (Vendor Fixture Listings – VFL)
Check other engineer’s work after they have listed the job
Encouraged/Coached 5s for the engineering teams office
Provided scheduling status for Engineering and Project Management teams(MS excel macros)
Assisted in training New Electrical Engineers
Created Work order/Engineering Task Documentation
Attended training courses to see the latest Elevator technology from KONE and Competitors
Baker Hughes (Quest – Global) Houston, Texas July 2011 – January 2015
Sr. Manufacturing/Project Engineer
Provide analysis, oversight and coordination of major and minor procurement and production activities.
Creating quality workflow diagrams; drove and optimized process Improvement while reducing cycle time and identifying gaps in performance to reduce backlogs, reduce bottlenecks and deviations. Product Data Management/Product Lifecycle Managment
Worked with vendors on quotes and delivery (Grainger, Hisco & Creform)
Trained Assemblers and Technicians
Created, managed and monitored design and documentation for drilling tools.
Plant Design/Layout for production efficiency using Lean tools
Trained Assemblers and Technicians on PCBA (CCA)
Implemented routers and barcode systems for a steady flow in SAP by working with the Lean Team, Procurement and Engineering.
Established guidelines for the quality control department inspection process with Managers and the Director. (CAD inspection drawings training procedures)
Created BOM’s and ECO’s workmanship standards along with manuals for manufacturing events to improve process capability which reduced overall costs and increase capacity. All special projects were completed using Lean Principles (Lean, Value Stream Mapping, 5s,Time Studies, Just-In-Time, Work Flow Diagrams.
Implemented routers and barcode systems for a steady flow in SAP by working with the Lean Team, Procurement and Engineering.
Simtek Inc. Euless, Texas June 2009 – July 2011
Electrical Design Engineer
Prepared miscellaneous Pilots Cabin (Defense/Commercial) instrumentation for the Pre assembly/QC/ department; All Documentation and Assembly
Executed continuous improvement throughout the whole facility (80 Employees)
Guided the implementation of the clean room for PCB’S
Created preliminary documentation (PCB, Calibration Tables, Pin outs, and "on special projects" Technical Writing) all documents were sent off to customer for preliminary approval then released to production for assembly and testing. Throughout the formation of each project all work was documented on a work schedule to assured all goals were met in a timely manner.
Tested mechanical parts of instrument to make certain all switches, knobs, and other manual functions were design correctly using digital multi-meter. (data acquisition systems)
Calculated tolerances, to create Calibration Tables Microsoft Excel was used which also listed connector types, and special notifications such as cable lengths, and tolerance for the Technicians.
EDUCATION
MBA – Project Management – Keller University (online) Current
ITT Technical Institution- Arlington, Texas June 2007- April 2011
Bachelors Degree, Electronics and Communications Engineering Technology
Associates in Applied Science Degree, Computer and Electronics Engineering Technology