M. KUMAR
No.*/*. T.K. Pani, *nd Street,
Periyar Nagar,
Nesappakkam,
Chennai – 600 078.
Email: - actp9h@r.postjobfree.com
Mobile: 995-***-****
Seeking an opportunity to create value in my professional experience, education and abilities that would blend with my skills and be an advantage to the growth of the organization and myself
Total Years of Experience: 13 years 8months
Structural steel Experience(in prosteel,advance steel&Tekla 14.0 to 19.1) – 8.7years
(in Autocad 2004 to 2008) – 2 years 11 months
Other experience(in production) – 2 years 2months
Software Exposure:
Tekla structure (version14.0, 15.0, 16.0, 17.0, 18.0,19.1),
Autocad 2004 to 2011,
Prosteel v8i, Advance steel
Ms-office.
Professional Experience:
I have been working more than 11.6years experience in steel structure design field as modeler, model coordinator (Tekla, prosteel & advance steel) & developer (using autocad )
My strength are
1. Modeling, model co-ordination, developing of all type of steel structure like industrial building, oil and gas field, pipe racks structure, power generation field, Conveyor & commercial building. I am worked in detailing standards like Indian std, Uk std, Din std & Us std.
2.Standardization of modeling – create standard connection using macro type and custom component type in which using parameter setting for typically applied in model for various size of profile. And also create rule set wizard in the auto connection settings & auto default setting for the standard type using in whole project.
3.Standardization of detailing – create each and every category type of assembly drawing, single part drawing and general arrangement drawing settings & multi drawing settings as per client drafting detailing standard and procedure. And also create the detail drawing rule set wizard for creation of assembly and single part drawing
4. Create Template(tpl) setting and report setting as per client standard and format.
Responsibilities:
Exposure of project information, coordination with customer, design document study, RFI generation and RFI response/design revision implementation. 3D Modeling – create gird views, phase number settings, stick model creation, macro /custom component create & applying, Misc items modeling, clash checking & clearing. Numbering the final model and reviewed by report, 2d generation editing, NC files & DXF creation, dispatching the complete set of final drawings required for fabrication, erection site sent through the mail/FTP server.
Areas of Exposure:
Project information
Explore all project information including the estimate, contract document & drawings.
Understanding our scope of work, project technical specification, standards and numbering setup procedure.
Design study & RFI Generation
Study/reviewing the design drawing prior to modeling & 2D generation.
Co-ordinate with the other related structural design/Architectural/Mechanical drawing.
Generation of RFI to clarify the conflicting /missing information in the design drawing & specification.
RFI responses are properly implemented in the model.
Ensuring the design revision, that affected member/connections updated in the model due to revision/RFI’s.
3D Modeling-Tekla structures
Grid views, Phase number, Stick Model
Creating grid view plan, Elevations & Label name as per design input coordinate value.
Assigning Phase number sequence wise to selection of various type of structure views and ease of modeling
Creating the stick model for primary steel structure like a Built-up sections, all type of columns, beams,
braces, double angle, star angle, monorail & pipe racks.
Macro & custom component connections
Various type of macro connection like a clip angle, end plate, shear plate, bolted gusset, Base plate and other
etc., to applied in various profile as per design inputs.
Creating custom component connection as per design inputs, if macro connection could not applied
impossible conditions.
Modeling secondary steel
Creating the stick model and macro type/custom component connection like a staircase, ladder, handrail,
purlin, girt, girt bracket, sag rod as per design inputs.
Creating the grating and chequered plate & other misc job as per design.
Numbering and clash check
While applying each connection for every profile type to check the clashing of parts and clear the errors at
the same time.
All assembly & parts – Name, mark, start number, material, finish code and others to applied while creating
the stick model and connection.
To ensure all the parts to be follow as per client standard numbering procedure & reviewed by report.
All parts are numbered after the finished the model.
2D Generation & Editing
Creation of general arrangement drawing like primary & secondary steel, Anchor bolt plan, Embed plan.
Creation of all Assembly drawing, single part drawing,.
Creating Multi drawing(can collect several single part or assembly on one sheet)
Editing all type of primary & secondary steel drawing as per client drafting standard.
Template setting & Reports Generation
Customization of template setting &editing as per client drafting standard/format.
Creation of NC files(DSTV,DXF Format),Eje file, kiss format file.
Assembly list, assembly parts list, bolt summary list, bolt point to point list.
Generation of bill of material/material take off through our company program tool(if client required)
Final drawing
Export the all final set of GA & shop drawing finished drawing in Pdf format/Dwg format.
Preparing transmittal for final drawing through our company program tool.
All drawing & other data sent through to FTP server system
Projects Handled
1. Organization : DANGOTE REFINING COMPANY, NIGERIA(on going job)
Contractor : ENGINEERS INDIA LIMITED.
Project 1 : DANGOTE REFINING AND PETROCHEMICALS PROJECT(1,25,000MTons)
Area : 121-MHC, 111-RFCC, 101-CDU, 151-MS BLOCK, 141-C4SHP.
2. Organization : PETROFAC DEVELOPMENT OMAN.
Project 1 : RABAB HARWELL INTERGRATED PROJECT(20000 MTons)
Area : PIPERACK 1B-01 TO 1B-06, PIPERACK1C-02, PIPERACK 4B-01 TO 4B-03.
3.Organization : DANGOTE FERTILIZER (P) LTD. NIGERIA
Contractor : SAIPEM INDIA(P) LTD
Project 1 : 32-BH-01-UREA BULK STORAGE(2500 MTons)
Project 2 : DANGOTE FERTILIZER PIPERACK(11PR200-01 TO 02, 11PR201-01 TO 03,
21PR200-04 TO 05 & MAIN STRUCTURE(10STR102,20STR102,1STR201,
21STR201,11STR215,21STR215,19STR601, 29STR601GRANULATION STRUCTURE
(20000 MTons)
4. Organization : CARMEUSE
Contractor : ENSPECT. INC.,
Project 2 : BUFFINGTON OPERATIONS LIME TERMINAL.(8000 MTons)
5.Organization : RELIANCE INDUSTRIES (P) LTD
Contractor : FOOSTER WEEHLER INDIA (P) LTD
Project : RELIANCE JAMNAGAAR-3 PROGRAM PARAXYLANE TRAIN-4 (REFINARY
DIVISION)-GUJARATH(16000MTons)
Area : INTERCONNECTING PIPERACK(AYZ02-00-011 & AYZ02-00-012),
CRYSTALIZATION STRUCTURE (UNIT -TRAIN 1 TO 3-AYZ261-101003/2010003/301003),
COMMON FACILITIES STRUCTURE(AYZ202-000020), COMMON FACILITIES
SPURRACK(AYZ202-000016 & AYZ202-000015), SUBSTATION-
PLATFORMS&PIPESUPPORTS(AYZ202-80&AYZ202-70)
6.Contractor : CIVES STEEL COMPANY
Project : COBO CENTER ARENA
7.Contractor : ROBERTS AND SCHAEFER.
Project : POWER SPRINGER VILLE GENERATING STATION UNIT-4& TURK PLANT
8.Contractor : DEARBORN MID-WEST CONVEYOR CO.
Project : OAK HILL LIGNITE HANDLING SYSTEM-CAGING FOR BUCKET ELEVATOR
Contractor : FFE MINERALS INDIA (P) Ltd.
Project : COAL AND ORE HANDLING SYSTEM CONVEYOR GALLERY J12C1
Area : COKE CALCINATIONS UNIT BELT CONVEYOR CO-30-107.
9.Organization : QATAR PETROLEUM – GAS SWEETENING FACILITIES.
Contractor : PETROFAC INDIA (P) LTD.
Project : CETRAL PROCESSING FACILITIES
Area : MISC PIPE SUPPORT IN TR-1 AREA, CLOSED DRAIN VESSEL(CP000-55-T-001)
LP FLARE KO DRUM PLATFORM(CP000-42-V-001), SUPPORT BETWEEN
PIPERACK AND 2ND STAGE SEPARATOR TR2, SUPPORT BETWEEN
PIPERACK AND INTERSTAGE HEAT EXCHANGER TR2, PSV PLATFORM
STRUCTURE FG SYSTEM
10.Organization : INDAIN OIL CORPORATION LTD.
Contractor : VALDEL ENGINEERING & CONSTRUCTION(L&T)
Project : PARADIP REFINERY-LSTK PACKAGE-C, PARADIP, ORISSA, INDIA.
Area :PIPERACK &GATES (SOUTH PIPERACK RSGE AREA UNIT 211/212)
11.Organization : BAHART OMAN REFINERIES LTD.
Contractor :TATA CONSULTANCY ENGINEERS LTD.
Project :3x33MW BINA REFINERY CAPTURE POER PLANT,UNIT-1,2 &3 SMHS
Area : MILL FEED SILO STRUCTURE
12.Organization : CCB-CIMPORE CIMENTOS DO BRAZIL LTDA
Contractor : FLSMIDTH MINERALS INDIA (P) LTD
Project 1 : 1500 MTPD – FABRICA DE CEZARINA – LINHA 3 – CEZARINA GO, BRASIL
Project 2 : 3800 MTPD – FABRICA DE CIMENTOS DE – CAXITA, BRASIL
Area : 471 CLINKER TRANSPORT TO STORAGE, 321 RAW MILL
13.Organization : MAHARASHTRA STATE POWER GENERATION CO LTD.
Contractor : L&T – MHI BOILERS (P) LTD.
Project 1 : JAYPEE NIGRIE SUPER THERMAL POWER PROJECT(2X660MW)(8520 tons)
Project 2 : RAJPURA THERMAL POWER PROJECT(2X700MW)
14.Organization : NTPC LIMITED
Contractor : DOOSAN CHENNAI WORKS (P) LTD.
Project : KUDGI SUPER THERMAL POWER STAGE-1(3X800MW)
15.Organization : WHEELABRTOR AIR POLLUTION CONTROL INC
Contractor : BECHTEL /LG & E TRIMBLR COUNTY UNIT.
Area : DRY ESP (INLET & OUTLET NOZZLE, INTERANL TRUSSES, PENTHOUSE
ROOF, GAS TIGHT ROOF)
16.Organization : IBER AFRICA
Contractor : HEAVY ENGINEERING Ltd.,- NIGERIA
Project : NAIROBI SOUTH POWER PLANT
17.Contractor : DURR INDIA (P) LTD.
Project1 : TATA X3 SINGOOR,(2.8MX2.8M CHIMNEY & PLATFORM)
Project2 : MANINDRA CHAKAN PAASENGERCAR,(EXHAUST CHIMNEY 14.0MX4.0M)
18.Contractor : QUALITY FABRICATION, LLC.
Project1 : MORGANTOWN BLENDING FACILITIES
Area : 48” TRIPPER CONVEYOR-01
19.Contractor : RAUGHLEY PIPE & TUBE INC.
Project : SPRINGERVILLE GENERATING STATION UNIT-4
Area : 54” CONVEYOR C-50R
BLACKSTONE GROUP TECHNOLOGIES (P) Ltd., Ambattur Industrial Estate, Chennai.
Designation :Senior Cad Engineer (from June 2007 to till date)
As a X-STEEL(TEKLA) Modeler
Domestic Assignments / Deputation : Petrofac India Projects Ltd, Chennai
Project : Gas sweetening facilities at mesaieed & dukhan(AGPR)
Period : Oct 2012- Nov 2012
Nature of Work :
Modeling all type steel structural details for industrial, oil and gas field, pipe racks structure, power generation field (working std-Indian std, UK std, DIN std &US std) in tekla
1.Modeling the primary steel structural’s like column & beams, built up sections, floor beams,
tie beams, roof beams, vertical, horizontal & knee bracings, monorails, various equipment
supporting steel frame, strut member, cable tray support for various system and modules.
2.Modeling the secondary steel structural’s like staircase, handrail, gratings, chequered plate,
ladder, purlin, sag rod, girt, girt bracket & other misc jobs etc.
3.Modeling the all pipe racks structures & oil and gas refinery structure.
4. Coordinate with other discipline(equipment. Piping. Ducting. Chute ) during modeling &
model checking.
5. Coordinate with anchor bolt foundation plan for main steel structure & preparation anchor bolt
template drawing(if client need)
6. Coordinate with Interface structure and expansion joint connection provided.
7. Raise the necessary RFI’s to client & Generate the advance bill of material(ABM) list report
KARUN CONSULTANCY, Teynampet, Chennai
Designation :Cad draughtsman detailer (from June 2004 to May 2007)
As a AUTOCAD draughtsman /PROSTEEL Modeler
Domestic Assignments / Deputation : FFE MINERALS (P) LTD, Chennai
Project 1 : COAL AND ORE HANDLING STSTEM CONVEYOR GALLERY J12C
Project 2 : COAK CALCINATIONS UNIT BELT CONVEYOR CO-30-107.
Period : Apr 2006- May 2007.
Nature Of work:
1.Preparing primary steel structural building drawings like column, built up section column &beams,
floor beams, tie beams, roof beams, vertical, horizontal & knee bracings, monorail & stair tower.
2.Preparing the secondary steel structural building drawings like staircase, stair handrail, floor
handrail, gratings, chequered plate, ladder, purlin, sag rod, girt bracket, girt & door frames.
3. Modeling/ Preparing(development) of plate work for ducts, chute(head, tail, two way & feed),
diverter gate and Chimney using the prosteel/autocad.
4. Modeling / Preparing(development) the conveyor supporting frames (all pulley), stringer, gravity
take-up frame & guards, walkway channel & handrail, conveyor truss, truss bent, gantry walkway
channel support frames, gantry staircase shoes the prosteel/autocad.
5. Raise the necessary RFI’s to client & Generate the advance bill of material(ABM) list report
6.Preparing the Erection plan, Anchor bolt plan, assembly drawing as per client drafting standard.
7.Preparing the general arrangement of steel structural as per client drafting standard and Electrical
switch supports detail drawings of conveyor.
HEAVY VECHICLES FACTORY Avadi, Chennai-54.
As a Trainee apprenticeship (from Apr 2003 to Apr 2004)
1. Preparing the detail drawing for receiver gauge, pitch snap gauge, ring gauge, grinding
mandrel, modeler plug gauge, jigs & fixture.
2. Preparing the bill of material for the above drawings.
3. Preparing the cutting plan to minimize material wastage.
4. Learning the CNC machine operating and programme writing.
PIPE SUPPORTS INDIA (P), Ltd., Perungudi, Chennai-96.
As a Trainee supervisor (from Jan 2002 to Mar 2003)
1.Supervision and inspection of various type of support component.
2.Preparing of time schedule and monitoring of progress.
3.Trained in CNC machine operating in various department of shop.
Course
School/College
Board/University
Year of Passing
% of Marks
DME
Saint Michale’s Polytechnic Avadi, Chennai-62.
Directorate of Technical Education
2001
83.6%
Languages Known:
English & Tamil
Fathers Name : G. Mani
Date of Birth : 27th August 1981
Gender : Male
Marital Status : Married