CURRICULUM VITAE

First name: Marian

Last name: Ilie

Date birth: 17 December 1967

Place of bitrh: Tinosu village, Prahova county, Romania country

Address:Tinosu village, No 407, Prahova county, Romania country

Phone:004**********,

Email address:actlx1@r.postjobfree.com;actlx1@r.postjobfree.com

Skype address: marian.ilie67

Military service: Don

Marital status: Married, two children

Studies: -1998-2001 : ''Technical College Lazar Edeleanu'' -Ploiesti - Mechanical specialization

-1982-1987: ''1 Mai Industrial High school''- Mechanical specialization

Job experience:-February 2015 -December 2015- piping foreman at Cofely GDF Suez Company from Holland-Shell Rafinery . I mention that Ihave VCA certificate, fitter flange certificate,rigger certificate

-May 2014- February 2015- Structure Supervisor at Refinery PDVSA Venezuela.

-March 2014-May 2014-piping supervisor at Kraftanlagen Romania(shut down and revamp project-Atmospheryc and Vacuum Distilation plant-O.M.V Petrobrazi Romania)

-October 2013-February 2014-piping supervisor at C.O.S.M.I Srl Italy

-October 2012-October 2013 piping supervisor at Fata Hunter of Oman -OARC (Oman Alluminium Rolling Company)Project

During this project I had like main tasks:

-to communicate with customers and construction Company;

-to check the suppliers materials, size, qality and technical documentation delivery schedule if is in accordance with the construction schedule and contractual commitmens;

-to read technical drawings and give instructions to piping foremans and pipefitters;

-to check if the work performed by the subcontractor is in accordance with design documents;

-to check the equipment and manpower employed;

-to planning the montly, weekly and daily activities in accordance with work schedule progress;

-to check the pieces position in the plant according with the location on the drawings indications;

-to supervising the hydrotest and commissioning

I mention that during this period I worked with tubes diameters between 10mm-38mm and pipes diameters between 3/8inch-20inch and wall tickness between 2mm-25mm and materials as carbon steel, stainless steel, cooper, PVC, Plastic. For this project we used butt joints, socket joints and threaded joints

During this project had commanded 100 employees.

- 1 November 2011- 1 September 2012 - Piping supervisor at Kraftanlagen Romania,OMV PETROM Refinery-DAV2 (atmospheric and vacuum distilation) Extension and Revamp Project from Romania

-to communicate with customers and construction Company;

-to check the suppliers materials, size, qality and technical documentation delivery schedule if is in accordance with the construction schedule and contractual commitmens;

-to read technical drawings and give instructions to piping foremans and pipefitters;

-to check if the work performed by the subcontractor is in accordance with design documents;

-to check the equipment and manpower employed;

-to planning the montly, weekly and daily activities in accordance with work schedule progress;

-to check the pieces position in the plant according with the location on the drawings indications;

-to check the joints before welding, I mention that the all wellds was testing X-Ray;

-to reported to the Construction Manager the progress of the Subcontractor activities for his own discipline, ensuring that Plant Construction works are performed according to the erection schedules and project documents withnin the assigned cost budget;

During this project I worked with size pipes between 2 inch-24 inch and wall tickness between 2mm-34mm and materials as: carbon steel; stainless steel; duplex; superduplex and other alloys

During this project had commanded 40 employess

-July 2011 - october 2011 - Piping foreman at Biesse Group Italy,

During this project I participated in modernization of the heating of Turin, having as main tasks:

-to prepar work permits, hot permits, confined space permits

-to check the daily activities at all working points;

-to ensure the supply of materials to all teams;

-supervising the hydro test

During this project I worked with size pipes between 1/2inch- 24 inch and I used only carbon steel

During thes period I commanded 25 workers

-February 2011 - June 2011 - Pipeline foreman at Boccard Franch -Interconnection GRT Gas Project

"with more than 32,200 km of pipelines, GRTgaz transports natural gas from its point of entry at the borders or methane terminals to the public distribution stations (3420 delivery points), to the main industrial consumers (approximately 1100 delivery points) and to the various underground storage tanks (12 sites) distributed throughout France. Under the supervision of the Energy Regulation Committee (CRE), GRTgaz carries out this activity on behalf of all natural gas suppliers present on the French market in a transparent and non-discriminatory way."

During this project I had like main tasks:

-to planing the daily activities in accrdance with weekly progress schedule;

-to supervising and controlling the daily activities;

-to check the parts position in the plant according on the location of the drawings indications;

-to check the joints beforewelding

I mention that all welds was tested X-Ray

Mostly I had about the same tasks as the previous job( without hydrotest)

Durind this project I worked with size pipes between 24inch-48 inch and wall tickness between 20mm-43mm and mterials as a : carbon steel and low alloys stainles steel

There I had 15 persons under command.

-February2010 - December 2010 - Piping foreman at Biesse Group Italy Extension ACCIAERIA ARVEDI CREMONA project

I participated to construction a galvanizing plant

The main tasks was about the same as previous job

I used pipes with size between 8 inch-24 inch carbon steel and stainles steel -October 2009 - February 2010 - Piping foreman at IREM Germany Ticona-TiGer project of Fankfurt

I participated to construction a farmaceutical plant

Mostly I had about the same tasks as the other piping foreman jobs

I mention that I worked only with stainles steel 2 inch-14 inch and I had 30 workers

-January 2007 - September 2009 - Assistant site manager at E TECNO SRL Italy-AL GHURAIR INVESTEMENT PROJECT (Q8 Refinery Napoli)

During rhis project I had like main tasks:

-to reported to the Site Manager the progress of the Subcontractors activities for his own discipline ensuring that plant construction works are performed according to the erection schedules and project documents within assigned cost budget

-to assist the Engineer Department in defining new prices for make amendmens to subcontracts and analysing and discussing claims;

I delegate more assistants whom he my support

-to cooperated with Technical Office for Constructability and fesability;

-To check the Suplier's materials and technical documentation

-to make sure that comply progress schedule and qality works

During this project had commanded 150 employess

-June 2006 - December 2006 - Piping supervisor at Bonatti Company of Kazakhstan - Karabatan Project

I participated to construction pipelines Interconnection Oil Terminal with Karabatan Refinery

I worked with s pipes size by 20 inch and wall tickness 24mm only carbon steel and low alloys stainless steel, all joints was preparated for X-Ray

During this project I had like main tasks:

-planing the daily activities according with weekly and monthly schedule;

-supervising and controlling the daily activities;

-check the pieces positioning in the field according with the drawings indication;

-check the measure,size, material of the pipes, valves, gaskets, elbows and other parts;

-check the joints before welding

During this project had commanded 20 employess

-January 2006 - May 2006 -Pipe fitter at Saipem of Kazakhstan -Kachagan Project

During this project I worked in workshop for fabrication the piles for Maritime Platform, size the pipes -102 inch and wall ticknes between 60mm-80mm

I had like main tasks:

-to read the drawings, marking, cutting with torch, plasma and mechanical,using the grinding machine, pencil grinder, driling machine, Tack welding and CO2, mentenance for mechanical equipments

-July 2005 - December 2005 - Pipe fitter at Bonatti Company of Kazakhstan - Karachaganak Pipe Line Project

During this project I had like main tasks:

-prefabrication, fabrication and instalation of pipes for wellhead;

-connecting with gas plant

I used pipes by 28 inch and wall tickness by 43mm

-January 2005 - June 2005 - Structure fitter at OMA Company of Greece,

-October 2003 - December 2004 - Piping foreman at SC Montubing Romania,

-November 1990-Octomber 2003- Pipe fitter at SC Rafinery Astra Romana Ploiesti - Romania,

-June 1989-November 1990 - Pipe fitter at Energomontaj Brasov - Romania,

-January 1988-May 1989 -Military service,

-September 1984-January 1988- Pipe fitter at Energomontaj Brazi- Romania.

During these periods I had like main tasks:

-Planning the daily activities, according with weekly and monthley progress schedule,

-Supervising and controlling the daily activities,

-Check the pieces positioning in plant according on the location of the drawings indications,

-Check the size, measures of the spools, valves,flanges, studbolts, gaskets, and other according with drawings indications,

-Check the joints before welding,

-Make the work permits, hot permits, confined space permits, and other permits,

-Hydrotesting,

-Commissioning,

-Make the daily reports after work schedule

-Prefabrication, fabrication and installation of pipes in the plant,

-Connection the pipes with the gas plant and the wellhead,

-Fabrication installation of pipes and the pipe rack and suports in the field,

-Bending activities for differently size of pipes according with drawings indications,

-Read the drawings indications,

-Using the hand tools and power tools, cutting torch, plasma,

-Tack welding,

-Maintenance for mechanical equipments.

I mention that I worked with pipes size between 1 2 inch-102 inches in diameter and wall thickness between 2 mm-80 mm, I used materials as a stainless steel, duplex, superduplex, carbon steel, cooper and other alloys.

Languages:-

English - both written and spoken

Iitallian-both written and spoken

Russinn-both writteh and spoken

Date:04 January 2016



Contact this candidate