Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Winnipeg, MB, Canada
Salary:
110,000
Posted:
February 18, 2016

Contact this candidate

Resume:

Patrick Lennox 1-204-***-****, actlob@r.postjobfree.com

Work experience and responsibilities as of December 2015

INTERLAKE SCHOOL DIVISION, 1990 – 2015, THIRTEEN SCHOOLS LOCATED OVER A 1000 SQUARE MILE AREA. RESPONSIBLE FOR FIVE YEAR ADMINISTRATIVE CAPITAL PLANNING FOR FUNDING APPROVAL, BUDGET ALLOCATION, AND SCOPE OF WORK FOR SEVERAL DEPARTMENTS I.E. NEW CONSTRUCTION, RENOVATIONS, AND MAINTENANCE. THE CAPITAL COSTS FOR NEW AND RENOVATION PROJECTS EXCEEDED $ 32,000,000. MAINTENANCE FUNDING FOR THE BUILDING DEPARTMENT WAS $ 50,000,000 PLUS.

MAINTENANCE AND PROJECT MANAGEMENT EXPERIENCE INCLUDES; REPLACEMENT OF ROOF SYSTEMS, ( BU, TORCH ON, METAL, SHINGLES, COPPER ).

REPLACEMENT OF EXTERIOR BUILDING ENVELOPE, BRICK VENEER, INSULATION, VAPOR BARRIER, WINDOWS, DOOR AND FRAMES, STEEL COLUMNS, JOISTS, AND BEAMS, CONCRETE FLOORS.

REPLACE HEATING BOILERS ( STEAM, HOT WATER, GYLCOL, ELECTRIC, CONDENSING BOILERS, SECTIONAL AND WATER TUBE ), FUEL OIL, NATURAL GAS, PROPANE, ELECTRIC.

REPLACE INTERIOR AND EXTERIOR POTABLE WATER AND SEWER PIPE SYSTEMS, INSTALL BACK FLOW PREVENTORS, WELLS, TROJAN UV DISENFECTION SYSTEMS IN SEVEN SCHOOLS.

REPLACE INTERIOR ACOUSTIC TILE, DRYWALL, SHEET FLOORING, ELECTRICAL, PLUMBING, PAINTING, EMERGENCY LIGHTING, FIRE ALARM SYSTEMS, PUBLIC ADDRESS SYSTEMS.

RESPOND TO ISSUES OF INDOOR AIR QUALITY, AND MOULD REMEDIATION.

THERE WERE AT TIMES, 45 PROJECTS IN PROGRESS OVER THE JULY AUGUST BREAK, ALL WERE COMPLETED EACH YEAR IN TIME FOR TEACHER ACCESS TO THE CLASSROOM IN SEPTEMBER.

PROJECT MANAGER NEW SCHOOL 2013 – 2014, RESPONSIBLE FOR THE SELECTION OF DESIGN ARCHITECTS, ENGINEERS, MUNICIPAL PERMITS, DAILY CONSTRUCTION INSPECTION, CHANGE ORDERS, AND SITE MEETINGS FOR THE NEW WOODLANDS SCHOOL AND DAY CARE.

PROJECT MANAGER FORT GARRY HOTEL RESPONSIBLE FOR DAILY SCHEDULING AND INSPECTION OF DEMOLITION, CONSTRUCTION, AND INTERIOR FINISHING FOR THE INTERIOR SPACE, CONSISTING OF 250 GUEST ROOMS, BALLROOMS, MEETING ROOMS, KITCHEN AND SUPPORT AREAS, ON 12 FLOORS. INSTALL EXTERIOR WALL FOAM INSULATION AND NEW WINDOWS, NEW ELECTRIC HEAT, PLUMBING, SUPERVISION OF 60 CONSTRUCTION AND SERVICE STAFF, COMMISSIONING AND MAINTENANCE OF HOTEL AFTER RENOVATION. THE HOTEL RENOVATION WAS COMPLETED IN 8 MONTHS AT A COST OF $ 12,000,000.

DIRECTOR OF FACILITIES MELFORT UNION HOSPITAL NEW CONSTRUCTION FOR 85 BEDS, LABS AND X-RAY DEPARTMENTS, KITCHENS, OPERATING ROOMS, LIFE SUPPORT SYSTEMS, PHARMACY, ETC. THE ORIGINAL HOSPITAL WAS BUILT IN THE 1930,S, I SUPPLIED ALL EXISTING STAFF WITH TRAINING TO OPERATE THE NEW HVAC, BOILERS, DDC SYSTEM, LIFE SUPPORT EQUIPMENT, ETC.

ELECTRICAL INSTALLATION SUPERVISOR RESPONSILE FOR ESTIMATING PROJECTS, BUDGETING, LABOR, COORDINATING OTHER TRADES ON JOB SITES, MATERIAL ORDERS FOR 8 MAJOR NEW SCHOOL CONSTRUCTION PROJECTS, MAJOR ELECTRICAL INSTALLATIONS ON NEW HOSPITALS, ADDITIONS, AND RENOVATIONS. INSTALLATION OF CONTROL AND ELECTRICAL SYSTEMS FOR COMMERCIAL AND INDUSTRIAL PROJECTS, I.E. ( WASTEWATER TREATMENT, SULPHUR AND HYDROGEN SULPHIDE EXTRACTION PROCESS, CONCRETE PIPE MANUFACTURING PLANT, FOUNDRY CASTING – ALUMINUM SMELTER INSTALLATION. ) RESIDENTIAL APARTMENT BLOCKS, COMMERCIAL OFFICE TOWERS ( 10 - 20 FLOORS ), OFFICE - WAREHOUSING PROJECTS.

PRESENTLY WORKING ON SOLAR PANEL DESIGN AND LOAD CALCULATIONS, ENERGY SYSTEMS

DIPLOMA PROFESSIONAL DEVELOPMENT ELECTRICAL MECHANICAL--PROCESSING

JOURNEYMAN ELECTRICIAN, H 1151 RED SEAL MANITOBA, # 6846 SASKATCHEWAN, #13542- ALBERTA, RED SEALS DEPARTMENTS OF LABOUR 3RD CLASS POWER ENGINEER, MANITOBA, SASKATCHEWAN, ALBERTA DEPARTMENTS OF LABOUR

WATER WASTEWATER TREATMENT UNIVERSITY OF SOUTHERN CALIFORNIA

WATER TREATMENT PLANT OPERATION 1 AND 11 USC SACREMENTO WATER DISTRIBUTION SYSTEM O AND M USC SACREMENTO SMALL WATER SYSTEM DISTRIBUTION O AND M USC SACREMENTO OPERATION OF WASTEWATER TREATMENT PLANTS 1 AND 11 USC SACREMENTO ADVANCED WASTEWATER TREATMENT USC SACREMENTO INDUSTRIAL CHEMICAL WASTEWATER TREATMENT 1 USC SACREMENTO WASTEWATER COLLECTION SYSTEMS O AND M USC SACREMENTO 1800 HOURS ACCUMULATED STUDY TIME TO DATE ON WATER -- WASTEWATER @ USC GRADE AVERAGE A

WATER WASTEWATER TREATMENT 2012 WINTER TERM RED RIVER COMMUNITY COLLEGE WATER WASTEWATER LEVELS 1 11 111 GRADE LEVEL A RRCC

DESIGN AND CONSTRUCTION OF LAGOON LINERS WESTERN CANADA WATER AND WASTEWATER ASSOCIATION

INDUSTRIAL PROCESSING SOUTHERN ALBERTA INSTITUTE OF TECHNOLOGY

CHEMICAL PROCESS OPERATION ALLOWS OPERATION OF REFINERYS, GAS PLANTS ONE YEAR DAY PROGRAM 1600 HOURS CLASSROOM TECHNICAL STUDY SAIT INDUSTRIAL PROGRAMMABLE CONTROLLERS SAIT INDUSTRIAL INSTRUMENTATION PNEUMATIC SWITCHING SAIT MICRO STERILIZER SYBRON TECHNICIAN ROCHESTER, NEW YORK

HVAC CONTROLS

HEATING AND AIR CONDITIONING EQUIPMENT INSTALLATION CALGARY AB. LENNOX INDUSTRY PHASE 11 AND 111 TRAINING SCHOOL 80 HOURS DAYS RSES GAS FIRED MAKE UP UNITS SERVICE TRAINING RSES HVAC PNEUMATIC JOHNSON CONTROLS INSTITUTE 5 DAYS MILWAUKEE,USA AUTOMATED BUILDING CONTROL SYSTEMS SAIT AUTOMATIC CONTROL FOR POWER AND PROCESS SAIT MOTOR CONTROL SYSTEMS ALLEN BRADLEY SAIT SIMPLEX CLOCK AND FIRE ALARM TRAINING SIMPLEX INTERNATIONAL

MANAGEMENT

PLANT ENGINEERING INDUSTRIAL, SUPERVISORY SITE CONTROL, SAIT COLLEGE, CALGARY COMPUTER PREVENTATIVE MAINTENANCE SYSTEM DPSI SOUTH CAROLINA ENERGY CALCULATION AND RETROFIT OTTOVAIANO TECHNICAL SERVICES HEALTH CARE SUPERVISION 1 SASKATCHEWAN DEPT.OF LABOUR EMERGENCY PLANNING FOR SCHOOLS EMO MB. GOVERNMENT MANAGEMENT HOW IT MUST CHANGE W.EDWARDS DEMING SCHOOL BOARD EMERGENCY PLANNING WORKSHOP 5 DAYS ARNPRIOR, ONT. ENERGY MANAGEMENT INDUSTRIAL APPLICATIONS NATIONAL RESEARCH COUNCIL ENERGY ENGINEERS TRAINING MB. HYDRO

WORKPLACE SAFETY AND HEALTH

SAINT JOHNS FIRST AID MANITOBA LABOUR WORKPLACE SAFETY AND HEALTH IN THE WORKPLACE MB. LABOUR HAZARD RECOGNITION AND INSPECTIONS MB. LABOUR CONFINED ENTRY MB. LABOUR CMHC / CHBA BUILDERS RADON REMEDIATION MB. LABOUR FORK LIFT TRAINING AND CERTIFICATION MB. LABOUR MATERIALS INFORMATION SYSTEM REGULATIONS WHIMIS INDOOR AIR QUALITY 1 - 11 IN SCHOOL BUILDINGS ASHRAE PESTICIDE APPLICATORS AND DEALERS LICENCE, MB. LABOUR

PATRICK LENNOX

204-***-****, 3647 ELDRIDGE AVE. WINNIPEG R3R2S1 actlob@r.postjobfree.com

REFERENCES

ROSS METCALFE SUPERINTENDENT INTERLAKE SCHOOL DIVISION 204-***-****

DR.KEN WOODLY SUPERINTENDENT INTERLAKE SCHOOL DIVISION 204-***-****

KEITH THOMAS RISK MANAGER MANITOBA SCHOOL BOARD ASSOCIATION 204-***-****

ROB OBIREK ARCHITECT, MCM ARCHITECTS 204-***-****



Contact this candidate