Prasenjit Adhikary

** ********* ****** ***** *, Bridgeport, Connecticut 06605

T: 203-***-**** E: actl4z@r.postjobfree.com

Area of Specializations

PLC Based automation. Installation & Commissioning. Project Management. Computer Networking.

Electrical Power Systems. Instrumentation.

Work Experience

University of Bridgeport, PLC & Automation Laboratory Sept 2015- Current Graduate Assistant for PLC & Automation Laboratory

• Expertise in programming in Allen Bradley RS Logix500 & Mitsubishi GX Developer.

• Hand on experience in Factory talk view studio software. McNally Bharat Engineering Company Limited, India December 2013- July 2015 Deputy Manager (Power Plant Projects), Corporate Office

• Coordinated with departments and assisted in smooth execution of the project.

• Responsible for preparing purchase requisition and purchase orders and coordinated with vendors. McNally Bharat Engineering Company Limited, India May 2012-November 2013 Deputy Manager-Operation & Maintenance (Power Plant Projects) Project: 2x600MW ESSAR Power Gujarat Limited, India

• Lead a team and succeeded in enhancing operation & maintenance of ash handling plant.

• Successfully handled emergency situations and implemented various techniques in improving boiler operation.

• Established good professional relationship with suppliers, contractors and client. McNally Bharat Engineering Company Limited, India Feb 2008-April 2012 Assistant Manager-Electrical/I & C (Power Plant Projects) Projects: 2x600MW ESSAR Power Gujarat Limited, India 2x250MW New Thermal Power Plant, MAHAGENCO, Maharashtra 2x210MW NLC Thermal Power Plant Expansion- 1, Tamilnadu 7x210MW NLC Thermal Power Plant-2, Tamilnadu

• Successfully installed and commissioned PLC system of GEFANUC(90-30,90-70,Rx3i) and Allen Bradley(RsLogix500).

• Successfully worked with I/O & NIU modules, Ethernet & MODBUS communication, TCP/IP protocols, switches and routers..

• Expertise in programming in GE FANUC Proficy Machine Edition software..

• Experienced in installation, commissioning and troubleshooting of field instruments in power plant.

• Experienced in electrical power distribution system.

• Successfully installed, commissioned and maintained LT and MV switchgears(up to 11KV),LT & HT drives(up to 500KW).

• Successfully ensured project completion within budget and on schedule and supervised all contractor work to ensure compliance with client requirements.

.

Ashirwad Infrastructure Private Limited, India June 2007- Jan 2008 Electrical Site Engineer

Project: 1x125MW Thermal Power Plant Kutch Lignite thermal Power Plant, India

• Successfully worked with control instruments at site.

• Supervised all subcontractor work to ensure compliance with client requirements. Internships/Trainings

JUSCO (TATA Enterprise) January 2007

• Studied and proposed design improvements to facilitate cost reduction for 132KV Substation at Sonari, India. Garden Reach Ship Builders & Engineers Limited (Ministry of Indian Defence) June 2005

• Exposed to maintenance & testing shops in ship building like control fabrication section, refrigeration & AC maintenance section. Education

University of Bridgeport, Bridgeport CT

Master of Science in Electrical Engineering, Expected Graduation 2017 Honours: Academic Scholarship, Aug. 2015

Nagpur University, India

Bachelor of Engineering in Electrical Engineering May 2007 Honours: Achieved 2

nd

rank among 700 students in the Department of Electrical, June 2005 Skills and Achievements

IT

“C”, AutoCAD, ERP, MS Office, labview, Packet Tracer Languages

Trilingual: Fluent in English, Hindi, German (A1 Certified) Achievements

Awarded a letter of appreciation from the highest authority of Thermal P o w e r Station-1(Expansion), Neyveli Lignite Corporation for upgrading automation system and implementing different parameters and instruments at ash handling system due to which energy consumption at ash handling system reduced by 30%, June 2011.