Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Lungsod ng Cebu, Gitnang Kabisayaan, 6000, Philippines
Salary:
4000 USD
Posted:
February 15, 2016

Contact this candidate

Resume:

R E S U M E

Name: Danilo Agosila Ogayon

Position Applied for: Testing Commissioning Engineer for Pasay Area

Availability : 5 days notice

Registered Electrical Engineer by the Philippine Professional Regulation Commission ( PRC ) : License No. 0014885

Home address: 129 Granada Street, Quiot, Cebu City, Philippines

Hand phone: +639*********

Landline +63-032-*******

Email address: actjja@r.postjobfree.com

actjja@r.postjobfree.com

Career Objective:

To contribute to my employer my 19 years of experience in the field of Electrical and Mechanical Engineering Pre Commissioning Testing Commissioning Quality Assurance Control and Maintenance to have a mutual relationship towards co-workers and management in which I would be able to share my Engineering and technical knowledge and skills acquired from my professional career.

Engineering Profile:

Detail-driven engineer with both Bachelors of Science in Electrical and Mechanical Engineering skilled problem identifier and trouble-shooter able to pinpoint breakdown root cause and resolve problems in early stages to avoid time/cost expenditures able to communicate in all level of management an active team player organized team leader with success in coordinating efforts to reach and surpass company’s expectations with skills in Electrical installations Quality assurance with high regards to quality of works and safety on work place with exceptional knowledge and hands-on for pre-commissioning testing and commissioning of various Electrical and Mechanical equipments both on oil and gas as well as power generation and distribution using latest test equipments. Equipment maintenance and root cause analysis.

Hands on experience on primary and secondary current injection simulation of protection relays on substation and smart grid such as HMI relays of ABB/Alstom/Schnieder/Seimens/merlingerin/Hyundai verification of pick up time drop off time alarm and trip time of relays such as relay 86/50/50N/51/51N/27/34/49/84/87T/25/64/REF and metering calibration / CT testing

PERSONAL INFORMATION

Date of Birth May 24,1960

Status: Married

Citizenship: Filipino

Height: 5’4”

Weight: 150 lbs

Age: 55 year old

EDUCATIONAL BACKGROUND

Bachelor of Science in Electrical Engineering 1980 – 1985

University of San Jose Recoletos

Magallanes Street, Cebu City, Philippines

Bachelor of Science in Mechanical Engineering 1987 - 1988

University of the Visayas

Colon Street, Cebu City, Philippines

WORK EXPERIENCES

1.0Electrical Project Engineer Cum QA/QC Engineer

May 10,2014 up to present

Company: Megawork Engineering and Services

Address: Green built Drive, Cebu City

Duties and Responsibilities:

1.1Supervise electrical installations monitor cost and prepare guidelines for contingency plan making sure that every project is on truck and hand over on time within the budget cost.

1.2Manages and implement company QCP/ITP and monitor equipments and material inventory making sure that material will arrive just in time .

1.3Power transformer installation complete protection and metering using CT and PT

1.4Conduct routine inspection on electrical and instrument installation and submit report to project team leader

2.0 Lead Electrical Engineer for Pre-Commissioning /Testing Commissioning cum QA/QC ( Down stream )

( Sept. 2, 2013 to April 30,2014 )

Company : ABB Pte. Ltd. Singapore

Project : JG Summit Petrochemical PE Expansion Project

Simlong, Batangas, Philippines

Scope of Works:

2.1 Manage all pre-commissioning /testing and commissioning of medium voltage substation

2.2 Hands-on on functional testing of switchgear and MCC modules

2.3 Hands-on for the simulation testing of power transformer protection device to MV switchgear

2.4 Coordination between ABB/TTCL and JG Summit of protection system scheme from upstream to downstream.

2.5 Conduct lectures to cadet engineers /OJT on the proper maintenance root cause analysis to avoid accidental and human error system interruption

2.6 Follow project standard and specification that system will operate as per design criteria.

2.7 Hands on setting up secondary current injection of protection relays such as ABB/Seimens/ Alstom /schnieder and Hyundai verification of alarm and tripping time on earth fault relay /overload relay/directional relay /differential relay synchronizing relay pick up time and angle /distance relay over voltage relay / frequency relay power metering calibration

2.8 Primary current injection of circuit breaker and current transformer verification of alarm and tripping time

2.9 Prepare QCP/ITP for electrical QA/QC team and develop test forms

2.10

3.0 Senior Electrical Commissioning Engineer

( March 21, 2012 to May 30, 2013 )

Company : Gulf Human Resources Development Company Abu Dhabi

Contract Seconded : National Petroleum Construction Company EPC

( NPCC ) Abu Dhabi, UAE

Project : ADCO, BAB Tamama “ G “ Habshan-2 1.8 MMBOPD

Down stream ( Remote degassing station

Scope of Works:

3.1 Manages all pre-commissioning /testing and commissioning /start up of 8 units Medium voltage substation for the remote degassing stations of ADCO in HABSHAN oil field expansion project.

3.2 Close monitor and pushing construction team for the priority system

Joint QA/QC team inspection for mechanical completion hanover

3.3 Review all drawings and raise technical query for verification

3.4 Witness all electrical site acceptance test.

3.5 Raise punch list items prior to the issuance of Mechanical Completion Certificate

3.6 Conduct actual electrical loop check dry and wet contact.

3.7 Conduct hands on transformer pre-commissioning test protection and metering

3.8 Conduct MV/LV Switchgear and MCC pre-commissioning test

3.9 Conduct lectures and training of maintenance screws on MV/LV motors

preventive maintenance and root cause analysis.

3.10 Reports to Commissioning Manager all daily activities21.11 Conduct tool box meeting

3.12 Review JRA and MS, ICAPS and adherence to company QCP/ITP.

3.13 Responsible for the Pre-commissioning testing and Commissioning of Remote Degassing Stations such as RDS-7, 8,9 and 10 secondary current injection of protection relays verification of alarm and tripping time of relay 86/27/64/87T/50N/51N/37

3.14 Conduct lectures to my subordinates on the proper step by step procedure on electrical controllers and protection system to understand the function the cause and effect application of basic electrical trouble shooting analysis to be able to establish the root cause.

3.15 Authorized ADCO Job Performer JP ID: NPC327

2.16 Strict adherence to project standard and specification that system will operate according to design criteria.

4.0 QA/QC Engineer Cum Electrical Commissioning Engineer

( August 1, 2011 to March 16,2012 )

Company: ABB Industry Pte. Ltd.

2 Ayer Rajah Crescent, Singapore

Client: Hyflux

Owner: Tuas Power Singapore

Project: SEA WATER INTAKE FACILTY

Location: Tembusu Jurong Island Singapore

Upstream/down stream

Scope of Works:

4.1 Manage all electrical pre-commissioning /testing and commissioning

Of 2 units 50MVA each medium voltage substation monitor and

Pushing construction commissioning priority system

4.2 Testing of Power transformer 150 MW 3 units

4.3 Testing of MV/LV switchgear

4.4 Conduct lectures for maintenance screws on the proper preventive maintenance approach and root cause analysis

4.5 Testing of C.T and P.T and protection relays and metering calibration

4.6 Preparation of Inspection Test Plan

4.7 Testing of SF6 vacuum circuit breaker

4.8 Simulation of protection system by secondary current injection of relay

50N/51N/27/49/86/87T/25/84/34

4.9 Preparation of Method statements and risk assessment

4.10 Assist Maintenance Department for the root cause analysis of existing power plants as part of the project contract addendum.

4.11 Strict adherence to project standard and specification and make sure that system will operate as per design criteria.

5.0 E&I QA/QC Manager( IC&T Package Sept. 1, 2010 to June 30, 2011 )

Company: ABB Industry Private Limited

2 Ayer Rajah Crescent, Singapore

Client: Foster Wheeler Worley Parson Joint Venture

Projects: Singapore Parallel Train ( SPT Project )– ExxonMobil Refinery (Upstream and down stream )

Jurong Island Singapore

Scope of Works:

5.1 Reports to Project Manager daily updates of E&I QA/QC activities

5.2 Attend meetings with client top management concerning QA/QC test report submission, technical site query, notice of revision and designed verification.

5.3 Conduct spot inspection on site to verify mechanical completion

5.4 Monitor/review all design changes and raise technical query for verification.

5.5 Manage group of QA/QC inspectors by manpower loading per area of responsibility.

5.6 Manages group of Turnover Engineers document controller to make it sure daily assigned task are properly encoded, filed and handover to client

5.7 Review Inspection Test Plan and Inspection Test Report and verify that all necessary information are in placed.

5.8 Review method statement and Job Risk Analysis.

5.9 Conduct Pre Task Talk a system implemented by ExxonMobil and Foster Wheeler prior to start work at the work place to distinguish hazard.

5.10 Conduct spot inspection on field to ensure that all construction and QA/QC manpower are strictly following ExxonMobil safety standard such as permit to work, use of proper tools proper PPE and other safety gadgets required to do the job safely.

5.11 To stop any work on site found not following as per drawing and standard to issue NCR to sub-contractor as per violation.

5.12 To coordinate construction superintendents, supervisors for proper activities update to report to client during daily meeting

5.13 Attend top management coordination meeting between ABB/ Foster Wheeler/ Worley Parsons and ExxonMobil project directors of SPT Project to discuss all construction and QA/QC issues and other matters not to delay project completion.

5.14 Contributed to the project total 3 million man hours without Lost Time Injury.

5.15 Manage punch list team to clear system punch Category A/B and C and for final system handover.

5.16 Manage loop check team to finished scheduled dynamic and static loops.

5.17 Reference standards ExxonMobil Global Practice, IEC,IEEE, ANSI and Electrical Mechanical local codes

5.18 Incases of urgent jobs on site will do hands-on testing and commissioning on POWER transformer, Switchgear and MCC and assist on site dynamic instrument loop check.

5.19 Conduct site inspection with clients and sub contractors

5.20 Conduct lectures for maintenance screws for the proper monitoring of electrical equipments for early failure analysis.

5.21 Follows strictly to project standard and specifications making sure that system will be functional according to design criteria.

6.0 Senior Electrical Commissioning Engineer ( March 23, 2009 to Aug. 31, 2010 )

Company: ABB Industry Private Limited

2 Ayer Rajah Cresent, Singapore

Client: Foster Wheeler /Worley Parsons Joint Venture ( FWP –Venture)

Projects: 1. Shell MEG – Jurong Island, Singapore

2. Shell Refinery Pulau,Bukom Island, Singapore

Down stream

Scope of Works:

6.1 Conduct multiple activities on pre-commissioning testing and commissioning verified the functionality of the equipment for actual operation at interface level and works closely and jointly with vendors designers and testing team to reach the project objectives perform equipment protection simulation testing to ensure all interfacing to process and non process equipment are synchronized working properly as per design criteria and process requirements hands on simulation of protection relay verification of alarm and tripping time pick up time drop off time of relay 86/50N/51N/87T/25/34/74 and power metering calibration

6.2 Conduct joint installation inspection with site supervisor /client and vendor to verify and declare mechanical completion

6.3 Submit technical query to client Engineering Department any designed discrepancy found not synchronized and irrelevant to process requirements for final commissioning simulation. Active member of HAZOP committee

6.4 Conduct lectures of maintenance screws on the proper procedure on the MV/LV switch gear preventive maintenance approach.

Test Equipments Hands-on setting up and operation:

1. Digital /Analog Primary current injectors (Oden Programma)

2. Digital /Analog Secondary current injectors 3 phase and single phase units

3. Digital Current Transformer Analyzer (omicron )

4. Digital low resistance meter (DLRO)

5. Insulation resistance meter ( 500V up to 10KV )

6. DC High voltage tester up to 100KV

7. Very low frequency ( VLF )high voltage tester for medium and high voltage cable

8. Circuit Breaker timing test equipment

9. Transformer winding ratio test equipment

10. Transformer power factor test equipment

11. Assist and submit report on the machine failure on the existing oil facilities as part of the project addendum contract and warranty period.

12. Strict adherence to project standard and specification and make sure that system will operate as per design criteria.

7.0 Electrical Commissioning Supervisor ( November 5, 2009 – March 4, 2009 )

Company : Keangnam Enterprises Ltd.

Lot 32 Villa Clarise,parcelle 14/22

Salazamay Sud,501-Tamatave

Republic of Madagascar

Project: Ambatovy Power Plant ( 135 Megawatt –Steam Turbine ) Down stream

Client : SNC Lavalin Engineers and Constructors

Owner: Sherritt International Corporation of Canada

Scope of Works:

7.1 Inspection of electrical package equipments testing and documentation for quality assurance of equipment installations and functionality conduct multiple pre commissioning testing and commissioning activities and evaluate test result must be in conformance to specified parameters to attain quality objectives

7.2 Compare Factory Acceptance Test (FAT) to Site Acceptance Test ( SAT ) for client Engineering comments. Active member of HAZOP committee

7.3 Hands on setting up of secondary current injection of protection relays such as 50/50N/51N/86 /25/27/34/74 /87T

8.0 Electrical Commissioning Engineer (January 28,2008 – July 6, 2008 )

Company : Al Ghanim International EPC

AZ ZOUR Power Plant Project

Client: Kuwait Ministry of Electricity and Water

Mina AZ Zour Port, Kuwait ( down stream )

Scope of Works:

8.1 Leads the testing and commissioning technicians for the proper execution of pre commissioning testing and commissioning activities with high degree of safety on the work place ensure that all equipment functionality conforms with the design parameters and process requirements raise technical query to engineering any variation and modification on site prior to implementation and execution conduct mechanical and electrical pre commissioning testing and commissioning of the close water cooling system for the five units gas turbine at 200MW per unit, conduct pre commissioning testing and commissioning of the fire protection and deluge system conduct pre commissioning testing and commissioning of power transformer GIS gear medium and low voltage switchgear, attend daily coordination meetings with client and sub contractors and vendors monitor daily progress accomplishment verify any modification and report to project manager.

8.2 Monitor and pushing construction for commissioning priority system for handover

8.3 Hands on for setting up protection relay testing by secondary current injection of 50/50N/51N/25/86/34/74/27/87T

9.0 Site Substation Supervisor (January 17 2007- January 16,2008)

Company : Consolidated Constructors Company EPC

Project : Khursaniyah Gas Plant

Khursanuyah, Jubail Area, Saudi Arabia

Client: Bechtel /Technip Join Venture ( BTJV )

Scope of Works:

9.1 Manage all electrical activities inside substations with medium and

low voltage switchgears

9.2 Evaluate execute assigned scopes of works in accordance with procedures monitor progress of all execution Group scope of works.

9.3 Coordinate all site activities to ensure that site teams can work effectively and efficiently.

9.4 Manage all site procurement for installation modification and testing requirement to ensure that logistic and store are controlled.

9.5 Manage all sub contractors on site and ensure that quality of work and certifications meet the client standards

9.6 Monitor and review all design changes and raise site technical query to engineering for review and approval.

9.7 Monitor and close out all electrical interface issues together with engineering project manager and client authorized representative.

9.8 Highlight risk associated activities and resolve critical issues and propose mitigation plan.

9.9 Develop worksheet for job and all records of equipment are in order for delivery.

9.10 Supervise witness testing commissioning of all installed equipment to ensure proper functionality and conforms the design criteria and process requirements.

9.11 Adherence to Saudi Aramco Engineering Standard ( SAES )

9.12 Strict adherence to project standard and specifications making sure that system is functioning as per design criteria.

10.0 Electrical Project Engineer (July 10,2002- June 2006)

Company : Taft Property Ventures Corp.

Ayala Business Park, Cebu City, Philippines

Client : Gaisano Group of Companies ( down stream )

10.1 Plan and schedule works with reference to contractual schedules

10.2 Coordinates goods delivery with suppliers and installation works with sub contractors as required

10.3 Attend to all operational matters related to the daily running of the project

10.4 Liaise to customers/consultants/project managers concerning approval of plans and drawings acceptance of works problem solving and the like

10.5 Attend site meetings and inspections report regularly on progress and monitor project schedule

10.6 Prepare up dated as built drawings for submission to the project manager and customers.

10.7 In-charge for the repair and maintenance of all construction heavy equipments such as: bulldozers, Backhoe, Graders,Vibrators, Compactors, Transit mixers, Concrete Pump,Dump Trucks and Crushers.

10.8 Testing and commissioning of the completed installations with customers consultants and sub contractors.

10.9 Coordinates with customers / consultants / project managers to handover completed installation with O&M manual

11.0 Electrical Maintenance Engineer (August 2, 1997 – Sept.2,1999 )

Company : M.S. Al Suwaidi Est. for Contracting

Al Jubail, Saudi Arabia

Client : HADEED ( Saudi Iron and Steel company) down stream

Area: 25 kilometer iron ore conveyor system from Port Ship Loading up Direct Reduction Plant with 9 transfer towers

11.1 Work closely with maintenance manager to achieve company goal of zero unplanned shutdown

11.2 Designing maintenance strategies procedures and methods for preventive maintenance

11.3 Planning and scheduling preventive maintenance by system priorities.

11.4 Diagnosing breakdown problem to evaluate and pinpoint the root cause.

11.5 Directing instructing and supervising maintenance technicians

11.6 Liaise with different department for the proper stock and inventory of maintenance and commissioning spare parts

11.7 Monitoring and controlling maintenance cost

11.8 Writing maintenance strategies to help the installation commissioning guidelines and standard operation procedures

11.9 Provide technical training for new comers

11.10 Ensure 24/7 hours full coverage monitoring for the production line

12.0 General Services Dept. Head ( May 24, 1992 – June 1996 )

Company : Superior Gas and Equipment Co. ( SUGECO )

Basak, Mandaue City, Philippines

12.1 In-charge for the SUGECO Group of companies expansion projects for Air Separation Plants such as Liquid and Gas Oxygen Nitrogen Argon and Acetylene Production Plant on electrical design/construction and implementation.

12.2 In-charge for the pre-commissioning/testing and commissioning maintenance of all Plant electrical equipments and facilities.

12.3 In-charge for the maintenance of Plant storages and blast freezers for the food export business.

12.4 In-charge for plant electrical and instrumentation preventive maintenance schedule, and implementation.

12.5 In-charge for the proper maintenance of delivery trucks service transport for product oxygen/ nitrogen Argon and acetylene gas cylinders direct to distributors, and consumers

13.0 Cadet Engineer (April 21,1990- Oct. 23,1990)

Company : Visayan Electric Company ( Power Utility Company )

Cebu City, Philippines

13.1 Transmission and distribution design, and construction implementation.

13.2 Power metering installation for industrial commercial and residential customer

13.3 Substation tender monitoring and maintenance

13.4 Power transformer rewinding testing and commissioning

13.5 Distribution transformer installation

13.6 Transmission pole erection stringing and power line clearing

13.7 Attend coordination meeting with respective department heads

14.0 Shift Electrician ( Nov. 1,1985 – Nov. 30, 1989 )

Company : Pillsbury Mindanao Flour Mills

Kiwalan Cove, Surigao City Philippines

14.1 Work closely with maintenance supervisor

14.2 Implement preventive maintenance schedule

14.3 Repair and Maintenance of HVAC Blast freezers and cold storage

14.4 Repair and Maintenance of all Flour mills electrical facilities

14.5 Motor and Generator rewinding

14.6 Active team player to achieve maintenance objective

SKILLS

• Knowledgeable in Testing & Commissioning Activities using latest test equipments

• Able to set up and operate a variety of latest electrical test equipments

• Computer Literate (Windows 2000/XP/ Microsoft Office, Excel )

• Knowledgeable in HV/ MV Switchgear Operations, Relaying, Motor Control, Center Instrumentation, PLC,VFD / Power Transformer, EHV GIS

• Knowledgeable in Electrical Construction Norms and Procedures

• Familiar of common standards IEEE, SAES, NEC, ANSI, IEC and ISO 9001:2000 Standards

• Testing and proper maintenance of power Transformers, motors and generator protection system and HVAC

ORGANIZATIONS

• Member Integrated Institute of Electrical Engineers of the Philippines Cebu City chapter IIEE

• Member Philippine Society of Mechanical Engineer Cebu City Chapter

CHARACTER REFERENCES

Engr. Stephen Smith actjja@r.postjobfree.com NPCC

Comm. Manager

Engr. Ramesh Kumar actjja@r.postjobfree.com NPCC

Lead Comm. Engr.

Engr. Lomerato Reyes actjja@r.postjobfree.com ABB Pte Ltd. SG

Project Manager

I certify that all the entries are true in the best of my knowledge and hence I have a total of 19 years of actual experience in the field of my profession as Electrical Engineer by the virtue granted upon me by the Philippines Professional Regulation Commission with my License No.0014885 to practice my profession.

Danilo Agosila Ogayon



Contact this candidate