SYED ABRAR HAIDER ABIDI
Mobile: +92-333-*******
****************@*****.***
OBJECTIVE
To get an opportunity to improve my existing technical skills and to develop new ones by working as a part of a team of talented people in a competitive and challenging environment.
EXPERIENCE
Worked in Telecom Company Quick link Communication as an assistant RF Engineer
For the last five Year,In Pakistan.
RF Engineer
May 2005 to Date at Quicklink (Pvt) Ltd. Working as an assistant RF Engineer for Installation and Commissioning of C and Ku band VSATS. I have worked on the following Equipment
SCPC,TDMA and FDMA
iDirect Satellite Routers(3000,5000 Series)
iDirect Hub(Monitoring, and operating)
Comtech L-Band and IF Band Satellite Modems(sdm300,570,550)
Linkstar RCST
Datum Technologies L-Band Satellite Modems(4900,500)
Motorola Canopy P-P AP and SM Equipment
-Cisco Router
-Antennas assembling(1.2,1.8,2.4,3.7,4.5,mtr)
Codan,EF Data,Mitech,Upcom,Anacom,Agilis
LAN & WAN Networking
wireless motorola canopy
JOB DESCRIPTION:
To check the documents before making an entry into the Communicating directly with the client if required.
LANGUAGE:
English, Urdu, Punjabi
EDUCATION:
High School Certificate (Rawalpindi )
(1998-2000)
PROJECT:
Course
Project Title
Dev. Environment
3 Month Diploma in Information Technology (DIT)
JOHER INSTITUTE OF INFORMATION TECHNOLOGY
GRAD-B
JANUARY (2003)
ZAIFCO ENGINEERS AND CONTRACTORS
( LG )Gold Star Lift & Escalator
Mechanical & Electrical
(ENG)
January 1996 to December 1996
Saudi Pak Tower (Islamabad)Pak
Lift Operator GoldStar high speed lift
January 1997 to June 1998
UNDP
Sustainable human Development
Surf South &West
Asia (Sub-Regional
Facility)
Elevator Operator in Saudi Pak Tower
25 July 2001
Quicklink(PVT)
LTD,Islamabad
Pakistan
Hi-Tech Center,
Street 39,I & T Center,
G/10/4,Islamabad
Pakistan.
V SAT
RF Engineer
15 March 2005 to Still working as a
RF Engineer
Iraq Project (Baghdad)
Certifcation
MIT with US ARMY
Installation and troubleshootin of iDirect 3100,5100 Series Modem
For 2Month in 2009.
July 16,2007 to,
July 19,2007
Install 3Vsat 4.5meter with DVB modem, Agillis 80Watt Buc.
SpeedCast Limited.
HongKong
Iraq Project(Basra)
CNPC
Jun 2010
Install 2Site 3.7Meter antenna in Basra & Kutt.
IRAQ Project(Erbil)
Quicklink (GSM)
October 2011
Installation BTS & Commisstioning,for NSN in Iraq Erbil.+MW configuration and troubleshooting.
Iraq Project (Baghdad)
Huawei Technologies
August 2011
Installation Report Implementations of Redundant VSAT System
Iraq Project (Erbil)
KCA DEUTAG
November 2013
Installation on Rig site’s ( T80-T63-T221)
Quicklink (PVT)
Gwadar port (PK)
GSM Over VSAT Backhaul Solution
Jun 2010
Installation 2.4m suman antenna
SCPC
Quicklink (PVT)
Islamabad (PK)
BGP Inc
2006
Hub installation 3.7Meter,remote installation 2.4meter, SCPC
Astrium Iraq Project (Erbil)
UNDP
2013
Trubleshooting antenna 2.4meter
(SCPC)
Vizadanetworks
Iraq Project (Erbil)
WHO
2012
Migration Project
International Driving licence;
Expire Date; 29Aug 2016
Work with Transponder,
(1)PCCW Globel
(2)Speedcast
(3)Signalhorn
(4)Orange
(5)Astrium services
(6)Hermes telecom.
(7)Astrium
(8)Vizadanetworks.
HOBBIES,
Playing Cricket, Snooker,Reading Books
Reffrence: will be provided on request.