Post Job Free

Resume

Sign in

Electronic Tech. / ETO /Electrician / E&I Tech. /Lay Tech Electrician

Location:
Special Capital Region of Jakarta, Indonesia
Posted:
February 13, 2016

Contact this candidate

Resume:

* ** *

CURRICULUM VITAE

Personal Identification

First Name TEUKU HAMDI

Place / Date of Birth 25-08-1974 / Aceh, Indonesia Marital Status Married

Sex Male

Nationality Indonesia

Address Rindang Village E/31 Buliang, Batu Aji, Batam Island, Indonesia Phone +627******** / +628********** / +628********** Email actis6@r.postjobfree.com,actis6@r.postjobfree.com

Skype (Twitter ) tehamdi74 ( https://twitter.com/vionisham ) Public blogspot http://www.linkedin.com/profile/edit?trk=hb_tab_pro_top Option of

Application

Electronic Tech.

(ET)

Electro Technical Officer

( ETO )

Electrician

( E&I )

Lay Technician

( Electrical )

Travel of

Document

Number of

Certificated

Place / Institution Date of

Issue

Date of

Expiry

Passport A1651743 Emigration, Batam 06/12/2011 06/12/2016 Seaman Book C028180 Batam 11/04/2014 11/04/2017

Certificated Of

Proficiency ( CoP )

Number of

Certificated

Place / Institution Date of

Issue

Date of

Expiry

Base Safety Training

BST

6202133756013914

Makofano Training

Centre Batam,

Indonesia

13/03/2014

13/03/2019

Rating Forming Part of

An Engine

Watch_RFEW

6202133756350714

PMTC Pertamina

Jakarta, Indonesia

20/12/2014

20/12/2019

Proficiency Survival

Craft & Rescue

Boat_PSCRB

6202133756040714

PMTC Pertamina

Jakarta, Indonesia

30/10/2014

30/10/2019

Advanced Fire

Fighting_AFF

6202133756060714

PMTC Pertamina

Jakarta, Indonesia

28/11/2014

28/11/2019

Medical First Aid

Training Program_MFA

6202133756070714

PMTC Pertamina

Jakarta, Indonesia

24/11/2014

24/11/2019

Ship Security

Awareness

Training_SAT

6202133756310714

PMTC Pertamina

Jakarta, Indonesia

01/11/2014

01/11/2019

For Seafarer With

Designated Security

Duties_SAT_SDSD

6202133756320714

PMTC Pertamina

Jakarta, Indonesia

04/11/2014

04/11/2019

Basic Oil & Chemical

Tanker Training_BOCT

6202133756390714

PMTC Pertamina

Jakarta, Indonesia

12/11/2014

12/11/2019

2 of 5

Complement of

Certificated

Number of

Certificated

Place / Institution Date of

Issue

Date of

Expiry

Basic Offshore Safety

Induction & Emergency

Training & Travel

Safely by

Boat_BOSIET,TSbB

939257070304131663

AST M&O Australia,

Batam Indonesia

02/04/2013

02/04/2017

Supervisor Safety

IP/SSF/199667/10

Indosafe Pratama

Batam, Indonesia

19/08/2010

No limit

Advance First Aid

Training

-

Indosafe Pratama

Batam, Indonesia

03/11/2013

No limit

Hazard Identification &

Risk Assessment

MEG/HIRA/013/2010

Megaron Batam,

Indonesia

17/05/2010

No limit

Personal Development

Adventure

010503

Jet Asia Singapore,

Batam, Indonesia

21/02/2003

No limit

Basic of Military

Education

S/147/X/DIKSAR/1994

Secata B, Indonesia

01/10/1994

No limit

Diploma III Electro_DIII

Electro

26987/0122/P.E/DIII/1

998

Undalas University

Padang, Indonesia

04/04/1998

No limit

Electro Technical

Officer_ ETO

1234/EXP/11/XI/2014

PT.Expertindo

Indonesia

17/11/2014

No limit

DP Maintenance (K-

Pos_ Kongsberg )

80188 Emas Academy

Singapore

21/01/2015

No limit

Electro Automation 2259/LP3M/X11/07 LP3M Indonesia 01/01/2008 No limit Power Electronic

Education

006/SERT.ITS/POLMA

N/2001

Polman Babel,

Indonesia

23/11/2001

No limit

Electrical &Instrument_

Oil & Gas

UINDT-EI-05-044-09 Universal Power

Vision, Indonesia

20/11/2009

No limit

Electrical Transian

Analisis_ETAP

752/C/TR-ETAP/01-

BATAM-05/2012

Oil Institute Batam,

Indonesia

29/05/2012

No limit

Hazard Location

Underwriter

Laboratories Inc._UL

HLULT201310029 ELPRO, Iqbal Yos

Batam, Indonesia

23/10/2013

No limit

CNC and EMI/NDT PT.Citra Tubindo

Batam, Indonesia

No limit

Skill and Software reference

• Ms. Office, Visio, AutoCAD, and window application soft .

• PLC-5, RSLogix 5, RSLogix 500, RSView 32, Omron,Twido, Simatic S7, Mitsubishi.

• INtool, INcalc, Firstvue Fisher,Consolidate (Inst. soft).

• Hartcom 275,375, DWT, Resistor Decade, Calibrator, Amp Injection, HI pot (cal.Tool).

• RTM Roctex,Etap, LiteGuide, OptiWin glamox, Luxicon (elect soft).

• Familiar with international standard .

Scope of Capability

• Power Management ( MSB, ESB, UPS, Trafo, Motor, MCC & Generator control system ).

• Hydraulic and Pneumatic System.

• Conventional and Automation ( PLC, Inverter / VSD/VFD ).

• HVAC & PAGA.

• Equipment system ship & barge troubleshooting.

• Electrical, Electronic, Inspector, commissioning and calibration skill .

• TVRO & CCTV broadcasting.

• Thruster / DP Electrical Syste literate (Kongsberg)

• Navigation/Communication & Networking .

• Pipe oil & gas Processing and testing.

• Cement Processing.

3 of 5

• Structure and Fabrication

• Offshore / Onshore Construction & Marine Crew

Language Skills

Indonesia : Mother tongue

English : English Practice and more applicable.

Summary of Experience in Vessel Sea Offshore

Vessel Company

Type

of

Vessel

DWT /

GRT

Type of

Engines

BHP Rank

Sign on

Date

Sign off

Date

Jascon 18

Sheffield (

Seatruck

STG )

DP3

pipe

crane

vessel

29513

DWT

Kato

(EMDSI)

EMD L20-

710G7B

8x3580

KW

Electrician

27/08/2015 22/09/2015

Sapura

Kencana

SK-900

Sapura

Kencana

( WWOSL)

DLB

pipe

crane

Barge

33451

DWT

Caterpillar

245-3070

4x1530

KW

Electronic

Technician

(ETO)

08/03/2015 15/06/2015

Emas

Lewek

Centurion

Emas

Singapore

( Kuiper )

DP2

pipe

crane

vessel

27082

DWT

MAN

8L32/40

4x3485

KW

LayTech._El

ectrical (ET)

16/04/2014 01/09/2014

PJW3000

Swiber

Offshore

Singapore

( OER )

DLB

pipe

crane

Barge

40612

HYUNDAI

25/33

4x2500

KW

Electronic

Technician

(ET)

15/09/2012 13/04/2014

Kalinda

PT.

Geocean

Indonesia

DLB

pipe

crane

Barge

3387

GRT

MAN..

6x350

KVA

Electrician

12/02/2008 21/03/2008

Summay of Experience in Onshore

Company Project Name Type of Project Rank

Sign on

Date

Sign off

Date

PT.Petrus Indonesia Pontianak Project (

PLN )

Power Plan System E&I

Engineer

01/01/2012 01/06/2012

An’t Niaga Coorpora

(Scheneider Partner)

PLTU Keban Agung

Lahat

Power Plan System E&I

Engineer

01/07/2012 01/09/2012

Midong E&C Co,Ltd

( Saudi Arabia )

Saudi South Steel Mill

( STX)

Steel Mill Plant E&I

Engineer

02/12/2010 27/11/2011

PT. Megaron Semesta

( Wasco Group )

TGT,P-

55,Jubile,OYO,Gajag

Baru, Pluto, Usan (

BAB,Modec,Quip,Sei

mens,Violia,Primeir

Oil )

Wellhead Plateform &

Top Side ( E-House)

E&I

Engineer

04/08/2008 01/12/2010

PT. BYP ( Nippon

Steel Batam

Peciko 5, North Belut

C,D ( Total & Conoco

Philip )

Wellhead Plateform &

Top Side

E&I

Calibration 03/04/2008 23/07/2008

PT.City Tran Utama (

Pt.Profab Batam )

Codeco ( Sempec ) Wellhead Plateform &

Top Side

E&I

Engineer 01/05/2007 25/10/2007

PT. Cement Batam (

Bosowa Group )

Packing & run Mill

Plant Process

Cement Plant Electrical

Staff

19/10/2005 23/04/2007

PT. Citra Tubindo Tbk

Batam

Treatment,Testing &

O&G Pipe Plant

Process

Pipe Oil & Gas Plant

Electrical

Technician 01/01/1998 20/06/2005

Pt.Palma,Eco Green

Shipyard

Merine & Chemical

Plant

E&I

Engineer 2001 PRESENT

4 of 5

Detail of Experience

1. SHIFFIELD ( STG SEATRUCK )

JASCON 18 DP3 VESSEL

PROJECT:

a. Sea Trying and Commissioning Project ( Offshore Singapore ) Function: Electrician

Action / Responsibilities:

• Troubleshooting and fault finding DP system ( Kongsberg ).

• SAS tensioner, A/R Winch & Stinger, SAS roller conveyor machine operation.

• Monitoring the functioning of the electrical equipment.

• Assisting senior engineers for maintenance.

• Floating (Huisman) and pedastel (TTS) crane troubleshooting

• Experience in servicing MSB, ESB & Engine / Generator

• Experience in servicing pneumatic machines and valves.

• Experience in servicing hydraulic & Servo valves

• Experienced in pneumatic operating systems.

• Knowledge PLC ( Siemens Simatic S7, alley Bradley, omron) and VFD motor system

• Familiar with Elevator and equipment ship/barge system troubleshooting. Duration: 27 August 2015 – 22 September 2015

2. WORLD WIDE OFFSHORE LIMITED (WWOSL)

SAPURA KENCANA DLB SK-900 BARGE

PROJECT:

a. Kepodang Pipe laying Equipment Project, Java sea ( Offshore Indonesia ) Function: Electronic Technician (ET)

Action / Responsibilities:

• Troubleshooting and fault finding.

• Remacut tensioner, A/R Winch & Stinger machine operation

• Knowledge in winch operation Mac Gregor.

• Monitoring the functioning of the electrical equipments.

• Assisting senior engineers for maintenance.

• Knowledge in SAS roller conveyor machine operation.

• Floating (CLYDE), crewler (HITACHI) and pedastel crane troubleshooting

• Experience in servicing MSB, ESB & Engine / Generator

• Experience in servicing pneumatic machines and valves.

• Experience in servicing hydraulic & Servo valves

• Experienced in pneumatic operating systems.

• Knowledge in automatic telephone & PABX exchange system.

• Knowledge in Navigation & network connection system.

• TVRO & CCTV broadcasting

• Knowledge PLC ( Siemens Simatic S7, alley Bradley & omron ) and VFD motor system

• Familiar with Elevator,anchor winch and equipment ship/barge system troubleshooting. Duration: 08 March 2015 – 15 June 2015

3. KUIPER OFFSHORE SERVICES

EMAS LEWEK CENTURION DP2 VESSEL )

PROJECT:

a. Husky China / Seipem, Pipe laying Liwan Deepwater Project ( Offshore China ) Function: Lay Technician_Electrical (ET)

5 of 5

Action / Responsibilities:

• Electrical maintenance in a limited time.

• Troubleshooting and fault finding.

• SAS tensioner M/C, Stinger & A/R Winch machine operation .

• Basic knowledge in winch operation.

• Working knowledge in basic LAN / network connection system.

• Monitoring the functioning of the electrical equipments.

• Assisting senior engineers for maintenance.

• Knowledge in SAS roller conveyor machine operation.

• Knowledge PLC ( Siemens Simatic S7 ) and VFD motor system

• Craine pedastel Huismand & Kenz troubleshooting

• Experience in servicing pneumatic machines and valves.

• Experience in servicing hydraulic valves.

• Experienced in pneumatic operating systems.

Duration: 16 April 2014 – 25 September 2014

4. SWIBER OFFSHORE SERVICES (OER)

DLB PJW-3000 BARGE

PROJECT:

a. Zawtika Pipe laying Equipment Project ( Offshore Myanmar ) b. Yadana -Total Myanmar,lifting jacket & plateform project ( Offshore Myanmar ) c. BSP Shell ( Brunai ) – Lifting & Installing jacket / module system d. Sisi Nubi-Total (Indonesia) – Lifting & Installing jacket / module system e. Santos Surabaya (Indonesia) – Lifting & Installing jacket / module system f. Banuwati CNOOC project (Indonesia) – Lifting & Installing jacket / module system Function: Electronic Technician (ET)

Action / Responsibilities:

• Troubleshooting and fault finding.

• Remacut tensioner, A/R Winch & Stinger machine operation .

• Basic knowledge in winch operation.

• Monitoring the functioning of the electrical equipments.

• Assisting senior engineers for maintenance.

• Knowledge in SAS roller conveyor machine operation.

• Floating (ZPMC),crewler(HITACHI)and pedastel(CMS) crane troubleshooting.

• Experience in servicing MSB, ESB & Engine / Generator.

• Experience in servicing pneumatic machines and valves.

• Experience in servicing hydraulic valves.

• Experienced in pneumatic operating systems.

• Knowledge in automatic telephone exchange system.

• Knowledge in Navigation & network connection system.

• TVRO & CCTV broadcasting

• Knowledge PLC (Siemens Simatic S7,alley Bradley & Schneider ) and VFD motor system

• Familiar with Elevator,anchor winch and equipment ship/barge system troubleshooting. Duration: 15 September 2012 – 13 April 2014

5. AN’T NIAGA CORPORA ( PARTNERSHIP SCHNEIDER INDONESIA) PROJECT :

a. PLTU Keban Agung Lahat, South Sumatra, Indonesia - 2x135MW Function: Electrical & Instrument Engineer

6 of 5

Action / Responsibilities:

• Prepare Detail Engineering document (All E&I file device such as panel, tray /ladder, junction box, single line, schematic diagram, I/O, termination) to client

• Plan and Estimation Detail Engineering Document (MTO,E&I drawing, installation detail, loop, block diagram, logic diagram, cause effect matrix, ITR, and other support file engineering )

• Check and review drawing / P&ID, estimate as actual drawing.

• Calculation, design and review all E&I Detail Engineering Document ( E&I device, cable schedule, MCT, routed )

Duration: 01July 2012 – 01 September 2012

6. PETRUS INDONESIA

PROJECT :

a. Relocation PLTD power plant 10.5kv Sei Raya Pontianak, West Kalimantan Function: Electrical & Instrument Engineer

Action / Responsibilities:

• Prepare Detail Engineering document (All E&I file device such as panel, tray /ladder, junction box, single line, schematic diagram, I/O, termination) to client

• Plan and Estimation Detail Engineering Document (MTO,E&I drawing, ITR )

• Check and review drawing / P&ID, estimate as actual drawing.

• Calculation, design and review all E&I Detail Engineering Document ( Power and Air consumption, E&I device, cable schedule, MCT, routed )

• FAT/ SAT and Start-up of various Instrumentation and electrical, performed punch list and pre-commissioning.

• Inspection for all instrument device in calibration, frame/support equipment material specification, data sheet and vendor Calibration data .

• Variety work like installing and function tested, witness instrument device, line hook up, loop checked.

• Prepare pre –commissioning / commissioning and Start-up.

• Supervision and check / review actual E&I installing in the module

• Prepared/setting actual E&I panel & switchgear l in the module Duration: 01 January 2012 – 01 June 2012

7. MIDONG E&C Co Ltd, South Korea Company

PROJECT :

a. South Steel Project Jizan Economic Centre ( STX site area ) at Saudi Arabia Function: Electrical & Instrument Engineer

Action / Responsibilities:

• Design and create Electrical Cable Routing, cable ladder/tray, cable ladder/tray support, and all E&I Equipment.

• Design Lighting Calculation, Lighting & Small Power - Location Layout & Cable Block Diagram, Lighting Fixtures Installation Detail, Normal Lighting Panel Layout, Emergency Lighting Panel Layout

• Design Electrical Cable Tray Layout, Cable Tray & Ladder, Mv & Lv Cable Installation Details, Cable Ladder and Tray Support.

• Design Grounding & Bonding Layout & Details.

• Design Cable Schedule, Cable Routing Drawing, Interconnection Diagram.

• Develop project details from ideas and/or specification involved by engineers using specification, sketches, and engineering theory in solving problem. 7 of 5

• At Detailing Office performances studies, review of project drawing, prepare material take of (MTO) for purchase material

• Produce Plan and Detail Shop drawing base on specification, design, and engineering standard using AutoCAD software.

• Responsibility progress daily & weekly report

Duration: 01 December 2010 – 27 November 2011

8. PT. MEGARON SEMESTA BATAM (WASCO GROUP)

PROJECT :

a. Gas Sweetening Package Amine & LNG Project ( Gasuma ) b. Pluto Project ( Violia / FWW )

c. Usan Project for Water Treatment ( Violia / FWW ) d. Condensate Gajah Baru Project (Seipem / primeir oil ) e. E-house Jubilee Project for FPSO (Modec / Simens ) f. E-house OYO Project for FPSO ( Bumi Armada Berhad / Simens ) g. E-house TGT Project for FPSO ( Bumi Armada Berhad / Simens ) h. E-house Petrobras-55 for FPSO ( Quip / Simens ). Function: Electrical & Instrument Engineer

Action / Responsibilities:

• Prepare / Design Detail Engineering document (All E&I device such as panel, tray

/ladder, junction box, cable routed, Data Sheet. )

• Plan and Estimation Detail Engineering Document (MTO,E&I drawing, ITR )

• Check and review drawing / P&ID, estimate as actual drawing.

• Calculation and review all E&I Detail Engineering Document ( Power and Air consumption, E&I device, cable schedule, MCT)

• FAT/ SAT and Start-up of various Instrumentation and electrical, performed punch list and pre-commissioning.

• Inspection for all instrument device in calibration, frame/support equipment material specific ation, data sheet and vendor Calibration data .

• Variety work like installing and function tested, witness instrument device, line hook up, loop checked.

• Prepare pre –commissioning / commissioning and Start-up.

• Supervision and check / review actual E&I installing in the module Duration: 04 August 2008 – 01 December 2010

9. PT. BANGKIT YAHYA PERKASA

PROJECT :

a. PECIKO 5 Process Platform Project (Total Indonesia) at Nippon Steel Batam, Indonesia b. North Belut C, D Process Platform Project (Conoco Philips Indonesia) at Nippon Steel Batam

Function: Electrical & Instrument Calibration

Action / Responsibilities:

• Material control and calibration Electrical / instrument devices.

• Variety work like installing and function tested, witness instrument device, line hook up, loop checked.

• Prepare pre –commissioning / commissioning and Start-up.

• Record calibration data and deal to Client, QC and Vendor. Duration: 03 April 2008 – 31 July 2008

8 of 5

10. PT. GEOCEAN INDONESIA

DLB KALINDA BARGE

PROJECT :

a. Kalinda Barge Construction Project at CPPI Batam Indonesia Function: Electrician

Action / Responsibilities:

• Work under guidance and supervision of instrument supervision and qualified tradesman on repairing, installing, troubleshooting.

• Calibration and pre-commissioning of electrical and Instrument device.

• Pulling, gland and cable termination of power / control, setting panel, termination, magger and continuity, loop check.

• Installation of cable ladder, conduit, lighting and tray until start-up. Duration: 12 February 2008 - 21 March 2008

11. PT. CITY TRANS UTAMA (CTU)

PROJECT :

a. Poleng Process Platform Project (Sempec/Codeco) at PT Profab Batam Indonesia Function: Electrical & Instrument Engineer

Actions / Responsibilities:

• Reviewed and checking all Electrical drawings as per client requirements.

• Provide mark-up and detail drawings for drafting, and as built drawings.

• Design Lighting & Small Power Plan, Details, and Block Diagram.

• Design Electrical Cable Routing, Cable Schedule, Cable Termination.

• Design Electrical Supports & Field run.

• Design MCT (Multi Cable Transit).

• Provide Inter Discipline Check (IDC) for IFC drawing.

• Checking and finalize all shop & fabrication drawings done by draftsman.

• Manage drawing submission are on schedule.

• Provide and develop MTO based on material, equipment, and bulk quantities against P&ID Single Line Diagram, and AFB/ AFC drawings.

• Provide Procurement Requisition (PR) based client datasheet and MTO data. Duration: 01 May 2007 - 25 October 2007

12. PT. SEMEN BOSOWA BATAM

PROJECT :

a. Cement and mill Processing

Function: Electrical Staff

Action / Responsibilities:

• Preventive and analysis, troubleshooting and commissioning, design and repair industrial process.

• Service and maintenance all electrical and instrument to factory plant or machine unit / sequence.

• Handling problem on conventional, PLC / DCS and automation system, hydraulic and pneumatic.

• Handling new project and modification in Electrical / Instrument Engineer scope.

• Responsibilities to process sequence and machine like (siwartel m/c, forklift, crane, packing plant, grind mill, install power and control cement transport, fan / blower, bucket 9 of 5

motor, MCC, I/O panel, grounding, lighting, weighting, welding, AVR, ATS, genset, MV / LV motor).

• Leader / coordinator technician on job shift schedule. Duration: 19 October 2005 - 23 April 2007

13. PT.CITRA TUBINDO,Tbk BATAM

PROJECT :

a. Pipe oil & gas processing

Function: Electrical & Instrument Technician ( E&I ) Action / Responsibilities:

• Preventive and analysis, troubleshooting and commissioning, design and repair industrial process.

• Services and maintenance all electrical and instrument control/equipment or machine unit/sequence.

• Calibration and Start-up if there are equipment or process abnormally.

• Follow up with production operator.

• Involve in continuous improvement to improve equipment performance

• Check abnormalities in plant and resolve solution.

• Responsibilities to process plant and machine support like El-machines, Install and design panel, calibration Electrical Instrument device, Hydraulic and pneumatic system, Power station (MCC, lighting, recorder, transmitter, thermo control / thermocouple, actuator, switching, AC/DC motor application for pump, blower/fan, cutting, starting, cooling tower, servo. CNC,VSD, chiller, water pump and hydrates) & overhead Crain .

• Complete all maintenance and performance test before handover. Duration: 01 January 1998 - 20 June 2005

14. PT. Palma Shipyard Indonesia, PT. Eco Green Batam and other company (Free Line Project )

I state that the information given by is true and correct, thank you for your kind attention. Yours faithfully

( TEUKU HAMDI )



Contact this candidate