Post Job Free
Sign in

Field Service Engineer

Location:
Farmington, MI
Salary:
50,000-60,000
Posted:
April 03, 2016

Contact this candidate

Resume:

Salem H. Bashi

**** *. ********** ******

West Bloomfield, MI 48322-1440

248-***-****

act7gr@r.postjobfree.com

Education/Relevant Training

BS in Electrical and Computer Engineer, Wayne State University. Detroit, MI. 1988

Oakland Community College (Auburn Hills), MI 1990

AutoCAD, Robot, and PLC Programming.

Experience and Work History

May 2011 To Present (COMAU/NOVI)

Machine Tool Electrician and Field Service Installation Leader Including, Ford Assembly Plant, Oakville, Canada, Chrysler Truck, Toledo, and Ford Assembly Plant, Kansas City.

Liquid Automation, Nextechو (Durr, Nagel, Comau/ Novi, ABB, Kuka.

Building, wiring, Testing, Debugging, and Trouble-shooting electrical systems including automation, Power-train, Welding, Robotic, Conveyors Industry, Tear-down, Installation. Working closely with l Senior Designers, Programmers, and Control Engineers, and provide technical support

(Human Terrain Analyst Manager, Department of Army/Civilian, Fort Leavenworth, Kansas City.

July 2009- May 2011.

Working with United States Army in U.S.A and Iraq in order to support the U.S.A. missions in Iraq.

BILINGUAL-BI CULTURE ADVISOR AND INTERPRETER /LINGUIST (Arabic/English) OSS,

Fayetteville, NC April 2008-To July 2009.

•Working with American troops in Iraq as an Iraqi BBA at Bucca detention, Iraq.

MACHINE ELECTRICIAN Leader, Tachyon Services (contract), Clinton Township, MI

January 2007 To March 2008

•machine tools electrician, Installation, Trouble-shooting, and Technical support for robotics and automation systems for Kuka Co., Field Service for Kuka at Kansas City (Ford Plant).

CONTROL ENGINEER, The Complete Companies, Lake Orion, MI, November 2006 – May 2007

•Designing, programming, Field service, Auto Cad Detailer using Cad 2006, Debugging, Testing, Writing PLC programming (Mitsubishi, RSLogix 500).

•Able to follow the project from the planning through design, and final installation,

•Reviewing project specification, Assigned to Honda of Canada Project using Mitsubishi Software, and specifications.50% Traveling.

•Design control systems and power generators using AutoCAD 2006

CONTROL Technique Inc., Sterling Heights, MI June 2003 – November 2006

ELECTRICIAN:

Machine tools electrician for robotics and automation systems, Field Service. Pico (Royal Oak, Novi, Oak Park, 8-mile & Hoover) Ford, GM, Chrysler, ABB (Chrysler), Geneses Group (U.S.A. Manufacturing Corp.), Sanyo Machine (Honda), Harry Major (GM, Ford, Saturn).

ELECTRICIAN/ELECTRICAL DETAILER/FIELD SERVICE, MTE GROUPS (contract), WARREN, MI, February 2000 - December 2003

•Working with senior, and project engineers to establish and create a new Electrical, Hydraulic, and Pneumatic, schematics for a new projects.

•Reviewing, and cross-references to Drawings, and made modifications to them.

•Perform Field service electrician. Kuka (Ford), Pico (Royal Oak, Novi).

CONTROL ENGINEER, Cadre Corporation, Madison Hats., MI. April 1999- May 2000

•Wiring, Testing, Trouble-Shooting, Hardware, and software Design.

•Able to follow the project from the planning through the designing, and final installation and Reviewing project Specifications, verifying job meets project specifications and job content.

•Assigned to wastewater treatment For Chrysler project used Device Net system, and 805,808 projects for city of Detroit water department, using SCADA System.

•Work with AME and supplier specialist to enhance existing and develop new standards. Compile justifications for standards and direction changes.

TESTING ENGINEER, ALCOA Fujikura LTD (dynamics Association), Alien Park, and MI. August 1993 – January 1995

•Performing 135% and 115% Load and Short Circuit testing on breadboard wire Harnesses. Expanding knowledge of specifications used in design, testing of harnesses, and components for Ford Corp.

•Responsibilities included condensing data from testing into tables, and labeling test graphs, and Writing tests reports.

•Assist in installing modules, and wire harness into prototype vehicle for development and functional testing.

•Run durability wire harness test at customer plant to verify the design.

TEST ENGINEER, Sterling Technologies Inc. Farmington Hills, MI.1988 - 1993

•Working closely with the senior engineers on product design verifications.

•Designing, Building, prototype, .and product testers for production area.

•Building electronic modules, soldering surface mount components in both lead and lead free environments, validation testing, functional testing and trouble-shooting down to component level.

•Preparation and Implementation of product test procedures, Flash software into modules, test and validate new component, and circuit designs.

•Perform Trouble-Shooting, and Repairing electronics equipment’s.

•Audit test processing for Quality Assurance of Production parts for automotive industry such as Engine Control System, Sensors, and Wiring Harnesses.

•Assist a project team in developing electronics modules for all of the major automotive OEM’s from prototype through production.

•Working extended hours including weekend, and holidays at times as necessary to support product development testing, product launch at customer plants and all project related support functions.



Contact this candidate