o8+ years of experience (4+ years Gulf oil & gas) in the field of Piping/Pipeline and Steel structural supports Fabrication and Erection. Experience in handling of all other construction activities with high Safety & Quality standards.
oWorked on different types of pipe materials (CS, LTCS, SS, SDSS, GRP, GALV) and different type of joints (Welding, Threading, Coupling) Competent in interpreting drawings like Piping (Laying/fabrication), P&ID, Structural (Fabrication/Erection)
oExperience in Shut-down works and tie in works.
PROFESSIONAL EXPERIENCE
AARATHI ENGINEERS
Designation : Project Manager
Projects : MSW PROSSESING UNIT
Client : Neway Engineering MSW pvt. ltd
Period : Oct 2015 to March 2015
JOB RESPONSIBILITIES
oDevelop and maintain project schedule, and budget to ensure project meets initial estimates.
oCoordination and Supervision - Coordinate, manage and monitor the performance of the fabrication team
oMetal Fabrication which includes Welding, Shearing, Sawing, Reading and interpreting Blueprints, shop and design drawings
oObserve safety procedures and report any safety issues
oPerform other duties as assigned
oResource management and Utilization
oPerformance evaluations
oEnsures that all contractual terms and obligations of projects are maintained.
oCoordinate required procurement of materials and tools
BEST SYSTEMS AND SERVICES
Designation : Fabrication Engineer
Projects : Fabrication of Screw conveyers, weigh bridges, Sencor mounting bracket
Period : April 2015 to Oct 2015
JOB RESPONSIBILITIES
oEstimate of the materials and the expenses associated with a project.
oPlan and implement production schedule.
oAssure the quality of the materials before production start.
oResearch about the various materials and vendors in the market.
oMaintain quality and prepare reports for all stages of fabrication.
oMaintain all documents and drawings related projects.
oCarry out project management ensure that project meet leagal guide lines, environmantel directives and H&S requirements.
ADWAR AL-KHALEEJ INT’L. EST.
Designation : Mechanical Engineer
Project 1 : Combined Cycle Power Plant (CCPP)
Contractor : NCC (National Contracting Company)
Client : Daelim construction ltd.
Period : Feb 2013 to July 2013.
Project 2 : GRP Pipeline project
Client : Saudi aramco kurushannia gas plant
Period : July 2013 to Jan 2014.
Project 3 : Sadara Chemical company
Contractor : SISCO construction ltd
Client : LARSEN & TOUBRO ATCO SAUDIA COMPANY LLC
Period : Feb 2014 to Feb 2015.
JOB RESPONSIBILITIES
oPlanning, implementing, coordinating, controlling and monitoring construction activities.
oEstimate and control the manpower and equipments.
oCoordinate with client and site supervisors.
oHandling of materials,supports & valve erection
oReview the drawing and assing work to the supervisor.
oFabrication and Erection of pipe spools and supports
oCoordinating and organizing the materials.
oPreparing associate reports of process.
oMonitoring of work Schedule.
oPreventing time delay in production.
Galfar Engineering & Construction.WLL.Emirates
Designation : Assistant Piping Engineer
Project 1 : EPC for 131-Pig Launcher & Receiver in BAB Oil & Gas Field, Habshan
Client : ADCO (Abudhabi Company for Onshore Oil Operations)
Period : Jan 2010 to July 2010.
Project 2 : Asab Full field Development Project
Contractor : Petrofac International Limited (PIL)
Client : ADCO (Abudhabi Company for Onshore Oil Operations)
Period : July 2010 to Oct 2012.
JOB RESPONSIBILITIES
oTechnical assistance to the senior engineer in planning, implementing, coordinating, controlling and monitoring construction activities.
oStudy the exact scope of work and estimating the required manpower and equipment mobilization.
oCoordinate Site activates with Site Supervisors.
oDocuments Handling- Detailed Plot Plan, GA, P&ID, Piping Layout, Isometrics.
oManaged the proper erection of pipe rack &pipe, supports in filed installation
oHandling of materials,supports & valve erection
oPlanning in workshop regarding job(PQR) and progress
oMonitoring the work progress to go in line with the QC
oProducing of As built approved for final document submission
SHUTDOWN RESPONSIBILITIES:
oPreparation of Tie-in work packs for shut down.
oPreparation of Isolation spade List with Contractor
oCoordinating the Pre Tie-in Activities such as Isolation, Venting, Draining, Purging, Mud Plug size Identification & Preparation etc
oSegregation of Valve, Flanges, Gaskets, Fasteners(Tie-in Point vise)
oShifting the Fabricated Pipe spools (After Radiography Clearance) from Workshop to the job Location.
oCarry out the UT Survey of Existing Piping for all weld type Tie-in’s
oMaintaining the Spading/De-Spading Log at work Location
oIdentifying & Trained the Fabricator/Fitter for operating the Cold cutting Machine & Beveling Machine.
oOrganizing the Sand Blasting, PWHT, Radiography activities after Tie-in welding
Dynamic Engineering Pvt. Ltd., Kalpakkam, India.
Designation : Piping Supervisor
Project 1 : Intermediate Transfer Facility Incell Piping at WIP
Contractor : Sakthi Hi-tech Constructions Pvt Ltd.
Client : Nuclear Recycle Group Projects (NRGP), Kalpakkam. (Govt of INDIA)
Period : May 2008 to Nov 2008.
Project 2 : Chilled Water Pipeline.
Client : Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam.
(Government of INDIA)
Period : Nov 2008 to Jan 2009.
Project 3 : Project for Sodium Pipeline/ Prototype Fast Breader Reactor (PFBR).
Contractor : Walchandnagar industries Ltd. (WIL)
Client : Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI)
Period : Jan 2009 to Nov 2009.
JOB RESPONSIBILITIES
oReview of preparing Isometric drawing
oFabrication and Erection of pipe spools and supports
oCoordinating and organizing the materials, machineries
oPreparing associate reports of process
oEnsuring Production as per Plan.
oMonitoring of work Schedule.
oPreventing time delay in production
oGiving guidelines to workers.
oIn process checking / inspection at appropriate stages as identified in the quality Assurance plan,
oPlan and execute the job as per safety rules.
oPreparing Pipe Support drawings and Pipe line as built Drawing.
EDUCATIONAL PROFILE
Discipline : Diploma in Mechanical Engineering
Institution : AVC Polytechnic College, Mannapandal, Mayiladuthurai.
Year of passing : 2008
Discipline : Higher Secondary School (Science)
Institution : Kittapa Municipal Higher Secondary School, Mayiladuthurai.
Year of passing : 2006
PROJECT WORK
Title : Fabrication and testing of friction stir welding components
Period : Six months
Project year : 2008
Tool used : Vertical milling machine
Description : The specification of welding - No filler material in welding The friction stir welding is used to good quality & it’s stir welding user friendly.
TECHNICAL QUALIFICATION
ASNT Level II in Radiographic Testing.
ASNT Level II in Ultrasonic Testing.
ASNT Level II in Magnetic Particle Testing.
ASNT Level II in Die Penetrate Testing.
COMPUTER SKILLS
oPackage : MS-OFFICE.
oOperating Systems : WINDOWS XP, WINDOWS 7
oTools : AUTO CAD R 2008.
TRAININGS
oADCO Electronic Permit to work, E PTW (Emirates ERM)
oTask risk assessment and risk management ( TUV)
oBasic first aid
oBasic Fire Fighting
oH2S / Breathing Apparatus
PASS PORT DETAILS:
oPass Port No : H6414099
oPlace of Issue : Tiruchirappalli
oDate of Issue : 15-09-2009
oDate of Expiry :14-09-2019
PERSONAL PROFILE
Father’s Name : M. Radha Krishnan
Date of birth : 14-11-1988
Sex : Male
Nationality : Indian
Linguistic Ability : Tamil, English, Hindi, Malayalam.
Hobbies : Internet Browsing, Playing chess
Permanent address : 22/10 Kavarai Street, Kornadu,
Mayiladuthurai- 609002,
Nagapattinam District,
Tamilnadu.
DECLARATION
I hereby confirm that the information given above is true to the best of my knowledge.
Place: Kanchipuram Yours faithfully,
Date :