Post Job Free

Resume

Sign in

Manager Project

Location:
Carrollton, TX
Posted:
March 27, 2016

Contact this candidate

Resume:

Cell: 469-***-**** **** Pawnee Trail

act311@r.postjobfree.com Carrollton, Texas 75007

Core Objectives

Safety – Establish Safety goals and implementation plans that help to better serve our team members, clients and our company. Develop a culture of Safety so that our team members return home safe each day. Quality – Develop a culture of quality. Train our team members to consider the value of quality and maintain our role as quality manager throughout the project. The quality of the project lives on, when we leave the job. Service to Others – I serve our teams to allow them to achieve the best results. In doing this, a culture is developed that carries forth to our team members and clients.

Project Experience:

Dallas Area Rapid Transit – Dallas, TX 2014-2015

As the Senior Quality Control Manager, on this $6,000,000 project, I performed Daily QC inspections, documented deficiencies, and ensured all quality, and Specifications were met. Provided Daily and Next Day Look Ahead Reports... Conducted Daily Environmental Inspection and Provided DART with Environmental SWPPP Weekly Reports. Provided Monthly Quality Control Test Reports on Concrete, Soils, Welds, Compaction/Density. Developed Surveillance Reports and Resolution on any Quality Issues. Conducted Preparatory Meetings with Subcontractors. Conducted External and Internal Audits. Maintained As- Builts

.

114/121 Airport Connector (Over $500 Million Project Quality Contrail Inspector)

Performed Daily QC Inspection, consisting Concrete Testing, Paving, Reinforced Steel, Welds, Walls, Soils, Earthwork Compaction. Conducted Audits on Specification Samples from Concrete Mix Plants, and Quarrels. Conducted Daily Surveillance to ensure Specification, and Plan Design were Adhered to by Sub-Contractors, and Provided Daily QC Reports. In additions, Performed Safety Inspection per OSHA and Client Requirements.

Cell: 214-***-**** 1115 Pawnee Trail

Superintendent, Quality

Control, Safety Manager

Years of Experience: 20

Military Service:

US Navy 1964-1974

UDT 11 1965-1966

Navy Seal 1966-1974

Education:

Bachelor of Business Admin.

University of Texas – Austin

Cisco Jr. College AAB-Cisco,

TX

Heritage College-Master

Hospitality Administration

Michigan State University

Texas A&M University

US Army Corps of Engineers

Employment:

Herzog Contracting Corp

P.O. box 1089

St. Joseph, MO 64507

2014–present

PSI

4087 Shilling Way

Dallas, TX 75237

2010-2014

Walton Construction

Kansas City, Texas

I am a person of high moral character, with over 30 years of experience in the construction industry. As a manager, I am responsible for supporting our Project teams in organizing, planning, scheduling, to achieve the goals of safety, quality, timeliness, and customer service. I seek to obtain the highest level of quality, while maintaining cost and budget. I represent the company with the client, architect, engineers, suppliers, contractors and subcontractors.

Russ Maples

act311@r.postjobfree.com Carrollton, TX 75007

US Navy Facilities Joint Air Traffic Control Facility - Fort Worth, TX Quality Control manager, on this $11 million dollar project. I coordinated the quality control for the new radar antenna installation. I worked closely with the Construction team, and achieved timely completion with zero deficiencies. US Navy Joint Multi-Level Parking Facility - Fort Worth, TX As the Quality Control manager on this $2.5 million dollar project, I coordinated the overall quality with the Navy and the Construction team. This was a precast integral color structure. The project completed on time, zero accidents, zero unresolved deficiencies.

US Navy Facilities 8th Marine Admin Building – Fort Worth, TX As Quality Control Manager, on this $8 million dollar project, I managed the QC process to help deliver this 2 story concrete tilt wall structure with a thin brick veneer cast into the panels. The project was delivered on time, all deficiencies resolved, accident free. Cox Communication Facility - Rancho Santa Margarita, Long Beach, CA

Superintendent, Quality Control, Safety, Field Project Manager: Two Fiber Optic. Re-Gen. Stations. Projects $5 million dollar each. Planned production schedule with Sub-Contractors, Ensured specification & Quality Control maintained, Conducted & Planned Safety Procedures, Conducted Inspections, Negotiated bids for contracts. Responsible for environmental controls and reports. Provided Owner with monthly schedule, and deficiency resolution reports. First Baptist Church - Midlothian, TX

Ground-Up 500 Seat sanitary with 900 Car Parking Lot. $8 Million Project.

Superintendent and Field Project Manager in Addition, Responsible for Quality Assurance, and Safety. Established Weekly Schedule for Sub-Contractors. Conducted weekly Quality Assurance, Safety, and Schedule Timeline Meeting with Sub- contractors. Weekly Client meeting with Directors of First Baptist Church to review Schedule, Quality, Safety, and Environmental issues, US Cellular Facility – Warsaw, NC

As the Superintendent of this $5 million dollar 8,000 Sq. Ft facility, responsible for Sub- Contractor scheduling, Quality Assurance, and Safety. In Addition, responsible for SWPPP Environmental Controls. Conducted weekly staff meetings with sub- contractors. Responsible for daily and weekly tool box meetings. Broadwing Communication – Austin, TX

I was Superintendent, QC and Safety Manager on this 20,000sf clean room with redundant power and mechanical systems. The project was completed accident free, on- schedule and within budget constraints. $10 million dollar project. WorldCom / MCI Facility – Knoxville, TN

Walton Construction

Kansas City, Mo

2006-2010

Patterson & Dewar’s

Engineers

Norcross, GA

2005-2006

Integrated Builders

Dallas, TX

2004-2005

Teng Architects &

Engineers

Chicago, IL

2000-2004

CF Jordan Construction

Dallas, TX

1995 - 2000

Certifications and

Training

Performed as project Superintendent, Quality Control and Safety Manager I delivered this $10-million dollar facility accident free, and on time. This Faculty was 20,000 sq. ft. Clean-Room.

AT&T Buildings – California, Oregon, Washington, Colorado, Montana. This project had 40 Fiber Optic, and Re-Generation sites. I served as Superintendent, Safety and Quality Control Manager. The project completed accident free, on schedule and within budget.

Fort Hood Boiler Room & Medical Facility – Fort Hood, TX As Superintendent on this USACOE $10 million dollar mechanical project I was responsible for QC Inspection, and Environmental Controls. Weekly Meetings with Sub-Contractors to ensure deadlines are met. Safety manager, Daily and Weekly Inspection of Safety Procedures.

Fort Sam Houston Base Medical Facility – Fort Sam Houston, TX

$8 million dollar, As QC Manager I was responsible for ensuring that the project was delivered within the COE guidelines and contract requirements. Fort Riley Base Dental Facility – Fort Riley, KS

$7 million dollar, 15,000 sf medical building. As QC Manager I was responsible for ensuring that the project was delivered within the COE guidelines and contract requirements.

Wyndam Garden Hotel Tennant Finish - Dallas, TX

I functioned as the project Superintendent completing this 7 story hotel finish out.

$ 8.5 Million Scope included painting, wall coverings, floor coverings, furniture installation, and special architectural features.

Additional projects have been completed including, schools, banks, hotels, restaurants and communications buildings.

Cell: 214-***-**** 1115 Pawnee Trail

act311@r.postjobfree.com Carrollton, TX 75007

REFERENCES

Lloyd Faver, Senior Manager

Burns & McDonnell

817-***-****

act311@r.postjobfree.com

Jack Rahmes, Sr. Project Manager

Herzog Corporation

904-***-****

Email: act311@r.postjobfree.com

Winnie Aelfellor, QC Manager

Herzog Corporation

678-***-****

Email: act311@r.postjobfree.com

Nate Morgan, Sr. Project Manager

Dallas Area Rapid Transit

469-***-****

Email: act311@r.postjobfree.com

Ken Niles, Engineer

Herzog Corporation

682-***-****

Email: act311@r.postjobfree.com

Russ Maples



Contact this candidate