D.V.RAMA MOHAN
Flat no ***, G.K.TOWERS, Ramalayam veedhi,
Patamata lanka,Vijayawada-10
ANDHRAPRADESH, INDIA
Mail: ***************@*****.***
****************@*****.***
Mobile (India): +91-970*******
Liberia: +231-*********
Date of birth: 12-08-1970
PASSPORT NO: H8858274
CAREER OBJECTIVE
To work in an organization which gives ample opportunity to learn and grow along with the organization and to prove myself worthy of shouldering the responsibilities assigned to me and meeting challenges.
Looking to lead a Team in providing Quantity Surveying Services, Project Management and Contract Administration in MNC/EPC Projects
EDUCATIONAL QUALIFICATION
BE ( Civil) - 2008
DIPLOMA IN CIVIL ENGINEERING - 1990
AUTOCAD 2002
3D STUDIO MAX/VIZ
MSP
CERTIFICATE COURSES:
Port planning and development.
Special repairs to works pertains to marine structure, viz; Berths, Break waters,
Crane tracks, Fenders and fixtures.
Current trends in concrete technology.
TRAININGS:
ISO 9001, EMS 14001, OHASH 18001 and ISPS.
Cracks & leakages in civil engineering structures.
PROFESSIONAL SUMMARY:
24 Years of Rich Experience in Project Management, Contract Management, Quantity Surveying Skills in MNC/EPC Projects of Hospitals, Mass Housing projects, IT Parks, multistoried Buildings, STPs, WTPs, Marine structures (Berths, jetties and Quay walls), Dredging, Cultural and sports complexes, Plumbing, Interior works, Facade works, Roads, piling, Crane tracks, Stock yards, Transit sheds and Preparation of estimates, rate analysis planning, scheduling, extra items, escalation and drawings, maintenance of Hospitals, Quarters, Berths, Jetties and Bungalow.
Specialties: Consistent Learner and Cool team player with ability to take pressures and passion to
Satisfy both internal and External Customers with Ethics, Hard Working and Committed
Nature...
.
At present I am working with TECHNOFAB ENGINEERING LTD.
Present working location : Monrovia, Liberia (West Africa)
Designation : Sr. Manager (Projects)
Client : IIU/Public works Department.
Monitoring consultant : SEAMAR & ROCHE JV, France & Canada.
Project : Construction of a new fuel unloading facilities at the Free Port of
Monrovia, Liberia. (EPC work)
Project Scope:
ACCESS TRESTLE - 500 m IN LENGTH HAVING 32 no. of BENTS, 46 no. of VERTICAL PILES
36 no. of RAKER PILES DIA PILE = 660 mm (Steel Pile)
PUMP HOUSE - 1 no. SITUATED AT 50 m away from the unloading platform, 4 no. of
VERTICAL PILES DIA of PILE = 660 mm (Steel Pile)
UNLOADING PLATFORM -1 NO. (SIZE = 20 m x 15 m) 14 no. OF VERTICAL PILES
DIA OF PILE = 660 mm (Steel Piles)
BREASTING DOLPHINS - 2 no. (EACH = 8.50 m x 8 m), 10 no. of RAKER PILES / EACH
BREASTING DOLPHIN, DIA = 914 mm ( Steel Pile)
MOORING DOLPHINS - 2 NO. (EACH = 6 m x 6 m) 8 no of RAKER PILES /EACH MOORING
DOLPHIN DIA = 660 mm ( Steel Piles)
MARINE FURNITURE
FENDERS - 2 NO.
QUICK RELEASE MOORING HOOK - 2 NO. (2 – 60 T HOOK FOR BD)
QUICK RELEASE MOORING HOOK - 2 NO. (3 – 60 T HOOK FOR MD)
STAINLESS STEEL LADDERS - 6 NO.
PEDESTAL CRANE - 1 NO. (UNLOADING PLATFORM)
CATWALKS FOR WALKWAY - 2 NO. (EACH BETWEEN BD & ULP)
Product pipeline system: The pipeline system will consist of 3 product pipelines on a rack:
12” pipeline for diesel;
10” pipeline for gasoline;
8” pipeline for jet A1fuel and kerosene.
Each pipeline shall be equipped with pressure indicator and check and gate valves to prevent backflow. Emergency valves will be included for closing the system in case of an emergency.
Loading hoses : Three hoses, each of about 25m length, are required to connect the vessel’s manifold with the pipelines.
Utility Pipe Lines
One 3” Carbon Steel Pipe Line For Spillage
One 2” Carbon Steel Pipe Line For Nitrogen
One 2” Carbon Steel Pipe Line For Fresh Water (Non Potable)
One 12” Carbon Steel Pipe Line For Fire Water From Pump House To The Platform Only.,
Responsibilities:
Continuously monitoring site activities cost and performance, overview situations
making careful detailed plans, priorities and delegate tasks, working as part of a team, ability to compile & analyze Key Performance Indicators.
Negotiating contracts, Estimating and pricing, solving Problem, Networking and attending weekly and monthly technical meetings with client and consultants.
Coordinating with the Soil investigation team and completing the work and forwarding the soil reports to MC/ Client for approval and after approval sending to the Designers for preparing designs, maintaining the Design Basis Register.
Preparing, submitting and taking approval for methods statements and work schedule from consultants.
Inspecting the site and collecting necessary information and sending to HO, to assist in tendering and attending pre bid meetings for tendering for new works.
Preparing monthly bills and submitting to consultant to approval and continuously monitoring until the bill pass and reach to HO.
1. KCP Projects Ltd. Hyderabad. From May 2012 to Jan 2013
Designation: Sr. Project Manager
Project: Construction of 300 Bedded Hospital at kandivili, Mumbai. (Project Value Rs 220 Crs)
Client: ESIC (Employees State Insurance Corporation) and
UPRNN (Uttar Pradesh Rajkiya Nirman Nigam Ltd)
Project Details: Basement+ Ground floor+ 6 floors (3, 20,000 Sft), Inpatients, OPD, Causality,
Blood Bank, Labs, OTs and other modern facilities.
Construction of STP 225 KLD, ETP 25 KLD and 32 KVA Electrical substations.
2. Worked with RAMKY GROUP from FEB 2008 to till APR 2012
(APR Projects (2008 to 2011) and
RAMKY engineering and consultancy services, Gabon, West Africa From (2011 to 2012))
Designation: Manager Projects.
a) Providing 90 Kv DC transmission line and substation for SEZ. GABON.
As a Manager- projects, 2011 to 2012
b) Project: Development of infrastructure for Special economic zone (Construction of Admin
building, entrance plaza, training center, first aid center, guest house, roads), EPC work.
As a Manager- projects, 2011 to 2012
c) Construction of houses (mass housing (3024 houses)) for tsunami effected area in
Ramanathpuram, Tamilnadu, India. As a Manager Projects, 2010 to march 2011
d) Construction of G+3 buildings (11 packages, consisting of 130 blocks, 4192 Flats) in Vijayawada,
Andhrapradesh, India. As a Associate Manager, 2009 to 2010.
e) Construction of RAMKY corporate office cum IT park (LB+UB+GF+12 floors), (PT slabs),
in Hyderabad, Andhrapradesh, India. As a Construction Manager, 2008 to 2009
3. SPENCON SEVICES – TANZANIA (EAST AFRICA), (www.spencon.in)
Designation: Site engineer, FEB 2006 to Jan 2008
Project : Rehabilitation and up grading of the existing Supply system(construction of 104 MLD water filters, chemical building, Dirty wash water tank, Lagoons, in take chamber, pumping station, pipe lines dia 1100, 600, 300, 200),Mwanza, Tanzania.
Client : Mwanza urban water supply and sewerage Authority.
Consultant : C.LOTTI & ASSOCIATI (Italy) in association With GKH Consultant (Germany)
Prime Contractor: Degremont (France)
Contractor : Spencon services Ltd,. Tanzania (All civil works) (JV)
4. Visakhapatnam Port Trust, (www.vizagport.com) ( Under Ministry of shipping and Transport)
(ISO 9001, EMS 14001, OHASH 18001), Visakhapatnam, India.
Designation : Overseer (Jr. Eng civil), FEB 1992 to Jan 2006.
Projects:
a.Construction of Indoor Stadium with a seating capacity of 3000 Nos. at Sports and Cultural Complex of Visakhapatnam Port Trust.
b.Construction of Auditorium with a sitting capacity of 1400 Nos. at Sports and Cultural Complex of Visakhapatnam Port Trust, Visakhapatnam.
c. Construction of Open Air Theatre with a sitting capacity of 500 Nos. at Sports and Cultural
Complex of Visakhapatnam Port Trust, Visakhapatnam.
d.Construction of Jetty for ONGC Vessels at fishing harbor of Visakhapatnam.( Marine piles)
e.Construction of Jetty for small oil tankers and barges at northwestern arm at inner harbor. ( cribs)
f.Construction of retaining wall(diaphragm wall, anchor diaphragm) for shore protection at West Quay end in inner harbor of Visakhapatnam Port Trust (Retaining walls constructed method is RMC), and dredging up to -10.6
g.Surveying, designing, erecting, testing and commencing of dust suppression in cargo
handling areas of Visakhapatnam port Trust (by sprinkling water)
h. Construction of pump houses, Electrical substations and Maintenance offices
i.Providing stack yards and connecting roads at container yard of Visakhapatnam Port Trust
j.Providing crane track to 20 MT capacity duty cranes at East Quay No 7 of visakhapatnam Port Trust
k.Preparing estimates and relevant drawings for Multistoried Building, berths, jetties, Roads
and dredging.
h.Experience in maintenance of Bungalows, Multistoried buildings, Berths, jetties.
m.Experience in preparation of 3D Elevations of multistoried structures.
n.Experience in preparing schedules and special conditions for tender papers.
STRENGTHS:
Hardworking
Confident and Competent
Dedicated and Sincere
Innovative and good team player.
Strong interpersonal skills and Good Communicative.
Key Result Areas:
Successful execution and completion of the project within budgeted cost and time frame.
Technically correct project execution.
Safety at site and quality of work.
Confidentiality in required areas of operations.
MIS and project statistical data
Professional integrity, loyalty, dedication and commitment to organizational goals.
Customer Satisfaction.
(D.V.Rama Mohan)