Manufacturing professional with 12 years of professional experience. Experience is a combination of Production Management, Facility Management, and Manufacturing Engineering. Successful implementation of various processes that coincide with Lean Manufacturing Best Practices. Strong ability to think outside the box and improve processes by seeking factual data about the constraints and developing a team of people to attack those areas of concern. Driven by high standards to improve manufacturing processes through innovative and creative thinking.
Experience
Aug. 2013- Dec. 2015 J-tec Industries, Inc. East Peoria, IL
Facility/General Manager
Reduce customer lead times by 58% by implementing schedules and best practices resulting in 28% growth in Sales and Revenues within the first year with the company
Drastically improved Quality defects by 76.2% by design and implementation of Quality Program and Processes
Designed and implemented Inventory Strategy and material replenishment strategy for the business. Implemented scheduling process when I was told there was no possible way.
Increased manpower 55% due to demand analysis and sales forecast. Areas of increase consisted of several Department Heads, Engineers, production associates and complete restructure of the organization.
Research and Capacity planning resulted in various Capital Purchases which included acquiring (2) 80,000 sq ft Facilities, new production saw, new laser, and machining center.
Successful purchase of two new facilities in a 2 year time frame. Led the transition and move to 2 new facilities and continuously maintaining services on time. Managed all the maintenance schedule, projects, and strategy to meet the scheduled time frame.
Responsibilities consisted of managing of Production, Inventory, Purchasing, Processing and Quality.
Strict and Detailed negotiations between vendors and suppliers. Hold vendors accountable to ensure they met their delivery schedule and if they did not professionally discuss options and recovery plans.
Nov. 2009- Aug. 2013 Caterpillar Inc. East Peoria, IL
Section Manager NN Subs Assembly
Drastically improved RIF by 83.3% by various process changes. Development of SWAT team to identify and approach various areas of concern. Changed tooling and added fixtures to support better ergonomics in the work center.
Dramatic 78% improvement of generating ideas per employee utilizing the CI Card Process (Continuous Improvement).
Dramatically improved and maintained on time delivery performance from 73% to 98% consecutively for 3 years. Success was driven by restructuring 12 of 13 work centers within the Value Stream
Slashed quality defects by 133% by restructuring the standard work and redefining processes
Reduce manpower by 38% by conducting demand analysis and restructuring individual work centers
100% on time delivery of all RCCA to the customer or value streams within the organization
Gold Status ISO Certification for 4 consecutive years
Power User for SAP/VPPA deployment throughout the Value Stream
Scored highest in East Peoria Campus on the Employee Opinion Survey. The survey is based on how your employees view you as their leader; strongest score was employee engagement
Nov.2009 and 2013 Caterpillar Inc. East Peoria, IL
Manufacturing Engineer of NN Sub Assembly
Team lead of Standard Work Project throughout the Value Stream. Successful at rewriting 3112 standard work operations, resulting in 133% decrease in quality defects.
CPS Support- Lead Manufacturing Engineering Qualifications
98% on time delivery with all NPI process development and production
Successfully added and redefined 3112 individual visual aid for assembly adding to the 133% reduction in quality defects.
Facilitate several layout changes/ Kaizen Events and developed the scope of work, wrote Capital or Expense budget for the project, and developed project plan for the layout changes.
Develop and manage all documented operations for the Value Stream
June 2009 Caterpillar Inc. East Peoria, IL
Section Manager Building SS
Managed Secondary Attach, Pipelayer, Paint, Black Iron, Touch Up, Decal, and Shipping Floor
Improve throughput 78% on the Black Iron Line by process improvements and combining processes
Reduction of Manpower on the Black Iron Line by allocating employees from other value streams with lower demand to share responsibilities between value streams
Reduction of quality on the Black Iron Line by 96.29% utilizing Stop-to-Fix practices
Reduction of defects by 83.3% on the paint line by providing additional training and adding a Quality Team Lead to the area to identify constraints.
6 Sigma Green Belt
CPS Green Belt
May 2005 Caterpillar Inc. East Peoria, IL
Shipping Floor Section Manager
Led transition between Keen Transport and Caterpillar Building SS Shipping Floor
Managed all hourly employees securing loads to rail cars or tractor trailers
Printed bill of lading and packing lists.
Scheduled shipments via rail and truck.
Compliance with all state and federal regulations
Education
Aug 2003 Illinois Central College East Peoria, IL
Studied Fire Science Technology and EMT
Aug 2007- 2008 Robert Morris University Peoria, IL
Studied Business Administration
Working with School to reenroll to finish my dual program for Bachelors/ Masters Degree
Interests
Success, teamwork, commitment, family, traveling, hunting and sports
Skills
The below skill I have obtained and consistently work to improve daily:
Provide Constructive Feedback
Listen Attentively
Negotiate Situations effectively
Motivate Others
Identify problems & develop solutions
Execute multiple tasks at once
Identify and allocate resources appropriately
Sets organization goals
Strong planning skills
Microsoft, VPPA, SAP, Project, Visio, CAPP +, Team Center Visualization Mock Up, E2, HVC, AIMS, AutoCAD, and Pro E