Post Job Free
Sign in

Green Belt Six Sigma, Green Belt Lean Manufacturing

Location:
Chicago, IL
Posted:
March 21, 2016

Contact this candidate

Resume:

JEYA CHANDRU ARUNAGIRI

312-***-**** *************@*****.*** *******@***.***

**** ***** ****** ******, *** No 807, Chicago, Illinois 60607 PROFESSIONAL SUMMARY

Graduate Industrial Engineering Student with professional experience in automotive environment, demonstrated work record in Lean, Continuous Improvement & Quality Control possessing analytical abilities and technical skills with solid acuity. WORK EXPERIENCE

Quality Engineering Intern, Electro-Motive Diesel, A Caterpillar Company, LaGrange, Illinois June 2015 – August 2015

Improved the Engine Line working efficiency by implementing hourly employee trainee on ETQ in action

Preventing the Material component loss in Turbo Line by introducing new Quality Check Gate tracking material flow

Identified the quality issues on Engine top deck covers by root cause analysis and proposed new work instructions

Analyzed the data and problems in Customer warranty by DMAIC and provided corrective action on the shop floor

Ameliorated quality check of incoming materials through PPAP and created Check sheets to ensure quality in future

Collaborated with multi-disciplinary engineering team implementing Lean techniques which reduced 26% of waste Industrial Engineer, Aruna Mill Stores, Tuticorin, India June 2013 – July 2014

Liaised with new 20 industries and acquired several new clientele for the company by Just In Time (JIT) delivery

Focused on customer retention and the satisfaction index by providing reliable services implementing the 5S, continuous improvement and Kanban in the business following ISO 9001/14001 compliances

Utilizing value streams mapping to eliminate waste, reduce cost and improve inefficiencies analyzing the root causes

Facilitate weekly meetings with staffs regarding Quality, Supply Chain and Logistics, Finance and Maintenance

Achieved an exceptional turnover in the sales by cost cutting which increased to an annual profit of $30K

Developing Process documents, Managing budgets, supervising and monitoring employees and safety requirements Student Intern, Bharat Earth Movers Limited, Bangalore, India May 2012 – June 2012 Training on methods of lean six sigma quality and continuous improvement process in powertrain unit. Trainee, Engine Fault Diagnosis and Repairing Unit, Beau Hyundai Motors, Tuticorin, India May 2011 Learned the methods for identifying faults in various automotive engines and its counter action measures. SOFTWARES & SKILLS: -

AutoCAD, SOLIDWORKS, ANSYS, Minitab, SAP, ETQ, Material Flow, Time Study, Operations Management, Optimization, Gauge R&R, XL- Miner, FMEA, KANBAN, Root Cause Analysis, Control Chart, Value Stream Mapping, DMAIC, 5S, 8D, QMS, APQP, PPAP, EDUCATION

The University of Illinois at Chicago (UIC) Expected May 2016 Master of Science in Industrial Engineering GPA: 3.5/4.0 Coursework: Supply Chain Management, Ergonomics and Human Factors, Advancements in Additive Manufacturing and 3d Printing, Quality Control and Reliability, Production Planning and Inventory Control, Plant Layout and Material Handling, Introduction to Operation Management, Time Series analysis and Forecasting, Data Mining of Machine Health Analysis and Prognostics

Certified as “ Greenbelt in Lean Manufacturing & Six Sigma Quality” from Institute of Industrial Engineers

TamilNadu College of Engineering, Anna University, India. May 2013 Bachelor of Engineering in Automobile Engineering GPA: 8.4/10 PROJECT LEAD EXPERIENCE

Supply Chain Demand Forecasting and Plant allocation were completed for souvenir based company “Chennai Gaga”

ARIMA forecasting method is finalized for minimization of error to 4% compared to other methods and suitable location is suggested for their new plant which was approved by the company Design and fabrication of human femur bone using 3D Printing technique in Additive Manufacturing

Human bone is designed using SOLIDWORKS and printed as a 3D model using the material ABS plastic Plant Layout Optimization of Automobile Warehouse by designing the material flow process & multi-storage systems

BMW warehouse is taken as a case and increased the storage capacity of 214 car bodies to 320 car bodies in inventory Productivity Improvement and Process Optimization in Surface Mounting Line for a Manufacturing Company in Illinois

Time Study is done to identify the bottleneck in process, reducing cycle time and total cost by proposing new solution LEADERSHIP POSITIONS

Student Chairman, Automobile Department, Tamil Nadu College of Engineering, India June 2012 – May 2013



Contact this candidate