Robert (Bob) M. Turner
Houston, Texas 77084
Cell: 281-***-****
Email:************@*****.***
Objective
Challenging and rewarding position as a Product Manager / Supply Chain / Purchasing Manager
Professional Profile
Perform well in high volume / high stress environment
Strong analytical and problem solving skills
Accomplished negotiating skills
Developer of metrics and reporting processes
Business Process mentor
Programs and Processes Implemented
Sarbanes-Oxley (SOX) compliancy * ISO 9000 Implantation * API Implantation * JIT / Kitting System
API / NACE compliancy * Vendor Partnering Programs * TAX Exemption Monitoring
Material Master Development * Vendor Master Development * RTMS Rental Software
MRP Implantation of SAP, CA-PRMS, Martin Marietta, and ASK-MAN MAN Systems
FILEMAKER-PRO software development of Purchasing, Manufacturing, & Stores Modules
Professional Experience
CANRIG Drilling Technology LTD 02/01/2012 – 02/05/2015
Magnolia, Texas
Sourcing Specialist-Mechanical / Fab
Primary Challenge: Develop a vendor base to support the manufacturing efforts of the land based drilling equipment for NABORS drilling contracts.
Results / Accomplishments
Qualified numerous vendors with the capacity and quality performance to support the new design AC Top Drive Drilling System. (PACE-X PROJECT)
Overseen all purchasing contracts and coordinated engineering design efforts to launch the procurement phase of the project.
Produce 45 complete drilling system in the two year period.
Develop a vendor base that has the capability of machining the close tolerance Components needed to support the production of top drive drilling rig components
Manage and coordinate the fabrication of Power Houses / Drillers Cabins
Oversee the reporting of cost saving efforts, track quality and reject activity and resolve issues as needed.
Cameron Drilling Manifold Division 07/01/2010 – 01/01/2012
Houston, Texas
Procurement Specialist
Primary Challenge / Plan and procure all materials to support the production of the Drilling Manifold Group.
Provide quotes and technical assistance to the sales department for all customer inquiries.
Results / Accomplishments
Procured all materials needed to meet the demanding delivery schedule of the AFTER MARKER & new Manifold business. All equipment purchased to strict API / NACE specifications to PSL level 3 inspection standards.
By working with engineering and the sale team we are able to provide swift and accurate quotes that
Have netted us a great deal of business for the Drilling Manifold Division.
EXPRO America, LLC 10/01/2008-03/01/2010
Houston, Texas
Rental Support Group Manager
Primary Challenge: Provide material and technical support to all oilfield rental service locations.
Results / Accomplishments
Set up central parts inventory stocking center.
Revised and upgraded all 10 field stocking locations to insure security and credibility.
Managed stock levels to provide quick service to our customers.
Trained all personnel at all 10 locations on SAP transactions and warehouse procedures.
Set up 24/7 hotline with engineering to provide technical support.
Provided full inventory and financial data to accounting.
Streamlined AFE process to capitalize on business opportunities.
Boots and Coots 08/01/2007-10/01/2008
Pressure Control Division
Houston, Texas
Inventory Control Manager
Primary Challenge: Startup Oilfield Rental Division for North America operations.
Results / Accomplishments
Setup material control and rental business software computer system (RTMS)
Trained all personnel to operate RTMS system.
Set up central stocking location to support both manufacturing and rental activities.
Procured over 5000 pieces of oilfield equipment. All equipment purchased to strict API / NACE specifications to PSL level 3 inspection standards.
Designed and manufactured all manifold and FRAC stack systems need for rental operations as well as specialized equipment such as sand and rock separator, skids, and flow line baskets.
Setup document control system to track all MTR’s, test, and certification data sheets for all equipment.
Implemented Sarbanes-Oxley (SOX) procedures for all purchases and business functions.
Resulting efforts of revenue went from $0.00 to $50000.00 Day Rate in rental activity.
Power Chokes / Power Well Services 11/01/2003-07/01/2007
Houston, Texas
Materials Control Manager
Primary Challenge: Document the value of all company assets both consumable and fixed assets to provide full financial data needed to facilitate the sale of the company to prospective investors. Evolve business processes from a manual mode of operations to a fully computerizes system. Provide material control and planning processes to business operations.
Results / Accomplishments
Inventoried all 12 locations and set up standard costing system.
Developed system software for Purchasing, Manufacturing, and Warehousing modules using FILEMAKER-PRO based software. This system also included engineering BOM’s and work order labor/cost tracking capability.
After company accusation I then implemented SAP software system which came with new owners (Power Well Services).
Managed support inventories as well as 25000 pieces of oilfield equipment at all 12 locations. This also includes personally purchasing all high dollar items from $20,000.00 to $300,000.00 per item.
As a result our team increased sales revenue from $1.3 M in 2003 to $8.5 M in 2007 with the same amount of personnel.
Consultant 02/01/2002-08/01/2003
Self Employed
Houston, Texas
Primary Challenge: Assist small business and machine shops to set up their business operations to meet the high demands of the energy industry and to get qualified as an approved vendor and expand their capabilities.
Results / Accomplishments
Successfully assisted three businesses to get vendor approval and set up approved welding capabilities at two of them.
While on contract at Power Chokes to verify value of inventories I was hired to work full time for them.
SAINT-GOBAIN CRYSTALS AND DETECTORS 10/01/1999-02/01/2002
Houston, Texas
Material Manager
Primary Challenge: Plan and procure all materials to support the production of radiation equipment.
Results / Accomplishments
Negotiated yearly contracts for material and services netting a savings of 20% of cost of goods sold.
Developed and implemented reporting capability with existing computer equipment and chaired weekly production meetings.
Education: Courses
San Antonio College Drafting
Technical Illustration
Architecture / Drafting
Extensive MRP training sessions with multiple different systems including SAP, RTMS, CA-PRMS-MRP, Martin Marietta, Arthur Anderson, and ASK-MAN MAN.