Post Job Free
Sign in

Mechanical Maintenance Technician

Location:
Kuwait City, KU, Kuwait
Posted:
January 03, 2016

Contact this candidate

Resume:

RESUME

FROM :

WADEKAR NAVIN PITAMBER

PO: KHATTALWADA

DIST: VALSAD - 396120

GUJARAT - INDIA

PHONE # 919*********

EMAIL : navinwadekar @ymail.com

CURRENT LOCATION: KUWAIT

CONTACT # : 009**********

TO :

THE MANAGER,

SUBJECT : AN APPLICATION FOR THE POST OF MECHANICAL TECHNICIAN

Respected Sir,

I have come to know from the reliable sources that there exist some vacancies for the above mentioned in your organization. I the undersigned, would like to apply for the same. My resume details are as under:

Name : NAVIN PITAMBER WADEKAR

Father's Name : PITAMBER NANJI WADEKAR

Date of Birth : 7th September, 1970

Languages known : English, Hindi, Guajarati & Marathi

Technical Qualification : ITI (Industrial Training Institute) passed.

PASSPORT DETAILS :

Passport No. : G-1169479

Date of Issue : 11-04-2007

Date of expiry : 10-04-2017

Place of Issue : Surat

WORK EXPERIENCE :

1.Site : KNPC (Kuwait National Petroleum Company)

Shuaiba Refinery, Kuwait.

Organization Name : IMCO Construction & Engineering Ltd.,

Kuwait

Designation : Rotating Equipment Mechanic

Duration : Working since 28/03/2011

2.Site : Qatar Petroleum

Organization Name : NITCO Qatar

Designation : Rotary Equipment Technician

Duration : 28/05/2008 to 31/04/2010

3.Site : Vapi Waste Effluent Management Co.Ltd.,

Designation : Fitter

Duration : 20/01/1997 to 31/05/2008

JOB DESCRIPTION :

ROTATING EQUIPMENT

1.Gas turbine (Make: PIGNONE)

Worked on a gas turbine during OMAN LNG TRAIN 2 shutdown job under instruction of GE's (General Electronics) OEM (Original Equipment Manufacturers).

Checked Liners, Fuel Nozzles, T.P. (Transition Piece), Combustion cane, Crossfire tube.

Replace damage parts.

2.Steam turbine (Make : TERRY STEAM TURBINE, DRESSER RAND)

Troubleshooting and Overhauling of different types of steam turbine.

Check bearing clearance, shaft run out, bearing crush, radial and axial float of the shaft, nozzle clearance during over hauling

Adjust thrust by add or remove shims.

Change carbon packing as per requirement.

Check OST (Over Speed Trip) of the turbine by adjusting Governor

Check Alignment.

3.Centrifugal compressors (Make : DEMAG, CLARK)

Overhauling and Trouble shooting of centrifugal compressor.

Check radial and axial float of the shaft.

Check shaft run out, bearing condition of thrust pad bearing and radial pad bearing, labyrinth condition and rotor.

Check the labyrinth clearance using by blue match or by micrometer.

Check lube oil and seal oil line and centering of shaft.

Change Mechanical Seal.

Check Alignment after assembly.

4.Axial Flow Compressor (Screw Compressor) ( Make : AC COMPRESSOR)

Trouble shooting of Compressor

Change Mechanical Seal.

Check shaft run out (Male and Female both shafts)

Check timing gears backless

Check axial and radial float of the both shafts

Check thrust pad and radial pad bearings

5.Reciprocating Compressor (V-Type)

(Make : Joy Compressor, Broom Wade)

Trouble shooting and overhauling of compressor

Change suction and discharge valves if found leaking or damaged.

Check connecting rod's big end and small end bearing clearance, crankshaft run out, crankshaft thrust, cross head and liner clearance, piston TDC and BDC during overhauling.

Adjust piston TDC and BDC by piston lock nut.

Change Viper and Carbon packing if found damaged or more clearance.

Check piston rod and connecting rod run out.

Change piston ring and rider ring.

6.Centrifugal pump

Single Stage Centrifugal pump (Make : United Pumps)

Fire Water Pump (Single stage pump) (Make : Jocky pumps)

Overhauling and Trouble shooting of pump

Check axial and radial float of the shaft, shaft run out, back clearance of

impeller.

Change mechanical seal and adjust compression as per requirement

Check clearance between impeller wearing and casing wearing.

Change bearing.

Multistage Centrifugal pump

(Make : UNITED PUMPS, BYRON JACKSON, WORTHINGTON)

Overhauling and overhauling of pump

Check axial and radial float of the shaft

Check shaft run out, Journal bearing clearance, bearing crush.

Adjust axial centering of the shaft by spacer given after thrust collar.

Adjust radial centering of bearing housing for free rotation of the shaft.

Check wearing clearance

Change Mechanical seal

Adjust thrust as per requirement

Check main lube oil pump

Fire Water Pump (Multistage pump)

(Make : PEARLESS PUMPS, REDDY BUFFALOES)

Overhauling of pump

Check axial and radial float of the pump

Change packing if found damage

Adjust thrust and centering of the shaft by add or remove gasket in the barrel type bearing housing.

Check wearing clearance

7.Reciprocating Pumps

(Make : PIRONI PUMPS)

Check oil level during routine job

Replacement of bearing

Adjust stroke of piston as per requirement

(Make : WORTHINGTON)

Overhauling of pump

Change seal packing

Change valves if found broken

Change thread coupling if found thread damage

Check lubricator

Change piston and adjust clearance.

8.Sump Pump

(Make : GOULDS PUMPS)

Overhauling and Troubleshooting of pump

Change bush bearing and thrust ball bearing

Change shaft if found damaged.

Adjust impeller front clearance by bearing housing jack bolts.

9.Inline Pump

(Make : UNITED PUMPS)

Overhauling of pump

Check shaft run out with couple with motor shaft, with impeller

Check wearing clearance

Change mechanical seal and adjust compression

Centering motor for free rotation.

10.Gear Box

(Make : WESTERN)

Overhauling of Gear box

Check gear backlash

Adjust backlash if found more by add shim under bearings.

Change bearing

Adjust axial thrust of high speed gear

11.Screw Pump (Lube oil Pump)

(Make : IMO)

Overhauling of pump

Check of Mechanical Seal

Check the clearance between screws flute

Change bearing and adjust axial thrust as per requirement.

STATIC EQUIPMENT :

1.Exchangers :

Cleaning by chemical & hydro jetting

Hydro testing of shall side and tube side of exchanger.

During hydro test if any tube found leakage, plug it, Hydro tested & box up

2.Vessels :

Opening manholes after proper Isolate and inspection of internal surface plate.

D.P. test of internal surface plate

Internal cleaning of vessels

Hydro testing of vessel

3.Columns:

Opening the main hole after proper isolation

Removal to damaged column trays

Rings, capes, repair at the same under capital turnaround

4.Valves:

Erection and maintenance of different types of valves like gate valve, butterfly valve, safety valves, check valves, ball valve and plug valve etc.,

I hope my application will meet your present requirement and you will give me a chance to serve in your esteemed organization. Awaiting your reply in anticipation.

Thanking you,

Yours faithfully

( NAVIN WADEKAR)



Contact this candidate