Project Manager Safety Officer

Location:
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Posted:
December 28, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

Name Raymond Jenau Ak. Masing

Email : acsxd6@r.postjobfree.com

Hand-phone: 016 - 8556774 / 017-*******

Date Of Birth 9th August, 1967

NRIC No. 670***-**-****

PlaceOf Birth Song, Kapit 7th Division

Home Address Block Q 1-13, Tingkat 2 Plat Sg.Plan

JalanTg. Kidurong, 97000 BintuluSarawak.

In process to register with DOSH(SSS) Yellow Book

Academic

Qualification

Year Name of Establishment Seminar Attended

2004 UPMKB Pra-Diploma (PRO)

1987 SMK Tatau SPM - Peringkat 1

1985 SMK Tatau SRP-Grade A

1983 SRK Hua Kong Miri Complete Primary Six

Course Attend

Year Name of Establishment Seminar Attended

Aug, 2014

Sept, 2014

Malaysian Red Crescent

Society

Master Builders

Association Malaysia

First Aider Course

(Certificate)

Site Safety Supervisor

(SSS -Competency Certificate)

March, 2003 Harbour-Link Group Quality Management System ISO 9001:2000 (Certificate)

Jun, 2003 EDI Training &

Consultancy Sdn Bhd

NIOSH Secretariat for

Sarawak

Safety Supervisor Course

(Certificate)

Jan, 2003 CIDB Malaysia Scaffolding-Tube & Coupler Level 1 (Certificate) Dec, 2003 Institut Keselamatan &

Kesihatan

Perkerajaan Negara

(NIOSH)

Safety and HealthOfficer (Certificate)

Course & Practical

(22 days)

August, 2008 Team Industrials Service

INC

Chemical Handling Safety

Basic Principles

Singapore (Certificate)

May, 2010 Team Industrials Service

INC

Singapore

Hazard Recognition Control

(Certificate)

July, 2010 Team Industrials Service

INC

Singapore

Job Safety Analysis

Pro - Active Planning

(Certificate)

April, 2010 Team Industrials Service

INC Singapore

PPE - Requirement

Don't start work without it

(Certificate)

March, 2012 Chiyoda Sarawak Sdn Bhd

Training Centre

Confine Space Entry

April, 2010 Transocean Eastern

Training Centre Singapore

Job Safety Analysis & Job Hazards Analysis

(Certificate)

Feb, 2012- Chiyoda Sarawak Sdn Bhd

In House Training

Permit To Work System

PTWS (Certificate)

Feb, 2012 Chiyoda Sarawak Sdn Bhd

In House Training

Supervising Safety Course In House

Practical (Certificate)

Feb, 2012 Chiyoda Sarawak Sdn Bhd

In House Training

First Aid Practical Training

(Certificate)

Feb, 2012

Sept, 2014

Chiyoda Sarawak Sdn Bhd

In House Training

Master Builders

Association Malaysia

Scaffolding Safety Course Erected &Dismantle

(Certificate)

Site Safety Supervisor course

(Certificate)

Computer

Literacy Programme

Ø Microsoft Project

Ø Microsoft Word

Ø Microsoft Excel

Proficiency Level

Excellent

Excellent

Good

Language

Proficiency Language

Ø English

Ø Bahasa M.

Ø Mandarin

Ø 3 Local Chines

Ø Vae Segan

Ø Bahasa Iban

Written Spoken

Fluent Fluent

Fluent Fluent

Fluent Fluent

Fair Good

Fair Good

Fluent Good

April,2013 National Institute

Occupational Safety &

Health (NIOSH)

Oil &Gas Safety Passport -Level 2

July, 2013 Malaysia LNG Sdn Bhd-

Industrial Hygiene Section.

Safe to use respirator (Fit Test) to against Hygiene& Chemicals.

December,201 Construction Industrial Construction & Development Safety Regulations & 0 Development Board

Malaysia (CIDB)

Rules and Site Safety Procedures.

From 1st May 2015 Dialog Engineering &Construction Sdn Bhd To 30th November 2015. Project : Piping Installation package Include commissioning. Position: Senior HSESupervisor

Owner: Petronas LNG Train9

Main-cont : JGCCorporation & JGC (M) SdnBhd

Reason for leaving: Completion of project.

Responsibility

Assist DECSB HSEManager in Managing HSEmatters as workplace. Conduct daily HSE inspection at workplace.

Conduct daily Tool-Box Meeting with allDialog Subcontractor. Attend HSE-relatedmeetings organized by Client & Owner Advice on HSEmatters to the Site Supervisor &Work Leader Participate actively in others HSE related mattersat site. Guide management to comply with PTW requirement, Zero Tolerance Rules, OSHA 1994 and FMA 1970 (BOWEC) 1986.

Knowledge acquired :

To learned more piping system and procedures.

To learned more Commissioning requirements and procedures To learned more highpressure test and Pneumatics' test procedure Referees :

Encik Mohd NajibBinKamarrudin

Dialog Project HSEManager for Petronas LNGTrain 9. Hp: 012-***-****

From 20th March 2015 Sulzer Chemtech Pte Ltd - Safety Officer To 26th April 2015 Short contract For TurnAround / Shut down Project To service and Install Hifi Trays (Re-trays)

MLNG 3 - Module 7 (Column 7C-91101 & 91103)

Responsibility

Direct report to Project Manager & MLNG TAHSE Officer Prepared HSE Report and UAUC observation report

Conduct daily toolbox meeting

Representative company to join Turn Around HSE audit member (TAAudit Present finding / observation during audit to client (MLNG 3 TAManager) Representative company to join daily HSE TA Meeting Conduct daily inspection / Audit at our own area.

To arrange equipment and machinery for inspection

Coordinate withMLNG Environment team for the schedule waste arrangement, storage and sticker for labelling.

Coordinate withMLNG Security Department for workers infringement Issue.

Guide Management to comply with PTW requirement, Zero Tolerance Rules, OSHA 1994 and FMA 1970 ( BOWEC) 1986

Knowledge acquired

To learned more working inside confined space (Column) To learned more Sulfino and Mercury chemical hazard To learnmore Live Plant System and requirement.

From 6th November, 2014 Nippon Express Co.Ltd - Site SafetySupervisor (SSS) Short contract only for Installation of Vessel

To 28th February, 2015 Petronas LNG Train 9 Project EPCM Project to monitor overall HeavyLift activities. Client : JGC's

Owner: Petronas LNG Train9 Sdn Bhd

ACTIVITIES ;

Report to SHO and Construction Manager

To conduct daily toolbox meeting prior the work start Prepared HSE performance / statistics report

Assist in administering the activities of the HSE section Guide Management to comply withOSHA 1994 (ACT 514) and Building Operations Works Engineering Construction (Safety) Regulations 1986

(BOWEC) 1986

Implement HSE Policy, Plan, Objectives and targets identified by management

Ensure and assist line managers to comply with the Rules & Regulations of HSE Management System (HSE-MS)and relevant certification

Review / Develop / update HSE-MS procedures / Documents and JSA/JHA

Address HSE issues / concerns raisedby line top management to maintain high HSE Performance standards and operations integrity Develop HSE audit schedule, Check-list and conduct HSE audit as per HSE management Plan & Program

To do daily check-list and daily inspection for all cranes and lifting gears

To coordinate withclient HSE and Owner HSE during lifting work in- progress.

Knowledge acquired

Learn more experience in Heavy Lift activity

Encounter foreigner safetybehaviour attitude

Learn more about Crawler crane / Mobile crane condition From 15th September, 2013 Chiyoda Malaysia Sdn Bhd -Safety Officer To 31st October, 2014 Oil & Gas Contractor

EPCM Project Immobilized Slurry Reactor -Shell-MDS Monitor of overall activity construction & Installation Work of Piping, mechanical, Instruments, structures and civil work activities Owner: Shell-MDS (M) Sendirian Berhad

Project registration No. JKKP-SW/13/03/4743

Direct report to Shell-MDS Project Manager and

Chiyoda HSE Manager

To implementing OSHA Act 1994 and HSE Program & Plan from Shell-MDS that has approved by Management level to the IMSR project.

To conduct Project Specification Training to new comer workers To prepared weekly& Monthly report to the Shell-MDS Management team and HSE Advisor

To leaddaily walkabout and management teamwalkabout at every Thursday.

To reviewed JHA for approval.

To convert JHA to HAZIDand SIMOPs system and closed. To prepared weekly& monthly HSE Program & Plan

To conduct monthly safety mock-up training

Conduct daily toolbox meeting

Prepared monthly housekeeping programme& plan

To leadHSE weekly and monthly audits activities.

To plan HSE campaign and awareness for the month according to current activity.

To conduct PTW stand down procedure & rules

Attending weekly & Monthly HSEMeeting.

Coordinate withcontractor Safety officer and Manager. Knowledge acquired

Learn more Slurry Reactor Instrumentation &

equipment.

Learn more HPS Demo Instrumentation &

equipment.

Direct deal withvendor from Holland&West

Germany.

From 27th August 2013 Sulzer Chemtech Ptd Ltd - Safety Officer (Completion of Turnaround Shutdown) To 07th September 2013 Oil & Gas Service MLNG CO2 Project Module-2 Pitstop Shutdown Duration: 2 week Monitor of overall Module -2 - Column C-1101 & C-1102 HIFI Tray Modification work, Spading work &Box-up of manholes. Petronas MLNGModule -2 Plant Bintulu.

Report to Project Manager

To attending HSE daily meeting

To implemented JSA and JMS that has reviewedand approved by HSE MLNG (PDD) Module-2 Pit StopShutdown team.

To implements OSHA Act 1994 (Act 1994)

To implements Factories and Machinery Act 1967 (Act 139) & Regulations and Rules.

Do daily site patrol report and manpower record for Clients Conduct safety audits/walkabout for all area and equipments. To audit all PTWand make sure all activities are comply with PTW system and HSE requirement.

Make sure all workers on site observe the regulations concerning health, welfare and first aid facilities.

To enforce 10 Zero Tolerance Rules.

Coordinate withothers contractor Safety Supervisor and managements

To join dailymass walkabout withall contractor HSE and managements team.

Conduct daily toolbox meeting to all workers.

Identified potentials risk and hazards at site and recommends relevant safetyprocedures.

Knowledge acquired

Learn more Oil & GasHSE requirements and Procedures. Dealing with allmanagement level.

Learn more of Tower Field Service Procedures &Requirements. Achievement :

v Received HSE BestPersonnel Award from MLNG Sdn Bhd From 8th April 2013 Chiyoda Malaysia Sdn Bhd -Safety Officer (Completion of project) Until 20th August 2013 Monitor of overall Civil, Steel structure erection work, piping work, Completion of Project. Mechanical work and Instrument installation work. EPC of Lion Eco of MES Expansion of Chemical Plant Project Expansion of Production Plant, Service Plant 2, water treatment plant, Farm tank, F2 Plant and Firewater Tank 6 units

(Owner Lion Eco Chemical Plant Sdn Bhd

Chiyoda Malaysia Sdn Bhdas a Main-contractor

JKKP Project Registered No. JH/12/03/5449

CIDB Project Registered No. WP 0075585-22

Johor Bahru, Tanjung Lansat Industrial Complex

Report to Project Manager & Project HSE Manager

To Implements OSHAAct 1994 (Act 1994)

Implements Factories and Machinery's Act 1967 (Act139 & Regulations and Rules.

Make sure all workers on site observe the Regulations concerning health, welfare and first aid facilities.

Recommend improvements to the existing safetyand health system.

Co-ordinate and monitor all environmental, Safety and Health activities to ensure agreed safetyand loss prevention standards are fully implemented and properly followed.

Ensure all plants and tools operate according to the safety regulations laid down by the Local Authorities (DOSH) Conduct TBM by daily basis.

Conduct Safety Induction Training for new comer workers. Identified potential riskand hazards at site and recommends relevant safetyprocedures.

Lead walkabout activitiesby weekly programme.

Do daily, weekly and monthly report to project Manager and Client.

Conduct monthly HSES Audit.

Knowledge acquired

Learn more CSDS and Chemicals Handling Procedures

Dealing with all Chemical Suppliers.

Achievement target

Zero LTI until the project complete.

From 6th August 2012 Penta Ocean Corporation Safety & Environment Coordinator (Conpletion of project) To 30th March 2013 PTD LTD Monitor of Overall Civil, Steel Structure Erection work & Pipe Rack, Engineering 4 units water storage tank and 2 units Cooling Tower Contractor Project of Tokuyama (M) Polycrystalline Silicon Manufacturing Plant Project at Semilajau Bintulu, Sarawak. JKKP Project Registered No. SW/10/03/4344/ Phase 2

Report to Project Manager & Project HSE Manager.

Recommends improvements to the existing safety& Health And Environmental system.

Recommended JSA and CHRA for all newworks activity. Conducted and arrange Safety Induction Training for all new workers before their start works.

Coordinate and monitor all Environmental Safety & Health activities to ensure agreed safetyand loss prevention standards are fully implemented and properly followed,

Make sure all sub-con on site observe the Regulations Concerning Health, Environmental, welfare and First Aid facilities Conduct daily mass toolbox talk activity

To implemented Safety and Health & Environmental site rules & regulations.

Preparation of monthly HSE statistic and man hours report for regulatory authorities and top management.

Conduct safety audits / walkabout for all area and equipments. Do daily, weekly site patrol report and daily manhours report for the project.

To coordinate withcontractor safety supervisor and managements. Reviews riskassessment and emergency plan made by the execution team.

Conduct risk assessment of buildings, equipment system and process.

To implements OSHA Act 1994 (Act 1994)

To implements Factories and Machinery Act 1967 (Act 139) & Regulations and Rules.

Make sure all workers on site observe the regulations concerning health, welfare and first aid facilities.

Knowledge Acquired

Dealing with the Japanese site standard and requirement in which implementing all rules and regulation imposed by them. Dealing with all foreigner staff from others country. From 1st Nov, 2011 Chiyoda Malaysia Safety and Health Supervisor (Completion of project) To 30th July,2012 Sdn Bhd Monitor of Overall Civil, HPDE Pipe Butt FusionWelding Engineering and 2 unit light beacon onshore & offshore for Marine OutfallPipeline Contractor Project of Tokuyama (M) Polycrystalline Silicon Manufacturing Plant Project at Semilajau Bintulu, Sarawak. JKKP Project Registered No. SW/10/13/4333/JKKP. (Phase 1)

Report to SiteManager &Project HSEManager.

Recommends improvements to the existing safetyand

Health system.

Recommended JSA and CHRA for all newworks activity. Conducted and arrange Safety Induction Training for all new workers before their start works.

Conduct daily mass toolbox talk activity

To implemented Safety and Health & Environmental site rules & regulations.

Preparation of monthly HSE statistic and man hours report for regulatory authorities and top management.

Conduct safety audits / walkabout for all area and equipments. Do daily, weekly site patrol report and daily manhours report for the project.

To coordinate withcontractor safety supervisor and managements. Reviews riskassessment and emergency plan made by the execution team.

Conduct risk assessment of buildings, equipment system and process.

To implements OSHA Act 1994 (Act 1994)

To implements Factories and Machinery Act 1967 (Act 139) & Regulations and Rules.

Closed monitor welding activities for HPDE pipes 630mm using butt fusion machines.

Closed monitor for hydro statistic test using high pressure water jet pump (4.5 bars).

Make sure all workers on site observe the regulations concerning health, welfare and first aid facilities.

Knowledge Acquired

Dealing with the Japanese site standard and requirement in which implementing all rules and regulation imposed by them. From 1st Nov, 2010 Deterich Sdn Bhd Safety Officer - (Completion of Project) To 31th Oct, 2011 Oil & Gas Project Construction of Compressor Building, Engineering Metering Shelter and Equipments Footing Foundations. Contractor Under Punj Lloyed (M) Oil & Gas Sdn Bhd Owner Petronas Carigali Sdn Bhd.

Project : Sabah SarawakGas Pipeline (SSGP)

Registered No : JKKP - SW/09/03/4163

Involved in the following:

Report to Project Manager / Project Director.

Recommends improvements to the existing safetyand health system.

Identified potential riskand hazards at site and recommends relevant safetyprocedure.

Do daily, weekly and monthly report to Project Manager and Client.

Conduct and arrange Safety Induction Training for new workers before their start work.

Review scope of work completed from health, safetyand environment prospective, to identify trends and possible exposure to problem.

Co-ordinate and monitor all environmental, safetyand health activities to ensure agreed safetyand loss prevention standards are fully implemented and properly followed.

Ensure all plants and tools operate according to the safety regulation laiddown by the local authorities (DOSH). Conduct monthly HSE audit.

Conduct weekly walkabout activity and inspect all equipments and power tools.

Knowledge Acquired

Dealing with the new event.

Experience Gained

The challenge of leading of Safety campaigned for Safe Excavation, Manual Handling, Confine Space Entry and Hand &Finger Injuries Achievements

Certificate of (BestEmployee of the Year 2010) by Deterich Sdn Bhd.

Certificate of achievement of 20,000.00 (Twenty Thousand Man hours without LTI)

From 1st May 2009 Usaha MeriahSdn Bhd Safety Officer (Completion of Project) To 3rd Sept, 2010 (Engineering and Responsible of the high pressure water flushing work Pipe Flushing and Coating) (20,000.00 bar & 40,000.00 bars) for the Gas pipe 630mm (Depth Sea Pipeline Project

Kemanis Sabah)

Report to General Manager / assistant Project Manager. Do daily, weekly and monthly report to the top

management and client.

Conduct daily toolbox talk and review unsafe act / unsafe condition of yesterday (if any)

Organise HSEweekly meeting and all level.

Conduct safety induction training for all newworkers before their start work.

Ensure all power tools, equipments and pressure pump are valid certificate and operate according to the safety regulations laid down by the local authorities (DOSH). Conduct weekly safety inspection / walkabout sessions. Recommends improvements to the existing safetyand

health system.

Make sure all workers on work barge observe the

regulations concerning health, welfare and first aid facilities.

Co-ordinate and monitor all environmental, safetyand health activities to ensure agreed safety and loss prevention standards are fully implemented and properly followed.

To implements HSE programme and HSE plan that has

done by client.

Knowledge Acquired

Dealing with new event and HSE adviser of client

Experience Gained

The challenge of leading an authoritarian organization from witha team of technical site personnel including Project Manager, Project Engineers and Supervisor to function cohesively by implementing all the water blastingwork safetyand health procedures.

FromMarch, 2005 Sapura Accergy Sdn Bhd Safety & Health Supervisor (Completion Of Project) To March, 2009 Responsible for the water flushing work using high high pressure water pump to flush inlet of pipes

hole 630mm for the (Depth Sea Pipeline Project)

Under Sarawak Shell Berhad, Labuan & Batam Island. Report to SHO and Project Coordinator.

Recommends improvements to the existing safetyand

health system.

Conduct daily toolbox talk prior the work start.

Do daily, weekly and monthly inspection report and daily manhour's report of the project.

To ensure all of highpressure water pump machine are valid PMT certificate.

Ensure all water flushing plant area and tools operate according to the safety regulations laiddown by the local authorities (DOSH)

Make sure all workers on site observe the regulations concerning health, welfare and first aid facilities. Identified potential riskand hazards at site and

recommends relevant safetyprocedures.

Co-ordinate and monitor all environmental, safetyand health activities to ensure agreed safety and loss prevention standards are fully implemented and properly followed.

Knowledge Acquired

Dealing with the full experience of safetyand health personnel from Sarawak Shell Berhad

And implementing all rules and regulations imposedby them.

Experience Gained

The challenge of leading a different type foreigner culture. From February, 2003 Habour-Link Logistic Safety and Health Supervisor (Shutdown Project) To December, 2003 Sdn Bhd. Responsible to all transportation activities inplant and Lay-down area.

(Shutdown Project MLNG Plant 3)

Report to SHO / Transportation Manager.

To implement Road transport Safety Procedures.

Ensure all trailer driver and Lorry crane operator to operate their machines in plant area according to the Safety Regulations laiddown by the local authorities (DOSH) and obey traffic rules.

Conduct weekly inspection for lorry crane and trailer condition and make sure stickers are valid.

Do daily, weekly and monthly inspection reports.

To monitor hazards and identify hazards at workplace. To ensure all drivers must be wear PPE required by Client. To advise driver to obey the traffic Rules & Regulations and Procedures.

Knowledge Acquired

To learned more RoadTransport Safety Procedures and dealing withdepth experience person in transportation activities.

Experience Gained

To reduce accident in the transportation activities. FromAugust, 1996 Borneo Pulp & Paper Safety Coordinator -Bintulu Sarawak. To December, 2002 Sdn Bhd Monitor overall civil, Building construction, installed 4 units Diesel Generator and construction of concrete bridge for Pulp Mill Plant Project. (General Factories Division) Report to Project HSE Manager / Asst. General Manager. Co-ordinate and communicates HSE program withDOSH & NIOSHDepartment.

Co-ordinate withSafety and Health Supervisor from

Forestry Division, Transportation Division, General Affair Division and Nursery Division.

Conducted HSE hazards / risk assessment of buildings, equipments systems and processes area.

Monitor both construction projects and coordinatewith all contractor safetyand health supervisor to comply with OSHA Act 1994 (Act 1994) and Factories and Machinery Act 1967 (Act 139) & Regulations and Rules.

To leadwalkabout activities withall contractor safetyand health supervisor on site.

To record walkabout report / finding and advice the contractor safetyand health supervisor to rectified the area and closed.

Do daily, weekly and monthly inspections.

Co-ordinate and monitor all environmental, safetyand health activities to ensure agreed safety and loss prevention standards are fully implemented and properly followed.

Conduct toolbox talk, committeemeeting and supervisor co-ordination meeting.

Preparation of monthly HSE reports for regulatory

authorities and top management.

Knowledge acquired

Compliance withOSHA Act 1994 and Factoriesand

Machinery Act 1967 (Act 139) & Regulations and Rules. Experience Gained

The challenge of leading a different type of foreigner culture especially from China, Taiwanese and Australians Referees

1. Mr. Zolkaply Ibrahim

Project HSE Manager

Chiyoda Malaysia Sdn Bhd.

1st & 2nd Floor, Lot 3225, Sublot 49,

Parkcity Commerce Square, 97000, Bintulu, Sarawak. Tel: 019-***-****

2. Mr. Alan Goh

Project Manager

Deterich Oil &Gas Sdn Bhd

Lot 536, Pelita Commercial Centre,

98000 Miri, Sarawak, Malaysia.

Tel : 019 - 8545568

3. Mr. Adman Jubang

Branch Manager

UsahaMeriah Oil & GasSdn Bhd.

Lot 2235, 1st Floor, Saberkas Commercial Centre,

98000 Miri, Sarawak.

Tel : 016 - 8795877

4. Mr. Ahmad Aidil

Marine & Material Manager

Sapura Accergy SdnBhd

Tel : 019 - 3000435

5. Mr. Dickson John Timban

Harbour - Link Logistic SdnBhd

Acting HSE Manager

Kidurong Ligh Industrial

Tel : 013 - 8626755

6. Mr. Kanang Jarraw

HSE - Section Head

Borneo Pulp &Paper Sdn Bhd

Address : NA

Tel : 013-***-****

7

Mr. Kevin Tai

Project Manager

Sulzer Chemtech Plt Ltd -Tower Field Service (Singapore) Hp: 011******** (Office) Phone direct (+65)65155645



Contact this candidate