YUANFENG WANG
https://www.linkedin.com/in/yuanfengwang
* ******* **, **** *********, NJ, 08816 Cell: 732-***-**** Email: ***************@*****.***
SUMMARY
Experienced manufacturing/Industrial engineering, manufacturing/industrial engineer with 6 years' experience in Industrial engineering, Lean manufacturing, 5S; 1-2 years’ experience in Six Sigma, Quality Management, Kaizen, GEMBA, Cell Set up Work, manufacturing of architectural-quality fluorescent & LED luminaires.
EDUCATION
Rutgers University
New Brunswick, NJ
M.S., Industrial and Systems Engineering
May 2015
GPA: 3.5/4.0
Shenyang University of Technology
Shenyang, China
B.S., Industrial and Systems Engineering
July 2012
GPA: 3.4/4.0
WORK EXPERIENCE
Mark Architectural lighting Aug. 2015---Now
Analyzed daily production data from on-floor cells to ensure applied improvements are maintained.
Daily quality issue tracking and resolution: Interact with Group Leads, Buyer/ Planner, Fabrication and Engineering department.
Conducted time studies for product-line balancing and capacity analysis.
Trained production operators on new machines and manufacturing processes.
Assisted the Kaizen event team in setting up cell.
Produced and maintained CAD layouts for efficient process flow analysis.
Part of Hi-pot test team: Reviewed technical specification & different models of Hi-pot testers, verified test type (AC/DC) for Mark Lighting, selected the tester, creating different AC test introductions for engineers and operators.
ACADEMIC RESEARCH & PROJECTS
Reliability and Availability Analysis for a Chemical Power Plant Mar. 2015---May 2015
Responsible for data analysis: Utilized SAS to do Weibull analysis for original system. Selected the best distribution for original system by Akaike information criterion (AICc). Calculated and determined the lower reliability level that original system had achieved.
Assisted in redesigning original system: Using block diagram, Markov chain techniques to reorganize the structure of original system. Successfully achieved 0.99995 reliability level 0.9999999 availability level.
Involved in offering a maintenance policy to achieve lower replacement cost.
Statistical Quality Control for an Injection Molding Process Apr. 2015---May 2015
Utilized R language to establish Shewhart control chart for compressive strength of molding machine.
Identified the out-of-control point, successfully identified possible assignable cause.
Revised the Shewhart control chart with new added data from Phase . Utilized the revised control chart to monitor the quality of the upcoming molding process.
CERTIFICATES & SKILLS
Six Sigma Green Belt certificated by Institute of Industrial Engineers April 14, 2014
Microsoft Office(Word, Excel, PowerPoint)
AutoCAD and Comet database
SAS, R and Minitab