Post Job Free

Resume

Sign in

Power Plant Turbine

Location:
Pasadena, CA
Posted:
December 25, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

DINESH KUMAR

Mob. : 098********, 090********,

E-mail - : acswtw@r.postjobfree.com

EXPERIENCE 13 YEARS

Seeking grouth level position with an oppertunity for personal devlopment and professional advance in the field of power sector together with its subsequent activity.

JOB PROFILE :-

* To perform bether operation of steam turbine through PLC/DCS control panel drive.

* Turbine Hot and Cold start up very smoothly .

* To take enarges as asst foreman operation and abeserved all plant activity.

* To minimize down time and always prepare for maximum availability of turbine.

* Execution of maintenance of turbine equipment.

* During syncronisation of turbine co-operate with electrical and execute all necessary activity

for preparation of turbine startup.

* Responsible for operation/take initiative/rectification during problem arises of unit in running

condition as a astt foreman and get communicated with operation head.

* Responsible for turbine study.

TECHNICAL AND EDUCATIONAL QUALIFICATION :

*Diploma in mechanical engineering from IME mumbai 2015.

* First class Boiler attendent certificate of competency exam pass in 2013 C.G. board Raipura.

* Second class boiler attendent certificate of competency exam pass in 2010 Jharkhand Board

Dhanbad.

* I.T.I. in fitter trade from madhora center Bihar in 1997.

* Metric passed in year of 1995 from Bihar Board.

* intermediate exam pass in year 1997.

CAREER SCAN AND EXPERIENCE :

(A) Presently working as a astt. forman in Rameshwaram steel and power Pvt ltd (Monnet Group) Gharghoda, Raigarh (C.G.) from 09-01-2010 to Till date

* 06 Months in Monnet ispat ltd Raigarh.

POWER PLANT CAPACITY WITH DETAILS :

* 1 x 12 MW Bleed com condensing turbine, steam Press 66kg/cm2, steam temp 4850c, Turbine

make kessls India Ltd..

* 1 x 80 MW Six extraction condensing turbine steam press 90kg/cm2 steam temp 5400C make BHEL.

* 2 x 45 MW two extraction condensing turbine steam preess 62kg/cm2 steam temp 4850c make - BHEL

(B) I worked as Jr. Engineer turbine (O & M) in M/s DLF Power ltd. Rajrappa Ramgarh (Jharkhand)

from 09-07-2007 to 08-01-2010

POWER PLANT CAPACITY WITH DETAILS :

* 3 x 11 MW steam turbine steam press 45kg/cm2 steam temp 4500C Turbine make - SKODA

DLF.

(C) I Worked as a turbine operator in M/s Indolaheri Bio Power Ltd. Jaroda Bazar Raipur (C.G.)

From 01-02-2005 to 20-06-2007.

POWER PLANT CAPACITY WITH DETAILS :

* 1 x 6 MW turbine Steam Press 62kg/cm2, steam temp 4500C, turbine make Triveny company

Ltd.

(D) I worked in M/s Up Sugar Mill Ltd Khushinagar (U.P.) as a turbine attendent

from 18-12-2001 to 25-01-2005

POWER PLANT CAPACITY WITH DETAILS :-

* 4.0 MW x 2, 2.0 MW x 1, Steam Press 30kg/cm2, steam temp 4000C, turbine make Triveny

company Ltd.

PERSONAL INFORMATION

Name : Dinesh Kumar

Father’s Name : Sri Pajendra Prasad

Date of Birth : 09-12-1980

Permanent & postal Addtess : Vill. + P.O. Risoura, P.S. Maharajganj

Dist. Siwan (Bihar)

Pin 841238

Contact No. : 098********, 090********

Expected Salary : Negotiable.

Declearation

I do hereby declare that the above information is true to the best of my knowledge and belife.

Place : Raigarh

Date DINESH KUMAR



Contact this candidate