Post Job Free
Sign in

Maintenance Project

Location:
Nnewi, Anambra, Nigeria
Salary:
5,000
Posted:
December 23, 2015

Contact this candidate

Resume:

OBAROEFE OGHENEFEGO JOSEPH

Current residential address

**, ***** **** *******, ***** State. Nigeria.

E-mail

acsv8r@r.postjobfree.com/acsv8r@r.postjobfree.com

Telephone number (Mobiles)

+234**********, +234**********, +234**********,+234**********

Date of birth / Sex.

29th September, 1981 / Male.

Marital status/ Number of children

Married/2

Nationality/ State of origin

Nigerian/ Delta State.

Passport No

A 04874669

Nearest Airport

Osubi Airstrip Warri, Delta State. Nigeria

CAREER OBJECTIVE

Aspiring to be part of a world class dynamic and high performance operations or project teams in a reputable company that will also enhance my professional technical and management skills.

Over 7 Years of Instrumentation and Control Maintenance, Installation and Repairs Engineering Experience History

September 2015 till date: Instrument calibration/Maintenance Training Instructor

Employer: JB Services osubi, Warri

Role: Perform preventive and troubleshooting maintenance, Calibration instrument and testing of all Plant Instrument Process Monitoring, Control Protective equipment’s with applicable procedures and guidelines.

June 2015-August 2015: ICSS Commissioning Engineer

Employer: Total E&P Nigeria Limited via Naurex Nigeria Limited

Project Type: Brown Field (OFFSHORE SIMOPS Operations) OPERCOM/ICAPS Methodology.

Shutdown, Decommissioning/Commissioning of new instrument

Commissioning of Wellhead Control Panels

ICSS procedure Documentation/mark-up

Wiring of Yokogawa Marshalling Cabinet from Card FTA’s to Terminal Blocks

Transfer of (I/O) signals from old to new system Cabinet using Inhibition on safety bar.

Commissioning of ESDV’s and Instrument on Oil expedition line

Assisting Yokogawa Vendor on Installation of controllers, nodes and FTA’s in Marshalling Cabinet.

Commissioning and Operational Test Procedures; Shutdown and Hook-Up/ Start-Up.

Perform follow-up of E&I punch lists and be proactive in the punch list clearance process.

Modification of Marshalling Cabinet wiring/ mark-up

Troubleshoot, repair calibrate and test various types of process control instruments.

January 2015 - May 2015: E&I Pre-Commissioning Engineer

Employer: Spie Nigeria Limited

Client/Project: Total E&P OML58, Obagi Flow Station, River state Nigeria.

Project Type: Brownfield (SIMOPS) OPERCOM/ICAPS Methodology

Shutdown and Commissioning preparation and execution.

Commissioning and Operational Test Procedures; Shutdown, Hook-Up and Start-Up.

Performing work through with client to ascertain percentage of pre-com and commissioning activities.

Performing site visit with operations authority prior to PTW approval

ICSS Maintenance

To validate electrical and instrument check sheets and functional test sheets

To oversee E&I equipment suppliers' and vendors' personnel.

To perform follow-up of E&I punch lists and be proactive in the punch list clearance

Carry out and supervise the construction of the Strategic Value Identification and Value Realization processes of allocated instrument engineering Plant projects, including constructability reviews, in accordance with the client approved Project Management Procedures, while ensuring proper authorizations to achieve project delivery within approved project scope, HSE, quality, schedule and construction budget.

Develop Construction Risk Assessment of assigned Instrument projects aligned with the Project Risk Assessment to identify and assess risks and uncertainties associated with implementing the specific project and implement the Construction Risk Management Plan and mitigation strategies for assigned projects under consideration.

implement the Instrument Engineering Construction Management Plan (for Shutdown and non-Shutdown related projects), including commissioning and start up plans, spare part recommendations, training requirements, start up assistance for specialized equipment, etc, in order to ensure appropriate construction delivery, flawless start up and handover to the Business Owner or Asset Holder,

Apply the HSE and Quality Management Plan for assigned Instrument engineering construction activities and ensure adherence to the Project Quality Management System to achieve quality delivery of projects. and carry out, where required, construction changes. deviations and queries in accordance with the Change Management Processes.

Supervise the Stakeholder Management Plan and submit timely construction progress reports for assigned Instrument projects for effective communication and seamless construction delivery.

Ensure compliance to the terms and conditions of Contracts and Purchase Orders for assigned Instrument Projects and arrange for materials inspections with relevant Technical Authorities and ensure that all materials used for Instrument Engineering construction activities are of adequate standard according to specifications.

Generate and ensure complete closure of Punch List items, timely handover of documentation of completed projects, including Marked Up, As-Built Drawings I Documentation and perform Construction Performance Post implementation reviews, Lessons Learned and Close Out Reports for assigned Instrument projects to support company's continual improvement initiatives.

- See more at: http://www.justjobsng.com/2015/12/international-energy-services-limited-iesl-latest-job-opportunities/?utm_source=feedburner&utm_medium=email&utm_campaign=Feed%3A+justjobsng%2FNLjb+%28JustJobsNg+NIGERIA%29#sthash.hwU2qbLh.dpuf

October 2014- December 2014: Instrument commissioning Engineer

Employer: Snef Services Nigeria Limited

Client/Project: Total E&P Nigeria Limited OML102 Ofon River state

Project Type: Brown field (Offshore/SIMOP Operations) OPERCOM/ICAPS methodology

Shutdown, Hook-up, Start-Up and commissioning procedures preparation and execution.

ICSS Site Acceptance Test (SAT), Commissioning and operational Test Procedures (OTP)

ICSS Maintenance on Yokogawa Hardware system

Servicing and Maintenance of MPFM(Multipurpose Flow Meter)

Commissioning and Operational Test Procedures; Shutdown and Hook-Up/ Start-Up.

Carries out visits to internal and external client sites worldwide, onshore and offshore for the purposes of testing, installation, pre-commissioning, commissioning, servicing and maintenance of Jiskoot Sampling and Blending Systems.

Conducts all work activities in accordance with legal legislation and working conditions applicable to the site where the work is conducted ensuring that all work conducted does not compromise personnel or equipment safety.

Prepares and issues a detailed report identifying all work conducted and recording all hours worked for all site work undertaken.

Prepares internal reports from any site observations to allow continual improvement of the Company’s documented quality system and standard design procedures.

Conducts specific visits to client sites for the purposes of providing technical support and recommendations with respect to the supply of performance and maintenance enhancing modifications and / or necessary spare parts inventories as requested.

Actively reports to the necessary internal responsible person, any information which may be received at any time which may be utilized to promote the Company and its products and services.

Ensures all documentation related to the work performed is filed for future access in accordance with standard procedures.

Prepares any necessary documentation and information for the submission of invoicing, ensuring that this is conducted in a timely manner.

Responsible for the safe keeping and maintenance of the Company’s Test and Maintenance equipment.

Additional responsibilities as required.

Nov.2013-October.2014: E & I Pre-Commissioning/Commissioning Engineer

Employer: SPIE Oil and Gas Services.

Client/Project: TOTAL E&P OML58 Obagi Flow Station Upgrade, Obagi, Rivers States Nigeria.

Project Type: Brown field (SIMOP Operation); OPERCOM/ICAPS Methodology.

Shutdown and Commissioning preparation and execution.

Commissioning and Operational Test Procedures; Shutdown, Hook-Up and Start-Up.

Performing site visit with operations authority prior to PTW approval

ICSS Maintenance

To validate electrical and instrument check sheets and functional test sheets

To consolidate E&I pre-commissioning and commissioning progress.

To perform follow-up of E&I punch lists and be proactive in the punch list clearance process.

May 2012-August 2013: Instrument Pre Commissioning and Commissioning Technician.

Employer: Daewoo Nigeria Limited.

Client/project: Chevron Nigeria Ltd Escravos Gas-To-Liquid Project. Escravos, Delta State, Nigeria:

Project Type: Green Field (Offshore)

Project Prime Contractors: SGC (KBR AND SNAMPROGETTI)

Commissioning, Loop Checks, Operational Test Procedures (OTP) and Site Acceptance Test (SAT). Working knowledge of ISA S84 Standard and CHEVRON Specifications.

January 2011- April 2012: Instrument Pre commissioning and Commissioning Technician

Employer: Techint Cimimontobi (TCM).

Client/project: Chevron Nigeria Ltd EGTL Project. Escravos, Delta State. Nigeria.

Project Type: Green Field (Offshore)

Project Prime Contractors: Daewoo, Techint and SGC (KBR AND SNAMPROGETTI)

Instrument Calibration and Installation quality control activities.

January 2010- December 2010: Instrument Technician.

Employer: Desicon Engineering Nigeria limited

Contractors/Projects: TOTAL E&P OML58 Obite Gas Plant Upgrade. Obite, Rivers States Nigeria

Project Type: Green Fields and Brown fields.

Maintenance, Shutdown and Start-up: Instrumentation, Pneumatic, Hydraulic and mechanical Systems.

Cables, cable trays installation, primary/secondary earthing of field instrument stanchions, instruments and JBs, gland and termination.

Instrument installation/ termination and tube bending (3/8,, inch) on instrument manifold to process line tapping point and instrument air manifold.

October 2000-January 2003: E & I Maintenance Technician.

Employer: Beta Glass plc. Ughelli, Delta State, Nigeria

Perform preventive corrective and maintenance on the process control Instrument.

Remove dismantle overhaul/repair and install electric pneumatic, electronic or hydraulic control system such as control valves and actuators, recorders measuring (Transmitters) and recording instruments in the field or in the workshop, perform preventive and emergency maintenance on all equipment on site.

Installation, Maintenance, Troubleshoot, repair, calibrate and test various types of process control instruments and relay logic which include pneumatic electrical and electronic instrument.

Education and Professional Training

2015(November): Certificate on completion of five PLC’s courses, Allen-Bradley Micrologix1000, Siemens S7, Schneider, Omron and Delta. (Udemy)

2015 (MAY): ISO 9001: 2008- Certified on Benefit and Quality Management System

Requirements: 360training, 13801 Burnet Rd, Suite 100, Austin, TX 78727.

2014(AUGUST): BOSIET Certificate (Basic Offshore Safety Induction and Emergency Training) - valid till 2018- By Tolmann Allied Services Co. Ltd Offshore Training Centre. (OSTC)

Helicopter Underwater Escape Techniques (HUWET)

Survival at Sea(SAT)

Offshore Safety induction (OSI)

Basic Fire Fighting and self rescue

Basic First Aid (BFA)

2013 (DECEMBER): APAVE Electrical Safety Authorization (NF C 18 510 French Standard) for Low Voltage Operations (B2V & HO Certified). Company Sponsored.

2012 (APRIL): Basic Offshore/Onshore Safety training Safety induction

Permit to Work training(PTW)

Working at height

Lockout and tag out training (LOTO)

Confined space training

Hand and power tools safety by SGC/Chevron Nigeria Ltd.

2011(JUNE):Electrical Habilitation Safety certificate. Codacon Nigeria Limited

2010 (June)

Authorized gas testers training

Basic Fire fighting safety

Basic first aid safety

Hazard identification, Anomaly Report, Waste management, Spill Emergency Response, Chemical Handling, PPE Usage and Maintenance, Hand Wrist & Finger Safety. By TOTAL E & P NIGERIA LIMITED

2010(JULY) Nigerian Institute of Safety Professionals NISP Level-3

National Youth Service Corps (NYSC) 2009/2010 Batch C.

2003 - 2009: Federal University of Technology Akure, Ondo State, Nigeria.

B.TECH (in Meteorology (option in Instrumentation)

1993-1999 Government college Ughelli

1987-1992Oharisi Model primary School, Ughelli

PERSONAL CHARACTERISTICS

Proficient in the use of MS-Word, MS -Excel, and MS Power Point

Ability to Interpret process and instrumentation diagram( P&ID)

Ability to work under pressure

Ability to supervise, direct and guide groups in the completion of tasks and fulfilment of goals

Self-motivated team player

Troubleshooting of problems and solving them

Ability to write sound technical report

Ability to plan, Organizes and execute project

Sound in spoken English Language

Working with high consciousness of Safety

Experience Details.

Commissioning and operability test experience:

Live Loop check, Calibration and Function test of: pressure, temperature, flow, level, vibration, analytical and F&G instruments, ultrasonic flow meters, control valves, on/off valves (SSV, BDV, ESDV & SDV), limit/proximity switches, PAGA instruments, HVAC Systems and motors/diesel engines and steam turbines solo run. Also test alarm set points and trip points

ICSS Testing and Commissioning: Yokogawa Centum CS3000 RS and Centum CS1000 DCS, Allen Bradley SLC500 Series PLCs, Triconex,Yokogawa Plant Resource manager (PRM) and Emerson AMS Suite Computerised Maintenance Management Systems (CMMS), SIS/ESD and F&G Control panels, testing interlink signals between platforms, Local Control Panels and Chromatograph analyzer shelter control panels. Others are Schneider, Allen Bradley Micrologix 1000, Omron, Delta and Siemens S7 PLC.

Troubleshooting of: field sensors, instruments, control system cards and perform system modifications and generate new loop drawing. Perform trending in DCS

Familiar with; Foundation fieldbus, HART, Modbus, Profibus, 4-20mA and Pneumatic, Hydraulic, communication instruments and systems.

Documentation: filling of operability and commissioning test forms and submit to update data base. Generate mark-up drawings to create as-built drawing, document all modifications for approval and to update exiting documents. Follow up and clear punch lists.

Commissioning Preparation: Review of Commissioning Dossier (Folder), Vendor Package documents, OTP steps, commissioning (ICAPS) forms, ESD Cause and Effect matrix, I/O’s list and inspection of test equipment and request for missing items.

Maintenance experience:

Corrective Maintenance: troubleshooting and repairs of process instruments and their sensors, replace electronic parts, calibration and replacement/installation of complete instruments, cables and tubing network. Disassemble, repair and reassemble control valves and their actuators safely. Test valves for leaks, perform lapping of valve seats, and set the set-pressure of PSV/PRV.

Preventive Maintenance: Routine maintenance, calibrations, preservation, inspection and prediction of an instrument failure, servicing of compressors filters, draining of control valves air regulator filters. Shutdown Turnaround Maintenance.

Take part in different daily, weekly and site coordination meetings when required by Foreman

Carrying out visual inspections, checks and condition of all types of valves (on/off isolation, safety relief and control valves)

Dissemble, clean valve components, inspect, repair/overhaul valves as per standard procedures repairing.

Maintenance,and replacement of all instruments(control system, electrical/pneumatic valves, thermocouples

Setting up and testing of all types of valves, and fittings

Maintenance and servicing of MPFM (Muti Phase Flow Meter)

calibration of all controlling equipments,controlling loop designing

Install, repair, and maintain mechanical regulating and controlling devices, such as electric meters, gas regulators, thermostats, safety and flow valves, and other mechanical governors.

Disassemble and repair mechanical control devices or valves, such as regulators, thermostats, or hydrants, using power tools, hand tools, and cutting torches.

Prepare Maintenance reports break down for submission to Foreman

Prepare comprehensive data reports on operation (routine or other)

Follow-up the maintenance activity through a Work Order system and approve the maintenance Work Order reports through the use of the most common CMMS (SAP-UNISUP-MAXIMO-DATASTREAM, etc.)

Carry out the final controls and the associated maintenance tasks planned by CMMS

Fill and sign the data sheets which represent the maintenance file

Update the information for CMMS

Take part in different daily, weekly and site coordination meetings when required by Supervisor/Manager

Prepare Maintenance report

Shutdown turnaround maintenance.

Wellheads instruments maintenance.

Pre-commissioning experience:

Interdisciplinary Checking: Involved in checking between instrumentation and other discipline installations facilities, especially at sensitive interfaces such as between piping and instruments, anticipating problems and offering solutions.

Cold Loop Check, Testing and inspection of cables: insulation resistance and continuity test, inspection of cables insulation, inspection of cables segregation according to signals, inspection of cable glands and ATEX certification of glands and JBs.

Earthing system: earth resistance test, inspection of all installations earthing system in compliance with project specification.

Electrical power systems: test transformer oil dielectric, inspect bus bars, IPs, Switch boards, and breakers. Check materials and their rating against design specification.

Piping Pre-commissioning and commissioning Experience: Preparation of Test Pack, P&ID Mark-up ISO Drawing, Leak Test, Steam Blowing, air Blowing, Pressure Test and Purging

Documentation: fill test and check sheets, submit to update data base (e.g. ICAPS) and also to prepare the RFC folder (Dossier). Prepare punch list and follow up.

Instrumentation and electrical constructions experience:

Control systems installations: PLCs racks, PLCs, system cabinets and internal components, system cards, rails and terminal blocks, labelling and tagging of control system wiring and blocks.

Quality Assurance and Quality control: Electrical and Instrumentation Installation follow up, correction and enforcement of project design specification on installation teams, preservation and control of materials in the store and on site, protection of installed instruments and equipment from welders spark, moisture and weather impact.

Calibration: field process control instruments including Flow chart recorder, control valves, ESD and F&G instruments, and analytical (PH, water purity, CH4, CO, CO2, O2, H2S, SO2, H2, gas chromatography and microwave absorption) instruments.

Field Installations: Cables, cable trays, stanchions, instruments and JBs, gland and termination.

Design and engineering skills:

Instrumentation Design and Implementation: Pressure, Level, Flow, Temperature, Control Valves, ESD Systems, Well Heads (Christmas Tree) and Controllers- Selection, Sizing, and Implementation based on type of service, process conditions (including type of fluids), environment and costs implications. All in accordance with International Codes and Standards (ISO, ISA, IEC 61508, IEC 61511 API, ATEX, ASME and recommended practices.

Familiar with International Codes and Standards, CHEVRON and TOTAL E&P Specifications as applied to Design, Detail Engineering and installations.

Project Coordination Experience: Planning and preparation, Site Safety Programs/risk assessment, Permit to work (PTW) including Electrical and Mechanical Isolation, Reports and Project documentation, Site inspection, work force lead, materials storage and quality control. Interface between Contractors and Companies/Client over task queries and do documentation.

LeadershipExperience: Trained indigenous commissioning and calibration technicians on the job and through training workshops at EGTL, lead a 25 member commissioning team at EGTL, lead a team of Pre-Commissioning/Commissioning Engineers and Technicians at OML58 Upgrade, also lead an instrument installation teams, posses high documentation and report writing skills, good team player and motivation skills, enforce team compliance to site and safety rules and regulations.

Computer Skills: ICAPS, Microsoft Project Professionals, Word, Excel, Power point, Outlook, Corel draw, programming, software installation and updating.

Special skills: Accountable, Dependable, Goal Oriented and unique presentation skills.

Awards

April. 2015 HSE Certificate Awarded: Best Anomaly Award of week 13, by Total E&P Nigeria Limited

AUGUST. 2014 HSE Certificate Awarded: Best Anomaly Award of Week 33, by TOTAL E&P Nigeria Limited

Referees: Available on request



Contact this candidate