Post Job Free
Sign in

Project Manager Director

Location:
New Haven, MO, 63068
Posted:
December 19, 2015

Contact this candidate

Resume:

Lindell Scott Peterson

**** *** *

Hermann, Missouri 65041

573-***-****

*********@****.***

Work History

**** – Present Consultant for US Contractors thru out South

America, Caribbean, and the United States

1999 – 2001 Sr. Project Manager

Caribbean International Corp

Duties

oDailey office activities

oSales

oManagement field operations

oInvoices Billing

Projects

oGulf Caribbean Refining (Cataño, PR)

Refurbishing entire facility

60,000 man hours (No lost time or first aids)

oPhillips (Guayama, PR)

Repair of six Hydrogen vessels

1998 -1999 Consultant

Sun Refining (Yabucoa, PR)

oWork in conjunction with Nooter Corporations

St. Louis.

oInstructing Puerto Rican employees on tower revamps, heaters and rigging.

Coastal Aruba N.V.

oManaged 14 subcontractors for three months performing vessel weld overlay, heat exchangers repairs, nozzle and pipe installation, insulation, scaffolding, stress relief and supplying support crafts to US contractors.

oCraft personnel managed

500 Turkish

150 Philippine

50 Puerto Rican

1996 – 1998 VP Marketing

Houston based turnaround contractor

Duties

oSales

oAttending bid meetings

oEstimating projects

1994 – 1996 Consultant

Phillips Chemical (Guayama, PR)

Instructing Puerto Ricans working on 17 towers revamps and six reactors.

Project Manager

BP Refining Lima Ohio

Fabrication of new reactor head and cyclones, co boiler lines, and their installation in a three week period.

1986 – 1994 Director of Operations

Serv-Tech, Inc

Duties

oEstimating, Cost Control, Profit and loss reports, Project Controls

oManagement of 13 superintendents and 250 craft personnel on a daily basis.

Company revenues $140 million each year

1983 – 1985 Technical Advisor & Superintendent

Glitsch, Inc

Installation of the first tower to be packed in the world

o40’ vacuum tower

Internal false wall

Eight beds of packing

Six major distributors

Five collector trays

oInstallation of 112 nozzles (1” to 48” in diameter)

o70,000 man hours and project completed in five weeks

oFirst Vacuum Packed Tower in the World

1973 – 1983 Project Manager, Superintendent, General Foreman & Craftsman

Brooks Erection, Inc (St Louis)

Started as a craftsman and was given the opportunity to execute several projects. Project Manager over 5 to 20 million dollar projects.

CAREER HIGHLIGHTS

#3 Cat Turnaround Star Enterprise (Director Operations)

Prefabrication of new 39’ regenerator head with 39 cyclones

Foundation for placement of Lampson 1500 ton crane

520 ton lift executed at a radius of 180’

75,000 man hours of extra work without extending the schedule

Revenue $12,000,000

Crude Fire Turnaround Mobil (Director Operations)

Major fire damage swept through their crude unit one week before Christmas

Project was scheduled for 28 days and completed in 18 days

During 3 weeks performed piping, exchanger, structural steel, heater, vessel and tower repairs

Revenue $6,000,000

HCU Turnaround Mobil (Director Operations)

Scheduled for 28 days, but cracks found in the foundation of the main compressor make Mobil issue major work orders to be completed by the time the compressor was to be commissioned.

Completed in 10 weeks

Major work was completed thru out the plant

Total project exceeded $16 million

DuPont Ethylene Turnaround (Director Operations)

Cleaning all of their exchangers, performing mechanical installation and repair of all their vessels and drums.

At the same time, we sketched on preliminary and fabricated over 500 ISO’s and completed the installation in a timely manner in conjunction of our shut down schedule.

Revenue $5,800,000

Huntsman Chemical (Director Operations)

Term contract

Compiled data on every exchanger in their facility to perform turn key mechanical work on each piece of their equipment on a daily basis.

Revenues $10,000 to $20,000 per month

VPS 4 Turnaround Star Enterprise (Project Manager)

Removal of 21 fin fan coolers and installation of new.

Retubing 11 coolers in place, 86 heat exchangers, push, pull, clean, head up and test.

Replacement of 4 heater stacks, repairs on all vessels and drums

Relocation of 7 pumps and installed associated foundations and 9% chrome piping.

Project estimated the project duration on 21 days, and established a bonus for every shift we go under, resulting in a bonus of $400,000 because we finished in 17 days.

. VPS 2 Turnaround Star Enterprise (Project Manager)

Unit was built in the 1930’s, and by far was the hardest project in my career.

Project consisted of 103 conventional pull exchanger, 6 furnaces to be completely retubed, new skin casing and hangers.

Every drum and vessel had to be wet mag and dye checked at every weld seam.

Relocation of 23 pumps foundations and related piping.

Two flare tips were changed out, and a total of 2600 wells made, with a total of 1800 to be stress relieved.

Asbestos at every vessel and the vacuum tower didn’t have proper access east to west and north to south.

Project scheduled for a 26 day period and completed our scope in 28 days with 60% extra work.

Revenue $5,800,000

. Temple Inland (Director Operations)

. Replaced 52 Stainless Valves. Each valve had to be cut out

And fit per ASME code inspection

. All Valves were 6” to 36” 100% x-rayed

. Project was completed start to finish in 24 hours

Experience

. Hours Worked

o Craftsman, GF, Supt, Project Manager 28,000

o Director Operations 17,000

o Consultant 14,500

. Welding

o Mig, Tig, Stick, Automatic Machines

o Carbon Steel, Stainless, Titanium, Monel, HK 47, Aluminum

o All aspects of ASME Code Procedures

. Planning & Estimating

o Task, Casps, Primavera, P3, Artimas, Open Plan

o Estimating - All phases Petro Chemical, Pharmaceutical, Paper Mills, Brewery

Facilities, Ammonia and Chemical Plants

. Cat Crackers

o Head and Cyclone Replacement

o Hex Metal replacement and Repairs

o Y Section Repairs

o Dip Leg and Air Grid Replacement

o Catalyst Change Out

. Towers

o Tray and Supports Repair and Replacements

o Gem Pack, Flex Pack Installation

o Distributor Piping

o Feed Troughs, and Parting Boxes

o Nozzle Installation

o 1,2,3,4,6 Pass Tray Installation

o Demister Pads

o Swirl Baffel Repair, and Installation

o Clad Liners

o Weld Overlay

. Exchangers

o Push, Pull, Clean

o Tube Extraction, Installation, Rolling

o Testing SS/TS

. Heaters

o Tube Replacement

o Skin Casing Repairs

o Tube Rolling

o Refractory Anchor Installation

o Tube Hanger Repairs / Replacement

. Piping

o Fabrication, and Installation

o Valve Repacking and Replacement

o Relief Valves

o Regulators and Control Valve Calibration

. Brewery

o Lauder Tub Erection and Installation

o Mesh Cookers and Brew Kettles

o Polishing of Stainless Steel

o Steel Stretching and Forming

o Worked 2 yrs. with Zimman Corporation (Germany)

. Managed Sub – Contracts

o Scaffolding

o Insulation

o Heat Treating, Stress Relief

o Civil

o Chemical Cleaning

o Torquing of all Equipment

o X-Ray, NDT

o Painting, Sandblasting

References

o Gary Cross Ranger Planning (Sr. Planner) 409-***-****

o Jim Higgins (T/A Manager) Motiva Enterprize 409-***-****

o Julio Hernandez Gulf Caribbean Refining ( Plant Manager) 787-***-****

o Chris Griffith STI (Construction Manager) 409-***-****

o Walt Schmitchen Altair Strickland ( Contracts) 281-***-****

o Guy Whitford STI ( Project Manager) 409-***-****

o Odrick Smith Retired ( T /A Supt) 409-***-****

# More References available upon request



Contact this candidate