Post Job Free
Sign in

Industrial engineer

Location:
Surprise, AZ
Posted:
December 19, 2015

Contact this candidate

Resume:

Jon Cole

Professional Summary:

In my tenure as an Engineer, I have 12 years of experience. Within that

experience, I have been a Industrial. Mechanical, and Manufacturing

Engineer respectively. My main focus and bulk of experience as been working

Lean Manufacturing projects, such as optimizing product flow using floor

layouts and other lean tools like spaghetti diagrams to increase production

and minimize overtime. As Manufacturing Engineer, I was involved with

creating methods of operations while working with experts on the floor to

make the product as efficiently as possible. This included red lining the

mfg plan and processing the engineering change requests (ECR). All an all,

my experience as been to design and implement a robust Manufacturing system

that eliminates waste and increases product flow.

EDUCATION AND PROFESSIONAL DEVELOPMENT

A.A.S. Coursework toward Associates of Applied Science, Mechanical Drafting

and parametric modeling, Pima Community College, December 2003

B.S. Industrial Engineering, University of Arizona, May 2001

A.A. General Studies with engineering emphasis, Glendale Community College,

May 1995

Technical skills:

.Six Sigma Green Belt, Lean Manufacturing, 5s, JIT Concepts

.AutoCAD r12-2002, 2d/3d parametric modeling Intergraph micro station

(facilities layout)

.ASME Y14.5M, GD&T, Industry Standards and drawing practices

.Ability to support and address daily manufacturing issues with 1st line

managers

.Microsoft Excel (i.e. Pivot tables), MS Project, Access data base (Create

Queries)

.Operated CNC (Computerized Numeric Control) turning centers and mills

Professional Experience:

Boeing Portland, Gresham, OR

4/07-4/09 Rehired: 2/2010-Present

Industrial Engineering Dept

Complex Machining and Assembly of Flight Critical Components

BCA: 737, 747, 767, 777

.Directed and lead the development of shop performance metrics by

analyzing data in order to recommend a plan of action for daily

Production

.Lead the development of a visual build plan to support sequence of build

and maintain cost, quality and schedule performance

.Direct floor support for the 777&767 Assembly areas

.Conducted internal Lean assessments using the LMA Tool

.Conduced training sessions on the LMA tool (V4.0-V6.2) to shop floor

personnel

.Participated in AIWs and other LEAN events such as VSM for process

improvements

.Support First Line Managers in daily production requirements related to

meeting schedule and delivery to the customer

.Use Industrial Engineering and Lean + principals to support process

improvements

.Maintain Quarterly staffing plan and update Load Charts to meet the

overall business plan

Boeing Helicopter Company, Mesa, AZ

11/04 - 4/07

Rotorcraft Repair and Overhaul Depot (DRO)

Industrial Engineer 2 (DFKE)

.Conducted internal Lean assessments using the LMA Tool for the WGA site

responsible for sections 2, 5, & 6

.Direct hands-on shop floor support within the tear down and build of AH-64

gear box activities

.Interact with facilities, production personnel, and management to identify

and solve complex problems

.Used sophisticated Industrial Engineering principals to evaluate and

design process improvement methods

.Reduced labor hours over a 2 year period by increasing flow within the

Main Rotor Head shop. Resulted in saving 2 million dollars in excess

overtime.

.Supported the Main Rotor Head product team to achieve optimized floor

space and increased production by 20% using detailed process flow analysis

.Designed a layout for a new production line that feeds the testing of the

Apache AH-64 main transmission and small gear boxes

.Submitted capital requests to purchase and install crane systems in the

test area minimizing excess material handling of expensive AH-64 components

(Main Transmission and gear boxes)

Fortner Aerospace, Prescott, AZ

2/04 - 10/04

Allied Signal/Honeywell Tier 1 supplier

Manufacturing Engineer

.Set-up Methods Of Tooling (MOT) for Aerospace machined parts

.Interact with CNC Supervisors and operators to address daily issues

Rain Bird -AMD, Tucson AZ

1/03 - 12/03

Quality Department

Quality Inspector

.Inspected in process products and completed Press Qualifications

.Provided Engineering support for upgrading the burst test equipment and

writing test instructions for the Golf products

.Resulted in improved burst testing capability while maintaining safety and

testing efficiency

RAYTHEON, Electronic Systems, Tucson, AZ 2001-

Feb 2002

Aerospace/Missile Systems

Test System Design Center

Mechanical Engineer I

.Supported cryogenic purity testing and Cryogenic Test Station maintenance

.Project team lead for design and implementation of cryogenic filtration

system to meet high purity requirements.

.Completed Design of Experiments (DOE), that determined behavior of

particulates in inert gases

.Developed tracking system for purity test assets resulting in improved

purity tests set-up time by 15%

.Submitted a proposal to design and build 7 roughing vacuum stations, which

would have saved $250,000 per year in maintenance and repair costs.

Manufacturing Engineering Center 1999-2001

BS Engineering Student Intern

.Functioned as Industrial Engineer installing facilities, updating layouts,

and time standards

. Provided general floor support for EOSPA, a complex, 12 program

manufacturing environment.

.Installed new assembly line with minimal loss in production time.

.Developed, implemented and monitored continued process improvements within

EOSPA.

University of Arizona, Tucson, AZ

1996-1999

Large Optics Shop

Shop Technician (1998-1999)

.Evaluated old telescopes, overhauled mechanical parts and generated

AutoCAD drawings.

.Overhauled telescope frame and components, completed project under budget

by $18,000.

.Met delivery schedules and shipped overhauled telescope three weeks before

deadline.

Opto-Mechanical Engineer Department

1996-1997

Engineer's Aide

.Assisted in research and development of gyro stabilized platform.

.Disassembled and analyzed current dynamics of mechanical parts and

structure to determine cause of slow response time and inefficiency due to

excessive weight

.Proposed several design alternatives with the potential of $100,000 annual

cost savings in maintenance and repairs



Contact this candidate