Post Job Free
Sign in

Project Engineering

Location:
Missouri City, TX
Posted:
December 16, 2015

Contact this candidate

Resume:

Rafiq Islam

**** ****** ******* ****; Cypress, Texas, 77433, USA

832-***-****, ************@*****.***

OBJECTIVE

Seeking a challenging and rewarding Project Manager / Project Engineer position with potential opportunity to grow.

MAJOR ACHEIVEMENT

Implemented common size of iron catalyst for 8 national fertilizer plants in Bangladesh which saved about $1 million annually by maintaining a central common stock for all factories.

Completed FEED, DE, procurement, construction, commissioning and start-up of San Alberto compressor plant of BAC of 69.6 million dollars located at Bolivia

Completed and submitted Project proposal for Apache Powell compressor station of BAC of 10.6 million dollars, located at Midland, USA

Statoil SAGD Project: FEED and Detailed Engineering of SAGD Well pads and associated surface pipelines of estimated production 10 K BPD

Statoil Wellpads standardization Projects: Studied DBM and EDS and submitted FEED package for an optimized well pad designed for four Injection and Producer well heads production modules.

JACOS Hangingstone pipeline expansion project: Designed under road pipelines ( HP steam, sweet fuel gas, Quench water, produced emulsion and produced vapor pipelines) crossing on Highway 63 to smooth operation and mitigation for potential impacts from operation to ensure the safety of the public and integrity of the roadway.

HIGHLIGHTS OF QUALIFICATION

Experienced with packaging design, compressor plant design, pressure vessel design, technical content changes during unit design/fabrication and project management.

Developed DBM, Deliverable List, WBS, SOW, PEP, Work Plan, Project progress report, MOM, Document Transmittal, DCN, MOC, NCR, RACI Chart, Baseline Schedule, Baseline cost estimate, staffing plans, and Lesson Learned.

Developed FEED, DE, BOM, PFD, P&ID, LDT, Tie-in list, Data sheets, PSV sizing, equipment sizing, and line sizing.

Coordination and integration of multi-disciplines function to achieve deliverables: internal disciplines, Contractor, Client, and Vendor.

Participated in HSE program, evaluated engineering procedures and standards, and performed HAZOP study and 3D Model review.

Prepared project proposals, evaluated vendor quotations and inquiries, vendor technical bid evaluation (TBE) and selection.

Assisted Construction team, monitored field problem, replied RFIs, and arranged for As-built documents.

ASME, API codes and Standards.

Experienced in Primavera 7, MS Project, Excel, Word, PowerPoint, HYSYS, Pipesys, Pipeflo, and AutoCAD 3D modeling.

EMPLOYMENT HISTORY

Exterran Energy Solutions, LP – Houston, Texas Aug. 2014 – Nov. 2015

Senior Project Engineer

Projects:

San Alberto compressor plant of BAC of 69.6 million dollars located

Project proposal for Apache Powell compressor station of BAC of 10.6 million dollars.

Responsibilities:

Responsible and interfaced with third party engineering for completion of all detailed engineering works.

Check and verify compressors, production equipment, GenSets, Air compressor skid, and Fuel Gas skid GA, P&IDs, 3D Model for compressor plant detailed engineering.

Check and verify engineering deliverables for Process, Civil and structural, I&C, Electrical, and Mechanical & Piping comply with Client Specs and ensure timely transmittal.

Provided technical input and engineering deliverables to the quotation proposal development process

Conducted design reviews with construction management and HSE representation and support TPC team on daily basis prior to commencement of construction and during construction.

Issued RFQ; coordinated with supply chain to obtain vendor and subcontractor quotations.

Replied RFIs and technical queries received from TPE, TPC, Clients and Vendors.

Coordinated compressor station design, and reports any changes for revised scope, cost, and schedule.

Interfaced with Exterran product lines (Compressor, process treating and production equipment).

Insured the project complies with Company's Engineering Standards

Supervised preparing requisitions for all purchased equipment and services to initiate the procurement process on all assigned projects.

Provided regular updates of engineering status, drawings, BOMs, engineering services to PM, Client and Construction contractor.

Provided staffing plan, man-hours and engineering cost estimate.

Ausenco (Formerly PROJEX Technologies) – Calgary, AB, Canada Jan. 2012 – Dec. 2013

Project / Process Engineer-Intermediate

Projects:

Statoil SAGD Project: FEED and Detailed Engineering of production 10 K BPD

Statoil Wellpad Standardization Project (WPS), and Statoil Maintenance Capital Project (SAGD): Heat Medium Package Modification.

JACOS Pipeline Crossing of Highway 63: Hangingstone Expansion Projects.

Altex Energy: Falher Bitumen Truck-railcar terminal.

Responsibilities:

Developed and reviewed DBM, FEED, SOW, Data sheets, PFD, P&ID, Tie-in List and LDT, operating procedure, shutdown keys, and performed risk assessment for process conditions.

Involved in completion of documentation of FWPs, EWPs, IFP, IFQ, and Bid Evaluations.

Interface with client and vendor for project deliverables.

Participated in HAZOP study, 3D Model review, Internal and Vendor Squad Check, reviewed and checked vendor drawings and Calculation.

Performed process simulation using HYSYS, process calculation, PSV sizing, piping hydraulics (line sizing), equipment (Tank, vessels, pump, compressor etc.) sizing etc.

PROCESS DESIGNER

Excelsior Engineering Ltd. Calgary, AB, Canada July, 2010- January, 2012

Developed PFD, P&ID, Plot Plan, LDT, Tie-in-list and As-built drawings.

Designed piping systems for gas gathering, gas plant and refining industries and co-ordinate design criteria with other department in accordance with contractual specification.

PROCESS ENGINEERING SPECIALIST

Cub Engineering Ltd. Calgary, AB, Canada June, 2009- December, 2009

Developed and coordinated for PFD, P&ID, LDT, and TP list, performed process simulation using HYSYS, calculated line sizing, prepared and reviewed DBM and project costs estimates, performed hydraulic calculation, process calculations, and data sheet.

PRODUCTION TECHNOLOGIST

Clariant (Canada) Inc. Petrochemical Plant, Toronto, ON, Canada 2001-2007

Performed batch calculations, ensure raw materials for product quality, utilities consumption, developed the liquid distribution system, prepared and presented for approval, monitored and optimized the process, start-up, shutdown and feedback for the development of the process, safety and operation.

PROCESS ENGINEER

Urea Fertilizer Factory Ltd. Ghorashal, Bangladesh, 1995-2001

Conducted day-to-day process works of hydrogen. ammonia and urea processes

Involved with the start-up, shutdown, emergency handling and operator training procedures

Monitored the performance of exchangers, furnaces, separators and columns

Analyzed catalyst life, calculated material and energy balance, performance calculation, optimization and troubleshooting.

PROCESS ENGINEER

Bata Shoe Company Bangladesh Ltd. Bangladesh 1990-1995

Installed and commissioned polyurethane processing unit, completed the project on time and started production resulting in savings in both company time and money

Performed daily activities like material & energy balance, process efficiency calculation, overall utility balance, furnace and boiler efficiency, start-up, shutdown, emergency handling, productivity and quality assurance, improved process operation by introducing new mixing formulas and manufacturing procedures.

EDUCATION, TRAINING AND MEMBERSHIPS

B.Sc. Chemical Engineering, Bangladesh University of Engineering and Technology, Bangladesh, 1988

NG Processing Technology (ENCH-609), University of Calgary, 2009

Pipeline Integrity Management Program, University of Calgary, 2009

Process simulation (HYSYS), Southern Alberta Institute of Technology, 2008

Process piping designing, Southern Alberta Institute of Technology, 2010

Registered for PMP (Project Management Professional) Certification with PMI.

Applied for PE registration from Texas Board of Professional Engineers

Registered APEGA member (Membership # 142772)

Smith System Defensive Driver Training: 2015

Emergency First Aid, H2S Alive, WHMIS, PPE, HSE and Fire Drill.

Corporate Readiness Training Program: Bow Valley College, Calgary: 2008

REFERENCES AVAILABLE UPON REQUEST

Rafiq Islam 832-***-**** (Cell)



Contact this candidate