Post Job Free
Sign in

Electrical Engineer Maintenance

Location:
Saudi Arabia
Posted:
December 10, 2015

Contact this candidate

Resume:

Visa Status Transferable

RASHID KHAN

Mobile: +966-**-*******/ +92-323-*******

Email: **************@*****.*** / ******.****@**********.*** Skype: rashidkhan011274

ELECTRICAL ENGINEER

INTRODUCTION

Accomplished, proactive engineer with more than 14 years of significant experience in Construction, Supervision, Testing, Design, and Operation & Maintenance of different areas as following: Industrial Project, High Rise &Commercial Buildings, Grid Station / Sub-Station project, Gas Insulated Substation Project, Over Head Transmission & Telecom Sector. Core competencies and professional strengths include:

Supervision / O&M

Project Management

Bidding /

Documentation

U.A.E / K.S.A Experience

Subcontractor / Crew

Supervision

Fast Learner / Cost

Controls

Construction / Schematic

Drawings

Safety Compliance

Report Preparation

KEY STRENGTHS

Hands-on experience of Execution, Supervision, O & M of MV & LV Electrical Switchgear.

Depth knowledge in Operation & Maintenance / Supervision of industrial Plant / GIS.

Strong experience of Operation & Maintenance of power distribution system & Sub-Station.

Ability to work independently can perform better when placed in team.

Proven strength in problem solving, co-ordination & analysis. KEY PROJECTS

Operation & Maintenance of of Power Distribution Station & Gas Insulated Substation of Arab Steel Company- Dammam, KSA.

O&M & Installation & Electromagnetic Interference sheet work for DATA Center Project- Islamabad, Pakistan.

Electrification, Equipment Installation, MV & LV Cable Laying & Termination works for Amreli Industrial Project- Karachi, Pakistan.

Aerial Bundle Cable & Smart Energy Meter O&M & Installation works for ABC Project of WAPDA-Hyderabad, Pakistan.

Operation & Maintenance of BTS sites of Warid Telecom, Pakistan.

Operation & Maintenance and Installation work done on Nineteen (19) Sub-Stations of 11 KV Project-Islamabad, Pakistan.MV & LV Switchgear Installation works for Arab Steel GIS Project- Dammam, KSA.

Electrical Design / Supervision works for Al-Ikhlas Tower 23 Story Building in Sharjah, UAE.

Electrical Design / Supervision works for ARY Business & Avenue 2B + G+ 2 Story Building in Dubai, UAE.

Electrical, & Fire Alarm / Emergency Lighting works for Ware House G + M JAFZ in Dubai, UAE. CAREER PROGRESSION

Electrical Engineer May 2013- Present

Arab Steel Plant of Al-Tuwairqi Holding Company,Dammam,KSA Working in Electrical Maintenance Department.

Project Engineer April 2009-April 2013

General Electro-mecanique Pvt. Ltd, Karachi

Project Electrical Engineer March 2008-March 2009

Consultair-MEP Consultant & Engineers, Dubai-UAE

Client: Al-Thuraya Company

Executive Electrical Engineer Dec 2005-March 2008

Warid Telecom Pvt Ltd, Karachi

Electrical Engineer June 1999-Dec 2000

Project Management Organization, Islamabad

Assistant Site Engineer (Electrical) Sep 1995- May1999 General Electro-mecaniquePvt. Ltd, Karachi

EDUCATIONAL QUALIFICATION

BACHELOR OF ENGINEERING (4-years) IN ELECTRICAL/ELECTRONICS Allama Iqbal Open University, (IET Campus) Islamabad DIPLOMA OF ASSOCIATE ENGINEER IN ELECTRICAL TECHNOLOGY Sind Technical Board, (JPT Institute) Karachi

JOB RESPONSIBILITIES

Supervised the Installation & Commissioning of Following:

MV / LV Switchgear

AC / DC Panels

Power Transformers

6.6/22/154/230KV

Substation

Load Break Switch

RMU / Bus-bar Riser

Smart Energy Meters

LDB / PDB / ATS

Telecom Equipment

HVAC Equipment

Electrification of Industrial /

Commercial Building

Distribution Transformers

Gas Insulated Substation

Control & Protection Panels

Electromagnetic Interference

sheet

MV / LV Cable Laying

Low Current System

Smart Energy Meters

Over Head Transmission Line

MV / LV Cable

Termination

Battery Chargers /

UPS

Generators

Battery Bank

Emergency Lighting

Cable Tray / Raise

Floor

Control Cable

Earthing& Lightning

Protection System

Supervision & Design Responsibilities are Following:

Calculation of Maximum power & load assessment calculation.

Thorough study of the design and construction drawings related to the structural, architectural and MEP services.

Responsible for Design / Supervision of electrification work for high rise & commercial buildings.

Preparation of SLD (Single Line Diagrams), load schedule & summary.

Space Management.

Visiting the sites for supervision and execution of the MEP services as per the approved drawings and the site conditions.

Attending the meetings with client and other representatives on site for the progress and coordination of various services related to the project.

Approval of the shop drawings and the material submittals.

Work within a multi-cultural environment & communicate effectively with the PM and site installation team & sub-contractors.

Monitors and evaluates the performances of project contractors.

Preparing the snag lists prior to the commissioning process.

Calculation of Distribution Transformer &Emergency Load for Generator Capacity.

Coordination with others Engineers and installation team.

Reviewing of the material submittals as per the specifications and relevant standards.

Carrying out the commissioning of all Electrical, Low Current, Telecom and Fire Alarm services and handing over the project to the client.

Supervise the Installation, Testing & commissioning of electrical services, low voltage panels, Lighting, power sockets and power cables for High Rise & Commercial buildings project.

Prepare Bidding & Pre-qualification document work.

Prepare Invoices for the construction work.

Operation & Maintenance Responsibilities are Following:

Supervised the all operation & Maintenance activities in Main Power Distribution Station & Main Substation / Gas Insulated Sub-Station.

Making Plan of Preventive Maintenance schedule.

Prepared the format of Inspection Reports / Daily Checklist / Daily & Monthly Power consumption reports of all equipment.

Hands-on experience & knowledge of HMI control system with Siemens PLC Simatic S7-300 & WIN CC for operation computers.

Prepared the SOP (standard operating procedure) for all equipment.

Fault Rectification & trouble shooting in electrical system.

Servicing & installation of Pressure Switches/Gauges, Limit Switches, Solenoid Coil, oil & water Heater panels & photocell.

Operation & Maintenance work of 0.4/6.6/22/154/230KV Substation.

Preventive & Corrective maintenance & Troubleshooting in Substation.

Operation & Maintenance of Power Transformers 30/40MVA, 140/160MVA & 300MVA.

O & M of Dynamic Static Var Compensator, Battery Banks, UPS, Air Handling Unit, Motors, Auxiliary Transformers, Generators, AC / DC Panels & LV / MV Switchgear.

Operation & Maintenance work of 230KV Siemens GIS &154KV XI’AN SHIKY GIS.

Able to perform SF6 Gas filling, removal & evacuation work in Gas Insulated Substation.

Maintained demand & issued spares record.

FOLLOWING TEST PERFORMD

Insulation Resistance Test / Contact Resistance Test.

Power Quality Analysis.

Thermal Image / Infrared Test.

Transformer Turns Ratio / Winding Resistance Test.

Oil Di-Electric Strength Test.

High Potential Test / Circuit Breaker Timing Tset.

Primary & Secondary Injection Test /Earthing Resistance Test. COMPUTER SKILLS

MS-Office, Internet & Auto Cad.

PROFESSIONAL AFFILIATIONS

PEC - Pakistan Engineering Council

IEEEP - International Electrical & Electronics Engineering Pakistan TRAINING

Distribution System Operation & Maintenance from German Agency for Technical Cooperation PERSONAL DETAILS

Father’s Name Sarfaraz Khan

Marital Status Married

Nationality - Religion Pakistani – Islam

Current Location Al Khobar City, Kingdom of Saudi Arabia Driving License 5-years valid in Saudi Arabia

REFERENCES:To be provided if required.



Contact this candidate