KIRAN PILLI
Plano, TX ***** *********@*****.*** Cell # 469-***-****
SUMMARY:
Seasoned professional with 16+ years of national and international experience in the mobile telecom industry. Extensive experience in Transport/Transmission (Microwave Backhaul & Optical Fiber) in Network Planning & Design, optimization, Implementation and Operations for GSM (2G), UMTS (3G), WiMax & LTE (4G) Small Cell and Wi-Fi networks.
Specialties:
Cell Site/BTS Services
Microwave Backhaul Engineering Services
Optical Fiber Access & Backbone Network Services
Technical Training
Project Management
Team Management
Mobile Technologies:
2G/3G/4G WiMax/LTE, Wi-Fi, Small Cell, RAN, Mobile Transport, SDH/SONET, NMS, NOC, Granite/Xng, NRM, Clearvision, Business Intelligence, Telecom / Data Analytics.
Area of Expertise:
IP Backhaul Microwave:
Planning & Designing, Implementation and Operations - Licensed and Un-Licensed Radios.
Licensed Radios:
Minilink TN, LH & PT – Ericsson, DragonWave, Ceragon, E-Band & BridgeWave, Flexi Hopper – Nokia, Alcatel MDR 8000 & 4000, P-COM – Lucent, NEC, NERA, Harris.
Unlicensed Radios:
Motorola PTP-600, Redline, Exalt, Proxim Lynx SC, Adtran Tracer.
Circuit Provisioning:
Experience in Granite 6.3/XNG (T-Mobile Inc), Clearvision (Clearwire Inc), NRM (Sprint).
Equipment Building, Circuit segments, circuit paths, Mapping.
Provisioning – Leased Bandwidth Facilities:
Experience in Bandwidth Planning and forecasting - DS1, DS3, OC3.
Optical Fiber Backbone & Access Projects:
SDH/SONET (OC-3, OC-12, OC-48, OC-192)
Planning, Designing, optimizing, Implementation, Testing and Operations.
Built Optical fiber backbone route around 6,000 Kilometers and 110 ADM Backbone nodes.
Built NMS and Network Operation Center (NOC).
Generated SOW’s, MOP’s, BOM’s.
Working Knowledge of optical add/drop multiplexer (OADM) systems, and reconfigurable optical add/drop multiplexer (ROADM) systems.
Copper Plant:
F2 Conditioning – Lightspeed Project.
Testing:
Tested Trans & Receive Power, Bit Error Ratio, Jitter, Dynamic Range, Tandem Testing, Mapping & De-mapping, Fiber Link test etc.
Surveys:
Done numerous site surveys like Line of Sight (LOS), Redline, As-Built, Space & Power, Surveys for Structure Analysis & Load Analysis.
Professional Career:
Subject Matter Expert - Microwave Backhaul Mar 2015 to Sep 2015
& Fiber Solutions
Nexius Inc, Allen, TX, USA
Roles and Responsibilities:
Provide Technical Sales support, complex Network roll-out, Services Delivery excellence and Customer Network Support.
Life-cycle and associated business processes; initiation (pre-sales support), through planning, execution for network rollout and integration, and closing with successful handover to customers.
Understanding customer’s business needs and drives and translating that into network solution offering that adds value to customer.
Subject Matter Expert - Microwave Backhaul Feb 2011 to Feb 2015
Ericsson Inc, Plano, TX, USA
End Clients: Sprint (Network Vision), metroPCS (4G LTE), LA-RICS (LTE)
Roles and Responsibilities:
Primary responsibility for all aspects of backhaul design for LTE-based public-safety broadband network for Los Angeles Regional Interoperable Communication System Authority (LA-RICS), Los Angeles Market through Motorola Solutions Inc.
Created strategies to effectively design and methodology of microwave backhaul network.
Lead Responsibilities in MW Backhaul Engineering Group - 14 Markets/12 States in US and 4,500+ LTE sites for metroPCS LTE project.
Developed design guidelines.
Delivered customer facing presentations for network design solutions.
Presented all new network design solutions to customer senior management “CTO, VP and Directors”.
Managed and trained a team of 34 design and support engineers to improve their efficiency and meet design guidelines.
Developed microwave designs, using licensed frequencies, which support the deployment of next generation 4G wireless broadband network by utilizing software propagation/planning tool PathLoss 5.0, along with defined design standards and link budgets, to create high quality microwave designs for Sprint Network Vision Project.
Reviewed and redlined ZD drawings for zoning and leasing process.
FCC/ PCN for microwave path licensing.
Built a strong design architecture that maximizes performance, link availability, and provides redundancy/diversity while also meeting budgetary objectives.
Worked closely with market project managers and monitored progress and quality of path surveys.
Effectively managed design projects and any issues that arise to insure that they meet aggressive deployment timelines
Senior Microwave Engineer Feb 2009 to Dec 2010
Clearwire Inc, Philadelphia, PA, USA.
Project: WiMax (4G) Project.
Roles and Responsibilities:
Designing licensed microwave packet radio for transport and access rings for CLEARWIRE WiMax 4G network for Philadelphia, Trenton and Wilmington Markets.
Optimizing performance, link budget availability, and route diversity and redundancy for licensed 11, 18, 23, and 80 GHz band frequencies using Pathloss 4.0 program.
Designing different microwave topology using Pathloss 4.0 program.
Participate in the search ring process for RF and microwave radio optimization.
Used vendor selected licensed DragonWave Horizon Duo and E-Band Packet Radio for Transport/Access rings. Motorola PTP 600, Redline Communications for spread spectrum technology.
Reviewing Line-of-Sight survey report from Nexius, WNG contractors.
Reviewing and redlining ZD drawings for zoning and leasing process.
FCC/ PCN for microwave path licensing.
Equipment Building, Circuit segments, circuit paths, Mapping in Clearvision.
Regional Microwave Engineer Jun 2008 to Dec 2008
T-Mobile Inc, Bothell, WA, USA.
Project: UMTS (3G) Transport Planning, Design & Circuit Provisioning.
Senior Microwave Engineer Oct 2007 to Apr 2008
Ericsson Inc, Plano, TX, USA
End Client: Sprint. Project: WiMax (4G) Project.
Design Engineer Jun 2007 to Oct 2007
AT&T Inc, San Jose, CA, USA.
Project: Lightspeed (FTTH)
Site Auditor Apr 2007 to Jun 2007
Ericsson Inc, Pleasanton, CA.
Project: GSM Sites Expansion with UMTS
Senior Engineer – Transmission Planning & Projects Mar 2004 to Mar 2007 Hutchison Essar South Limited, Hyderabad, India. (Now Vodafone, India)
Project: Fiber Optic Planning & Projects and Microwave Planning & Design
Project Consultant Jul 2003 to Mar 2004 United Engineers, Hyderabad, India.
Project: GSM Projects
Telecom Engineer Nov 2001 to Jun 2003
Seder Telecom, Kingdom of Saudi Arabia.
Client: LM. Ericsson, Kingdom of Saudi Arabia for GSME4, GSME5 Projects.
Project #1 Operation and Maintenance of RBS2202/200 and Minilink C/E, P-COM, Harris access networks.
Project #2 Cell On Wheel - COW Special Events
Engineer – Transmission Jun 2000 to Nov 2001
Bharti Telesonic Limited (BTSOL), Hyderabad, India.
Project: Optical Fiber Backbone Network in Andhra Pradesh State.
Site Engineer Jan 1998 to Jun 2000
S.V Constructions, Hyderabad, India.
Tools Used:
Pathloss 4.0 & 5.0 TEMS Link Planner 6.5.2 TEMS Cell Planner
DeLorme Topo USA 6.0 MapInfo Professional 12.5 Visio Professional
Clearvision – database tool NRM(Sprint) Granite 6.3
Xpercom Siterra Google Earth Pro
Nokia Flexi hopper Manager Ericsson OMT Software Site Master
Digital Transmission Analyzer BER Tester: ANT-20 Splicing Machine
OTDR Tester Frequency Counter Variable Attenuator
MS Excel Google Earth Pro Laser Rangefinder
Garmin e-Trex with WAAS enabled Hand-Held Compass
Training:
Fundamentals of DragonWave Horizon Duo DragonWave, Philadelphia,USA
FiberAir RFU-C Maintenance Ceragon, Philadelphia, USA
ARES (AT&T plant records system) AT&T Inc, California, USA
Minilink access network HESL, Hyderabad, India
Installation and Commissioning of Flexi hopper HESL, Hyderabad, India
Installation and Commissioning of MW Radio HESL, Hyderabad, India
SDH/SONET Agilent Technologies, Gwalior, India
STM-64/16/4/1 ECI, Mumbai, India
OTDR Agilent Technologies, Gwalior, India
Splicing Machine Agilent Technologies, Gwalior, India
GSM system survey AIRTEL, Hyderabad, India
RBS Maintenance (RBS 2202, 2206) HESL, Hyderabad, India
Education:
Graduation Bachelor of Engineering in Electronics & Communications Engineering
University Osmania University, Hyderabad, India – (1991-1995)
Degree received in June 1995.
Post-Graduation Master of Business Administration in Marketing
University Andhra University, Visakhapatnam, India – (1995 – 1997)
Degree received in August 1997.