Post Job Free
Sign in

Plant Construction

Location:
Hants, United Kingdom
Posted:
December 07, 2015

Contact this candidate

Resume:

john Hunter

** ****** ******,

Kincardine

Alloa, FK10 4NL

Telephone: (01259)731643

Mobile: 075********

Email:acsp03@r.postjobfree.com

Professional Experience

Babcock Marine

Rigger

**/** - ****ent

Fleeting of materials and equipment on the new aircraft carriers using chain blocks, pull lifts and tirfers. \crane work with mobiles, pedestrian and Goliath cranes. Heavy engineering environment with large lifts and awkward confined spaces.

MacCarthy and Stone

Slinger/Banksman

10/12 - Present

Slinger for a tower crane. Installing concrete slabs, steal and safe movement of plant and materials. Job is in Edinburgh within a very tight site. Also responsible for safe entry and exit of articulated lorry deliveries.

Graham Construction

Slinger/Rigger

10/12

Installing steal gantries on the M90 motorway. These were 60 tons in weight using 150 and 250 ton mobile cranes. Responsible for rigging<slinging and directing the crane driver. The job was done nightshift in a live motorway environment.

Clients are transport Scotland.

XL Cladding

Slinger/Rigger

09/12

Responsible for rigging and slinging 7m GRP beams inside an absorber tank using chain blocks and flat web slings.

Clients are Scottish Power.

ABC Recruitment

Slinger/Banksman

07/12 – 09/12

Responsible for setting up a mobile asphalt plant at Edinburgh Airport for a large civils project. Helping engineers set out taxiway and runway on the airfield.

Client was Lagan Construction.

Jasko Construction Reinforced Concrete Contractors

Slinger/Banksman

03/12 – 05/12

Slinger/Banksman working on a large bio mass power station. Sub contracted to build concrete silos 17m high using a 5 ton pedestrian crane and 50 and 80 ton mobile cranes for concrete pours, shuttering systems, plant and materials. Also responsible for enforcing strict exclusion zones as there were many cranes operating in an enclosed area. Client was Jacobs Infrastructure.

Campion Homes

Slinger/Banksman

09/11 – 12/11

Slinger/Banksman on a new build housing project.

Duties were slinging and timber kits for erection by joiners and movement of plant and materials using a 50 ton mobile crane and tele handler.

PC Harrington Civil Contractors

Slinger/Banksman

07/11 – 08/11

Slinger/Banksman on a substantial retail development.

Responsible for using tower and luffing cranes for concrete pours, shuttering systems and movement of plant and materials.

Client Sir Alfred MacAlpine.

McTaggart and Mickel

Slinger/Banksman

04/11 – 07/11

Slinger/Banksman on a new build flat development.

Duties included slinging of timber frame kit, movement of plant and materials using a 50 ton mobile crane.

Millar Callaghan Engineering Services

Slinger/Banksman

02/11 – 03/11

Slinger/Banksman on Forth Road Bridge.

Job involved movement on steel using a 5 ton hoist.

Steel was flat bar, angle, jacking brackets and plant hoisted from the ground to underneath deck of bridge at viaducts.

Client was Balfour Beattie.

Stewart Milne Construction

Slinger/Banksman

10/10 – 01/11

Slinger/Banksman on job in Edinburgh.

Job was construction of a wet pour concrete super structure using an 80 ton mobile crane.

Responsibilities included guiding crane in for concrete pours, peri shuttering systems and movement of plant and materials.

Kanes Brook developments LTD

Slinger/Banksman

09/10 2 weeks

Slinger/Banksman on job at new wing of Shotts Prison.

Responsible for using an 80 ton mobile crane.

We were erecting perimeter walls, which were 16 feet high and 5 ton in weight. Also movement of plant and materials.

Client was Carillion.

Madden Contracts

Slinger/Banksman

09/10 1 week

Slinger/Banksman on job on Southside of Forth Road Bridge.

Installation of 90 m steel disabled ramp.

Duties included rigging, slinging and signalling of steel for 80 ton mobile crane.

Client was Balfour Beattie.

Millar Callaghan Engineering Services

Slinger/Banksman

04/10 – 08/10

Slinger/Banksman for steel erecting job on Forth Road Bridge.

Responsibilities included slinging steel and materials under deck of bridge and signalling crane, hi aba and hoist operators and safe movement of materials.

Client was Balfour Beattie.

Merrit Merrel Enigneering

Slinger/Banksman

01/10 – 03/10

Slinger/Banksman on a clean room build in Glenrothes.

Duties were safe movement of plant and materials.

Professional Development

CPCS slinger signaller NVQ level 2 controlling lifting operations

CITB confined spaces trained

Amec confined spaces trained

CITB traffic marshall

GSAT airport security

Full uk airside security cleared

Airport fire safety course

Disclosure Scotland

Other Information

Own transport and willing to travel.

Personal Details

Date of Birth 07:11:79

Nationality British

Marital Status Single

Driving Licence Yes Clean

REFERENCES

Graham Clarke

Site Manager

Lagan Construction

Mobile: 079********

Colin Martin

Contracts Manager

XL Cladding

Mobile: 079********



Contact this candidate