My name is Ismael C. Rosales, and I would like apply for any job position in AUTOMATION/CONTROL & INSTRUMENTATION ENGINEER for your company.

I am sending my resume in the hope that my qualifications and experience may best suit the requirements of your company.

My work background covers exposure in both onshore and offshore field in Oil and Gas Production, Refinery, Petrochemical, Smelter, Pharmaceutical, Power Plant, Utility and Water Treatment Facility I have been involved in project during definitions stage, site survey, feed engineering, detail engineering, site supervision. FAT/SAT test and site implementation from construction, installation, inspection, startup and commissioning period. Kindly see my attached CV for additional information on my experience. I can reach anytime thru email at *********@*****.***

Thank you very much for your time and consideration. I look forward to speaking with you about this employment opportunity.

Best Regards,

Ismael C. Rosales

Mobile No. +63-915-******* / 939*******

ICRosales

Page 2 of 7, 2015

Resume of:

Ismael C. Rosales

Batangas City, Philippines 4200

Mobile No. 0063-915-***-**** / 939*******

e-mail Address: *********@*****.***

Desired Position

AUTOMATION/CONTROL AND INSTRUMENTATION ENGINEER

OBJECTIVE:

To contribute strong background in DCS, Instrumentation/Electrical and Control, along with the unique drive for excellence and success and to render any service in fulfilling one company’s mission and reaching its vision and confidence to your company in a Instrumentation and Control Engineer capacity. To ensure that all control and instrumentation works, assemblies or fabrications are executed in accordance with the drawings, documentation, specifications and design basis consistent with Company requirement, procedures and practices.

WORKING SUMMARY:

Almost 16 years experienced in project of Oil and Gas, and Utilities, Refinery, Petrochemical, Pharmaceutical, Power Plant. A well trained and experienced in Project Engineering, Construction, Commissioning, Start up and Installation and Supervision. A team player, possessing the maturity in decision making and supportive on corporate goals. A Hardworking, resourceful and continually looking for improvement. Committed to positive attitudes of contributing learned skill. Extensive experience in DCS System and Hardware engineering, installation and start up. With knowledge in P&ID Interpretations, Instrument Loop Diagrams, Electrical Control Circuit Wiring Diagram and Relay Logic. Well understand Control Function and Logic / interlock architecture. Experienced in field instruments calibration and electrical equipment for Oil and Gas and Petrochemical Plant. Attend Project Sales support and Budgetary Cost during project proposal stage. Project/Design Engineer, responsible in preparation of basic and detailed engineering such as Junction Boxes & Panel Design, Hardware Specifications, I/O Sizing and Loading, Signal Flow Diagram, Grounding Scheme, System Cable Schedule, Motor Control, Termination Schedule, Staging, Internal Testing, FAT, SAT, as well as Installation of Instruments, DCS Cabinets and Consoles. With hands-on experienced both on Yokogawa DCS and Honeywell FCS systems, ABB DCS System and Siemens PLC. Well trained and experience in On-shore/Off-shore Facility. Experienced in aluminium smelter plant and ability to handle the different systems. Review Functional Design Specifications for the different systems assigned during project execution stage. Large contribution in Project Engineering Design and Construction, Inspection, Installation, Start-up and Commissioning stage. Strong experience in Feed Engineering and Detail Engineering design with the specialization with the use of AutoCAD all release version. Extensive experience in Engineering Design both Electrical and Instrumentation such as building control panel, field instrumentation design, marshalling cabinet, interposing relay panel, cable routing layout and other field instrument drawings, electrical control panel design. HMI Graphic Design experience (Yokogawa DCS System, Allen Bradley, Panel View Plus and Versa View) Experienced in both DCS and PLC communication such as Ethernet, Bus Net, Control net, Modbus, Profibus. Executes Plant Data Network and Telephone data access network configuration, cable/patching allocation during site implementation stage. Knowledgeable for design standards covering Instrument & Control Design/Engineering and the applicable standards such as API, IEC, IEEE, ISA, ISO, NACE, NFPA 70, 72, ATEX, NORSOK. Executes project engineering and installation work of DCS/PLC/SCADA/RTU Information system-oriented project from specify, design and generation. Study and prepare the Overall Network Diagram for data communication system for DCS, F&G, ESD, Vibration Monitoring System and Telecommunication System. Task included Site Supervision, Hot Cutover, System Start up & commissioning of big & small projects dealing with DCS and Safety Systems for Oil & Gas, in Offshore & Onshore based, has leadership good oral and written English technical communication skills, good knowledge of Yokogawa Distributed Control System (DCS) and has knowledge in Safety System (Fire & Gas). Prepare engineering documents/drawings like, Project Schedule, P & ID, I/O List, System Configuration, DCS Hardware Specification, Power Consumption & Heat Dissipation, Grounding Scheme, I/O Data Base, Panel Layout Drawing, Termination Drawing, Loop Drawing, Hook Up Drawing. Understands customer requirements using customer’s specification and conducting/attending technical clarification meetings for accurate customer requirements. Conducts factory and site acceptance test to ensure that the customer’s requirements are met. Responsible for supporting both manufacturing and marketing through performing a variety of assignments in developing (designs, improvement, testing, procedure) and implementing (training troubleshooting, continuous improvement, procurement) production and processing methods using proven techniques and practices to meet quality and safety standards in an efficiently manner. Project/Design Engineer, responsible in preparation of basic and detailed engineering such as Junction Boxes & Panel Design, Hardware Specifications, I/O Sizing and Loading, Signal Flow Diagram, Grounding Scheme, System Cable Schedule, Motor Control, Termination Schedule, Staging, Internal Testing, FAT, SAT, as well as Installation of Instruments, DCS Cabinets and Consoles. With hands-on experienced both on Yokogawa DCS and Honeywell FSC systems. Conduct final inspection of instrument installation, process tubing, airline piping, instrument cabling, installation and termination of Instruments, JB boxes and other control panels. Assist the project team in the inspection & Commissioning of the each of the respective elements of the project to ensure compliance with the contract. Generate punch list item and work list preparation for commissioning. Responsible for designing, developing, installing, managing and/or maintaining equipment which is used to monitor and control engineering systems, machinery and processes. ICRosales

Page 3 of 7, 2015

Prepared/generated various deliverables as per project specifications such as DCS, IPS & FGS Main Distribution Frame Panel (MDF) GA/IA Drawing, Power Distribution Panel (PDB) GA/IA Drawing, Power Distribution Panel (PDB) Wiring Diagram, Interposing Relay Panel (IPR) GA/IA Drawing, Interposing Relay Panel (IPR) Wiring Diagram, Earthing Scheme Layout. Conducted internal test and Factory Acceptance Test (FAT) involving DCS and other subsystems such as Instrumented Protective System (IPS), Fire & Gas System (FGS). Assist Functional Design Specification to describe Human Machine Interface (HMI) design for the on-going Project. Task included integrating the HMI System Design for both process and equipment displays with sub-vendor standard displays. Generations of graphics windows with consists of a schematic representation of a process section showing details of the equipment, process parameters and relevant control loops and process status. To develop the process graphics based on the graphics worksheet provided by the Customer with reference to the basic guidelines. Produce engineering design deliverables associated with instrumentation upgrades for Oil & Gas onshore and offshore production platforms. Ability to develop engineering design in DCS, Data Communication and Telecom system. Review and check the engineering design in the terms quality and requirement based on the project specification and requirements for Aluminium Plant. Conduct site construction inspections activity in all different areas based on the package system. Discuss and coordinate in any technical issues to main contractor and EPC as well as to the sub-contractor for all related system based on the standard requirements of the project. Participate in the review of Engineering standards and specifications. Reviews conceptual and detailed designs of plant changes and projects prepared by engineering department which are related to control systems. Participates in factory acceptance tests (FAT), commissioning and takeover of new control systems projects. Prepares conceptual and detailed designs for instrument related projects and plant changes.

RECORD OF EMPLOYMENT:

ICSS CONTROL SYSTEM / INSTRUMENTATION DESIGN ENGINEER (DE-IV GL20) FLUOR DANIEL INCORPORATION

Filinvest City, Alabang Manila Philippines February 2014 up to present SINGAPORE LIQUIFIED NATURAL GAS - PHASE 3 TERMINAL PROJECT Jurong East, Singapore Handling engineering review documents for control and instrumentation, telecoms, fire & gas, detection system and other deliverables and packages. Checked technical bid evaluation for all type of instruments datasheet. Liaise and reviewed with other discipline for the alignment of control & instrumentation deliverables in reference to the project scope and requirements. Ensure the design and engineering deliverables are complying to project standard requirements and customer need. Conduct model review for the control and instrumentation to follow the proper installation requirements. Analyze and check the maintainability of the systems for the purpose of maintenance and operation access during online plant service. Conducts inter discipline check and review of design documents for Electrical, HVAC, Mechanical, Architectural, Piping, Civil and HSE Team as part of the quality system requirements. SANTOS LIMITED - GLADSTONE LIQUIFIED NATURAL GAS PROJECT Queensland, Australia Designing and developing new control systems; testing, maintaining and modifying existing systems; Task includes analysing data and presenting findings in written reports. working collaboratively with design engineers, operation engineers, purchasers and other internal staff, liaising with clients, suppliers, contractors and relevant authorities Provide project management within cost and time constrained environments. Handling troubleshooting and problem solving solutions. Provide good understanding and ensuring compliance with the health and safety regulations and quality standards of the country in which work is undertaken. Providing advice and consultancy support, purchasing equipment, writing computer software and test procedures. Handling and review the deliverables of instrumentation and control documents e.g. Functional Descriptions and Control Narratives, Instrument Engineering Index, Instrument Wiring, Datasheets, Constructions drawings and other related documents for workpack deliverables. ICSS CONTROL SYSTEM / INSTRUMENTATION DESIGN ENGINEER (DE-IV GL20) TENARIS INGENIERIA – EXPANSION SEAMLESS PIPE MILL PROJECT Tenaris City, Texas U.S.A. The scope of this project covers the Plant Utiliies, in two major process areas the HEAT Treatment and Premium Threading Facilities. Ensure all specified instruments and control systems requirements defined is within the job order and according to Fluor Control System scope of work and comply with the design standards and engineering practices in order to meet the project requirements. Also handling quality and assurance review for all datasheets specification and based on the various selection of instruments and process application that governed by several factors of instruments system and control systems. Identify the instruments system quality and types furnished shall normally be the manufacturers standard and meet the requirements of the applicable instruments specification for the project. SENIOR CAD/SP3D DESIGNER

MITSUBISHI HEAVY INDUSTRIES ENG’G SERVICES/J&S CONSULTANCY SERVICES CO.INC. Makati City, Philippines April 2013 – February 2014 NORTH AMERICAN GROWTH (NAG) – OLEFINS RECOVERY PROJECT Baytown Texas, USA TATARSTAN AMMONIA FERTILIZER (TAF) – UREA FERTILIZER PLANT PROJECT Tatarstan, Russia Prepare and deliver instrument/electrical design specifications/ work according to the client's strict requirements. Assist technical support and drafting services if required to the team or other discipline teams. Handling to generate instrument index, wiring and loop sheets. Prepare all basic and preliminary drawings. Arrange all work packages drawings for deliverables related to Instrument and Controls work and others issuance details drawings. Assist other discipline for ICRosales

Page 4 of 7, 2015

developing of others details drawings for mechanical, piping, structural designs. Developing Interconnection diagrams for junction boxes, marshaling cabinets etc. Preparation of Instrument location plan, Instrument Loop Diagram. Electrical

& instrument interface drawings. Liaise with other disciplines for interface drawings e.g. Piping, Mechanical, Structural and Electrical.

SENIOR INSTRUMENTATION/ELECTRICAL DESIGN ENGINEER

REPSOL/AKAKUS OIL OPERATION - GAS & OIL SEPARATION PRODUCTION (GOSP) Tripoli Libya April 2012 – January 2013

Working within the Engineering Department in design and engineering initially responsible for all instrumentation and electrical project activities relating to the design installation and commissioning of produced water treatment and water injection facilities in NC-115/186 Gas and Oil Separation Production (GOSP) and front end (FEED), Zawia new storage tanks and detailed Engineering for NC-115/186 small fields (Gathering Stations) A, B, D, J and K fields and technical support for field construction & maintenance activities. Review technical and commercial proposals prior to the final submission to vendors or EPC contractors. Responsible for all instrumentation project activities relating to the design, installation and process engineering activities relating to the front end (FEED) and detailed Engineering for O&P and GOSP fields in NC-115 and NC-186.

AUTOMATION / INSTRUMENTATION ENGINEER

QATALUM ALUMINUM SMELTER PLANT PROJECT

Mesaieed, Doha Qatar May 2009 – February 2012

Study and review all the project engineering design during construction phase. Review all the materials specifications as per functional requirements and systems requirements. Assist instrumentation engineer in checking of I/O signals from field devices to PLC System. Checking of all industrial network equipment and communications link (PLC Cabinet, I/O Rack, Control Net, Device Net, Profibus, ASI-bus). – Allen Bradley, Siemens, ABB. Review all the system architecture diagram based on the system areas of responsibilities. Supervision of contractors for on-going constructions and installation of field instruments, junction boxes, field control panels, plc cabinets and other related interfacing system equipments. Review all datasheets, documents and drawings on the assigned system areas in WWTS, LPS, ESD, SS, SDS, and Alumina and Coke System. Supervision of interfacing panel from SAS system to other system such as Common Logic Panel in rectifier substation. Identify the Instrumentation and Controls requirements for mechanical packages. Review the P&ID’s in the different location of instrumentation installed in the field. Prepare internal review for all documents and engineering design made by the contractor during constructions and mechanical completions stage. Provide technical assistance and guidance to the contractor during construction and installation stage. Attend technical meeting on behalf of the Lead Discipline Automation and see to it that system activities are complying with the requirements and standard specifications. Help other concerned department in drafting the necessary reply for the benefit of the Company as a whole. Analyze different systems interfacing to main PLC control system (Allen Bradley – Control Logic) during construction and commissioning phase. Review of Engineering Drawings and Documentations (Installation details, Method Statements, etc).Performs hardware specification review/approval (Transmitters, Control Valves, etc). Provides instrument measurement application, guidance/review/approval (levels, flows, temp, etc). Overseeing construction activities of contractor and QA/QC activities (documentation, calibration, installation, loop check, as-built drawings, etc). Responsible for the supervision of different system areas such as Waste Water Treatment, Vacuum Station, Irrigation Water System, Material Handling System ESD System for rectifier and crane for reduction area. Assist contractors to facilitate site activity and installation of instruments, control panels, cable tray, distribution panel, HVAC control panel, fire & gas detection systems. Responsible for the implementation and plant integration of systems in a different areas such as process control network, telecom network, F&G system integrated to HVAC system (SAS net, IS/IT backbone net and Cu cable net(e.g. LAN,SAS, PDCS etc, redundant systems; power, UPS, Networks (both Cu and fibre) SAS, PLC’s etc. Review of As-Built documents activity for Qatalum Smelter and Power Plant. SENIOR INSTRUMENTATION AND CONTROL AUTOMATION DESIGNER WORLEYPARSONS - OFFSHORE SAFETY SYSTEM & DCS UPGRADE PROJECT/ FLOWLINES HOOK_UP PROJECT (OCCIDENTAL PETROLEUM (OXY) QATAR) Doha, Qatar June 2007 – May 2009 Conduct site survey for gathering of data’s which include production of destruct packs, block diagram (broken down into instrument cable schedule, block diagrams to cover approximately 1600 hardwired I/O points). Provide cable routing for all new wiring installations and replacement cable trays and junction box installations shall be prepared for connections during the installation and commissioning phase of new systems. Provide all required drawings and documents for the changeover of the existing PS-1 F&G and ESD System. This changeover includes the existing MSA F&G panels in the auxiliary room of PS-1G (existing main F&G panel) with new SIL 3 Safety System. Undertaking Senior design engineering role on Flow lines Well Hook-up activities for OPQL’s (Occidental Petroleum of Qatar Ltd) ongoing development of the IDD El Shargi-North & South Dome Fields Remote Wellhead Jackets. Review & update basis of design book as per client requirements. Offshore survey to assess required modifications and new installations. Prepares survey reports and pre- invest and/or shutdown hook-up work pack to suit required wells Production and/or Water Injection Duty. Coordinates with the material controllers to ensure the availability of construction & installation materials required for each well hook-up. Seconded to OPQL (Occidental Petroleum of Qatar Ltd) and played an important role for Operation Support Team under the Facilities Engineering. Identifies key facilities technical information and ensures the accuracy, availability and accessibility of as-built documents. Incorporate as-build redlines marks and validates project work pack received from offshore handover packs thru workbooks-WB. Site as-building of E&I drawings as required. Produce Approved for Construction (AFC) instrumentation and control system deliverables as per project scope. Conduct site surveys to identify the scope of work to be done. Prepare interfacing design from DCS System and Telecom Communication System. Attend ICRosales

Page 5 of 7, 2015

the training course for H2S, PTW and HUET training a prior to Site Survey activities. Conduct project definition phase based on the customer requirements and Project Scope of Work. DCS / INSTRUMENTATION / START-UP / COMMISSIONING PROJECT ENGINEER YOKOGAWA ENGINEERING ASIA SINGAPORE / YOKOGAWA PHILIPPINES INCORPORATION BEDOK Singapore January, 1997 - April, 2007

Attend technical clarification meetings in order to prepare a functional specification like panel design installation standard, material selection, power consumption calculation & sizing, start-up and commissioning procedure. Preparing of engineering data, documents, drawing detailed and basic design of DCS hardware specification, system configuration, termination drawing, grounding scheme, P&ID, I/O list, power supply & grounding diagram, termination & cable schedule. Task included Site Supervision, Hot Cutover, System Start-up & commissioning of big & small projects dealing with DCS and Safety Systems for Oil & Gas, in Offshore & Onshore based. Responsible for supporting both manufacturing and marketing through performing a variety of assignments in developing (designs, improvement, testing, procedure) and implementing (training troubleshooting, continuous improvement, procurement) production and processing methods using proven techniques and practices to meet quality and safety standards in an efficiently manner. Experienced in both DCS and PLC communication such as Ethernet, Bus Net, Control net, Modbus, Profibus. Handling different control system equipment such as Centum CS 3000 integrated production control system (w/ Vnet/IP incorporating with foundation Field bus and Hart Interface.) Centum VP and Centum CS 3000 R3 migration. ProSafe-PLC/RS - PLC controller with the RS Safety Control Station (SCS) FastTools SCADA for centralized supervision and operation, Stardom - network based control system. Executes Plant Data Network and Telephone data access network configuration, cable/patching allocation.

PROJECT ACCOMPLISHMENTS:

ABU DHABI GAS INDUSTRIES LTD. - GASCO TRAIN-3 NGL PROJECT RUWAIS ABU DHABI U.A.E June 2006 – April 2007

PETROCHEMICAL CORPORATION OF SINGAPORE PTE. LTD. - PCS II PROPYLENE PLANT 100 AYER MERBAU ROAD, SINGAPORE 628277 May 2005 – May 2006 ETHOXYLATES MANUFACTURING PTE. LTD. - EMPL DCS REVAMP PROJECT 100 AYER MERBAU ROAD, SINGAPORE 628277 March 2005 – April 2005 ARABIAN PETROCHEMICAL COMPANY - PETROKEMYA POLYSTYRENE PROJECT JUBAIL, KINGDOM SAUDI ARABIA November 2004 – March 2005 PETROLEUM DEVELOPMENT COMPANY - PEDCO COMPRESSION FACILITIES PROJECT SIRRI ISLAND, PERSIAN GULF OF OMAN September 2004 – November 2004 SCHERING PLOUGH PHARMACEUTICAL COMPANY - API SYNTHESIS CCR5 EXPANSION PROJECT 50 TUAS WEST DRIVE, SINGAPORE 638408 June 2004 – September 2004 SCHERING PLOUGH PHARMACEUTICAL COMPANY - STEROIDS BAY 5 FACILITY DCS EXPANSION PROJECT 50 TUAS WEST DRIVE, SINGAPORE 638408 January 2004 – May 2004 SCHERING PLOUGH PHARMACEUTICAL COMPANY - MULTI-PRODUCT PLANT 2 PROJECT 50 TUAS WEST DRIVE, SINGAPORE 638408 January 2003 – December 2003 SAUDI EUROPEAN PETROCHEMICAL COMPANY - IBN ZAHR DCS REVAMP PROJECT JUBAIL, KINGDOM SAUDI ARABIA October 2002 – December 2002 PETROKEMYA ARABIAN PETROCHEMICAL COMPANY - PVC TRAIN A/B DCS UPGRADE PROJECT JUBAIL, KINGDOM SAUDI ARABIA May 2002 – August 2002 PASAR COPPER SMELTING COMPANY - POWER & WEIGHER MONITORING PROJECT LEYTE, PHILIPPINES (March, 2002 – May, 2002)

SIAM MITSUI PTA COMPANY - SMPC2 PROJECT BAGGING SYSTEM RAYONG, THAILAND (November, 2001 – January, 2002)

ABU DHABI GAS INSDUSTRIES LTD - GASCO DCS UPGRADING PROJECT RUWAIS, ABU DHABI U.A.E. July 2001 – September 2001 PT PUPUK ISKANDAR MUDA (TOYO ENGINEERING COMPANY) - PIM2 AMMONIA-UREA DCS PROJECT LHOKSEUMAWE, NORTH ACEH, INDONESIA December 2000 – April 2001 ABU DHABI GAS INSDUSTRIES LTD - GASCO RDCS PROJECT RUWAIS, ABU DHABI U.A.E. May 1999 – October 2000

ICRosales

Page 6 of 7, 2015

TITAN PETROCHEMICALS (M) SDN. BHD. - TPC-1 & 2 MIGRATION PROJECT PASIR GUDANG, JOHOR MALAYSIA May 1998 – November 1998 TUAS POWER LTD. POWER GENERATION UNIT 1 PROJECT

JURONG EAST, SINGAPORE January 1998 – March 1998

CALTEX OIL REIFINERY PHILIPPINES - RE-INSTRUMENTATION MODERNIZATION PROJECT SAN PASCUAL, BATANGAS PHILIPPINES January 1997 – May 1998 CAD DESIGNER

MODAIR MANILA COMPANY November 1996 – January 1997 MAKATI CITY, PHILIPPINES

CAD DESIGNER

BABCOCK HITATCHI PHILIPPINES October 1993 – October 1996 MAKATI CITY, PHILIPPINES

CAD DESIGNER

AG&P (ATLANTIC GULF & PACIFIC CO. of MANILA) March 1992 – September 1993 BATANGAS CITY, PHILIPPINES

CAD DESIGNER

PRODETECH PHILS. INCORPORATION January 1991 – January 1992 BATANGAS CITY, PHILIPPINES

TRAININGS & SEMINARS:

ROXAR MAXIMISING THE RESERVOIR, PROCESS PERFORMANCE & FLOW METERING HOTEL RAMADA PLAZA, DOHA, QATAR May 2008

The seminar that will cover the following topics; Roxar Oil in Water Monitoring System, Roxar Multiphase Flow meter, Roxar Wet-gas meters, Roxar Permanent Down hole Monitoring Systems Cameron Measurements Hotel Ramada Plaza, Doha, Qatar April 27, 2008 The seminar that will cover the following topics; Differential Pressure cone Meter for GAS Measurement & Scanner 2000

SAMSON AG, PREDICTING CONTROL VALVE RELIABILITY PROBLEMS & TROUBLE SHOOTING HOTEL RAMADA PLAZA, DOHA, QATAR May 2008

The seminar that will cover the following topics; Introducing SAMSON Technology; Globe Control Valves versus Rotary Control Valves; AC Trim System; Fire Save & Anti-Fire Lock; High End Application Valve Cost Saving Philosophies; SAMSON Valve Sizing and Plant Optimizing Program; CONVAL Graphic Support of multiple planning, Control Valve Sizing & Selecting Failures HELICOPTER UNDERWATER ESCAPE & SEA SURVIVAL

VGCT IASST DOHA, QATAR JULY 10, 2008 CERTIFICATE NUMBER: VGCT/57162/2008 July 10, 2008 Duration Date : 3 Years

H2S (HYDROGEN SULPHIDE & BREATHING APPARATUS CERTIFICATION) OXY OCCIDENTAL PETROLEUM OF QATAR August 23, 2010

PTW (PERMIT TO WORK)

OXY OCCIDENTAL PETROLEUM OF QATAR August 12, 2009

CENTUM CS SYSTEM – YOKOGAWA DCS - YOKOGAWA PHILIPPINES INC. June 10, - July 12, 1998

BASIC PLC ENGINEERING AND OPERATION COURSE - YOKOGAWA PHILIPPINES INC. September 23 - 30, 1998

REPORTER NETWORK ABB INSTRUMENTATION - ENGINEERING SOFTWARE March 6 –March 31, 1997

CALTEX REFINERY, SAN PASCUAL, BATANGAS

CALIBRATION FOR PROCESS INSTRUMENTATION (CPI)

MERALCO FOUNDATION INSTITUTE ORTIGAS, METRO MANILA March 1999 GOOD AUTOMATION MANUFACTURING PRACTICE FOR PHARMACEUTICAL AND FOOD INDUSTRIES AND 21CFR11 (GAMP 3)

SCHERING PLOUGH PHARMACEUTICAL CO. 50 TUAS WEST DRIVE, SINGAPORE 638408 March 2003 SMART PLANT INSTRUMENTATION (SPI)/(SP3D)

J&S CONSULTANCY & SERVICES CO. INC.

MAKATI CITY, METRO MANILA,November 2013

ICRosales

Page 7 of 7, 2015

SKILLS AND KNOWLEDGE:

DCS OPERATION AND MAINTENANCE (CENTUM CS 1000/3000), PRIM TOOLS SOFTWARE APPLICATION, IOM CALIBRATION SOFTWARE, OPERATING SYSTEM (WINDOWS NT/ XP / 2000 / 98 / 95 / DOS), MICROSOFT EXCEL, MICROSOFT WORD, MICROSOFT VISIO, ACROBAT READER/DISTILLER, AUTOCAD ALL VERSIONS (2D/3D DESIGN)

BASIC MICRO STATION APPLICATION, BASIC PDS APPLICATION, BASIC AUTO PLANT APPLICATION, IN-TOOLS APPLICATION SOFTWARE, SP3D MODEL/OPERATIONS, NAVISWORKS FREEDOM. EDUCATION:

BS COMPUTER SCIENCE 1991 - 1995 UNIVERSITY OF BATANGAS (FORMERLY WESTERN PHILIPPINE COLLEGES) HILLTOP BATANGAS CITY, PHILIPPINES

SECONDARY EDUCATION 1985 – 1989 UNIVERSITY OF BATANGAS (FORMERLY WESTERN PHILIPPINE COLLEGES) HILLTOP BATANGAS CITY, PHILIPPINES

ELEMENTARY EDUCATION 1978 – 1985 STA. RITA ELEMENTARY SCHOOL STA. RITA BATANGAS CITY, PHILIPPINES

I HEREBY SWEAR THAT ALL INFORMATION AND ABOVE DATA ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.

ISMAEL C. ROSALES