Post Job Free
Sign in

Engineer Construction

Location:
Cagayan de Oro, Northern Mindanao, Philippines
Posted:
December 02, 2015

Contact this candidate

Resume:

PERSONAL DATA:

Date of Birth : January **, ****

Place of Birth : Talisay, Gingoog City, Philippines

Sex : Male

Civil Status : Married

Religion : Roman Catholic

Citizenship : Filipino

Height : 5’7”

Weight : 70 kg

Father’s Name : Alex T. Delima

Occupation : Millwright

Mother’s Name : Carmelita R. Delima

Occupation : Housewife

Parents Address : Zone 2 Bayabas Extension, Cagayan de

Oro City, Philippines

Contact no. : 093********

EDUCATIONAL BACKGROUND:

College : Xavier University – Ateneo de Cagayan

Corrales Avenue, Cagayan de Oro City

Bachelor of Science in Mechanical Engineering

2002-2008

Graduated (Licensed)

Secondary : Kong Hua School

Kauswagan, Cagayan de Oro City

1998-2002

Graduated

Primary : Kauswagan Central School

Kauswagan, Cagayan de Oro City

1992-1998

Graduated

WORK/TRAINING EXPERIENCE:

I. Project Management (Construction Engineering)

1. Job Title: Northern Mindanao Import Facilities (July 7, 2014- Present), CDO, Philippines

Company: Japan Gas Corporation

Position: Piping Supervisor

Reporting to: Construction Manager (Piping/Mechanical)

Unit: Field Operation Group

Job Summary:

Control, and are directly responsible for the progress of the construction work and Quality controlling for the assigned work categories, coordinate and control the activities of the various categories working. Understands construction schedule, sequence of work & interface with other works. Coordinate and control between all the categories of work related to their scope of works and report to the Construction Manager.

Responsibilities:

Piping spool fabrication

Piping & supports field installation

Piping test & inspections

Assist in Piping/Mechanical installation

2. Job Title: Felcris Mixed Used Development Project (Feb. 1, 2014- July 5, 2014), Davao, Phil’s.

Company: Rider Levett Bucknall Phils.

Position: Site Mechanical Engineer

Reporting to: Construction Manager (Mechanical)

Unit: Field Operation Group

Responsibilities:

Project plan implementation.

Inspection of construction works.

Monitoring of project accomplishment in accordance with set schedule.

Coordination with different parties involved in the project.

Evaluation of billings submitted by the contractors and/or suppliers.

Attendants to regular meetings.

Other related duties.

II. Engineering Construction (Oil/Gas Engineering)

1. Job Title: Albayroni Ammonia Energy Optimization Project –Shutdown works

(February 1, 2013 – Aug 09, 2013)

Company: ARCC/EEI-KSA

EPC Contractor: Saudi Toyo Engineering Corp.

Position: Engineer Field -Mechanical

Reporting to: Mechanical Superintendent (Rotating/Static)

Unit: Field Operation Group

Job Summary:

Works under the direct supervision of Superintendent. Coordinates all Engineering aspects such as RFI, RFIT, WTS and “as-built” drawing preparation. Assist on preparation of construction methodology and conducts time and motion study in every aspect of mechanical activities to improved productivity. Assumes other duties as assigned by my superior.

Responsibilities:

Ensure projects are completed according to project plans.

Prepares construction methodology (static, rotating, turbine assembly, internal trays and catalyst loading).

Provides issued for construction drawing at site as per client approval.

Monitors work for compliance to applicable codes, accepted engineering practices and standards.

Monitors and evaluates work progress at site and prepares erection materials to be installed as per shutdown works scheduled.

Work as Material Engineer for pre-shutdown, shutdown, and turn-around works in all rotating, static, turbine parts assembly, internal trays, catalyst loading and equipment modification.

Assigned material expediter to prepare and expedite all assembly/erection equipment material as per scheduled priority.

To ensure all erection equipment materials to be issued at site on time before schedule knocks.

Prepares and purchase tools/equipment needed to execute pre-shutdown, shutdown and turn-around works.

Monitors quality, safe and productivity in collaboration with FOG and support disciplines (Quality Control, Planning and Cost, and Engineering Department).

Coordinates with the clients for any field revisions encountered against bid drawing and generate additional work cost.

Assist foreman and field supervisors in familiarization of mechanical job work scope and promulgate approved construction methodology.

Assist on Testing and Pre-Commissioning Activities.

2. Job Title: SAMco. Acrylic Acid Project (July 28, 2012- January 31, 2013)

Company: ARCC/EEI-KSA

EPC Contractor: Samsung Engineering Co., Ltd.

Position: Senior Field Piping/Construction Engineer

Reporting to: Construction Superintendent/Manager (Piping/Mechanical)

Unit: Field Operation Group

3. Job Title: Hadeed long Expansion Project (May 3, 2011 – April 28, 2012), ARCC/EEI-KSA

Company: ARCC/EEI-KSA

EPC Contractor: Industrial Beteiligung Services and Contracting L.L.C SA

Position: Field Engineer (Equipment and Service Engineer)

Reporting to: Supervisor (Equipment and Service)

Unit: Logistics/ESD

4. Job Title: NCP-Ethylene Plant Project (Aug 13, 2009 – March 03, 2011), ARCC/EEI-KSA

Company: ARCC/EEI-KSA

EPC Contractor: Japan Gas Corp.

Position: Junior Field Engineer

Reporting to: Piping Supervisor (Fabrication and installation)

Unit: Field Operation Group

5. Job Title: Integrated Engineers Development Program-IEDP (June 8, 2009 – July 24, 2009)

Company: Equipment Engineers Incorporated Corp.-EEI

Position: Mechanical Engineer

Unit: Field Operation Group -IEDP Batch 2

Job Summary:

Works under the direct supervision of Superintendent. Assigned a gang of men to execute piping works construction. Evaluates and monitors work Progress and Productivity. Resolves field design problem and coordinates all Engineering aspects such as RFI, WTS, JCRF and Permit to Work System. Develop field piping work procedures and parameters and “as-built” drawings preparation. Time and motion studies of piping work activities to improved productivity. Assumes other duties as assigned by my Supervisor.

Responsibilities:

Ensure projects are completed according to project plans.

Provides issued for construction drawing at site as per client approval.

Monitors work for compliance to applicable codes, accepted engineering practices and standards.

Assigned a gang of men to execute piping works construction as per schedule.

Assist on quantification including cost estimates for any change order and additional works.

Coordinates all Engineering aspects such as RFI/TQ, RFIT, WTS and “as-built” drawing preparation.

Assist skilled workers on preparation of work execution based on approved construction methodology.

Prepares construction weekly and monthly schedule.

Assigned group of line checkers to evaluate work Progress at site as per piping test packages priority.

Coordinates with clients for any field construction revisions and additional cost.

Conducts toolbox meeting on quality, safety and Productivity.

Conducts time and motion studies of piping work activities to improved productivity.

Monitors and evaluate productivity and work activities.

Assist on Testing and Pre-Commissioning Activities.

I.Manufacturing and Industrial Process(Operation and Maintenance)

1.Universal Robina Corporation (Feb 3, 2009 – April 22. 2009), URC-El Salvador, Mis-or. Phils.

Position: Process Operator

Unit: Production Operation

Responsibilities:

Process operation for Refresh Fruit Drink

Piatos process Sheeter Operation

V-Blending Operation

Process trainee operation for Nova Country Chedda

2.Nestle Philippine Inc. (Apr-May 2008)

Position: On-the-job trainee

Unit: Predictive Maintenance System

Responsibilities:

Vibration Testing using Data Collector

Laser shaft-coupling alignment

Thermal Testing

LICENSURE:

Registered Mechanical Engineer, Registration no. 0075756

ORGANIZATION:

Member – Philippine Society of Mechanical Engineers (PSME), 2008-present

SKILLS:

Supervisory Skills

Pipe fitting

Steel working

Millwrighting

Computer: Microsoft Office, Power Point

AWARDS

Semi-finalist, Final Year Project Presentation (College)

2nd place Mid-Year PSME National Convention Quiz Bowl (College)

3rd placer History Quiz bowl (High School)

Honorable Mention (Elementary)

SEMINARS ATTENDED:

Event Date Venue

1. Basic Millwright Course February 01, 2013 Jubail, KSA

2. Foremanship Course February 02, 2011 Juaymah Camp, KSA

3. Health and Safety Environment August 20, 2009 Jubail, KSA

4. Good Manufacturing Practices February 16, 2009 URC, El Salvador, Mis-Or.

5. National Convention PSME Oct. 25-27, 2007 Cebu Convention Center

6. Design of Fire Protection System August 29, 2007 Xavier University

7. Mid-year PSME National Convention June 26, 2007 Grand Caprice, CDO

8. Power Plant Operation July 14, 2007 De Luxe Hotel, CDO

9. Power Plant Control System July 14, 2007 De Luxe Hotel, CDO

10. Seminars on Advanced AutoCAD: February 3, 2007 Xavier University

3D Drawing

11. Seminars on Hydro Electric Power September 9, 2006 Xavier University

Plant

12. Design Of Diesel Power Plant November 25, 2006 Cagayan de Oro City College

13. Technical Seminar- Environment July 25, 2005 Sunriva, CDOC

Awareness and product presenta-

tion Mechanical seal and pipe repair

and Mechanical Lubrication

14. Technical Seminar- Steam for pro- June 25, 2005 De Luxe Hotel, CDO

cess and New Mechanical Engineering Law

15. Automation Technology and August 25, 2005 MPSC, Cagayan de Oro City

Mechatronics

REFERENCES:

Prudencio Tacandong, Construction Manager

JGC Philippines, Inc., 2109 Prime Street, Madrigal Business Park,

Ayala Alabang, Muntinlupa City

Cp No. 091********

James Bulay-bulay, Mechanical Superintendent

Al Rushaid Const. Co. Ltd. PO Box 31688, Petroleum Center. Tower A Doha Road

Al Khobar, Kingdom of Saudi Arabia.

Cp No. +966*********

Engr. Cyril G. Fabrea, PME

Faculty, Power Engineering Department-XU, Cagayan De Oro City

Contact No. +63(8822)72-3116



Contact this candidate