** ********* ***** ******# 647-***-****
North York Toronto Ontario
M6B 3V8 Canada E-mail: **********@*****.***
Aurelio C. Besinga Jr.
QUALIFICATION
** ***. ** ********** ** the field of
Electrical and Mechanical Construction
5 years experience in Autocad 2D
drafting
2 years experience in Revit MEP and
Inventor 3D drafting, Animation
software using Lumion, Cloud
rendering, and Clash detection using
Navisworks.
Good understanding in National
Electrical Code.
EXPERIENCE
NOV. 2012 - PRESENT ESP TECHNOLOGIES /
HORIZON ENERGY
Whakatane New Zealand
MEP 2D & 3D DRAFTER
Prepare detail layout drawings for Equipment
Power, Building Management system (BMS),
and associated single line, block cabling
and schematic/wiring diagrams.
Develop MEP 2d drawing to 3D drawing.
Prepare as built drawings.
Check I/O BMS points schedule and convert to
block cabling diagrams
Develop PLC input and output data from spread
sheet to drawing
PROJECTS
Page 2 of 11
WHAKATANE HOSPITAL BLDG. 100
Whakatane, New Zealand
ESK VALLEY HYDRO POWER PLANT
Napier, New Zealand
WHAKATANE WATER TREATMENT
PLANT - Whakatane New Zealand
DRAFTING SERVICES
HORIZON ENERGY
New Zealand
3D Modeling of Clusters Brackets,
33KV and 11KV Structure, Heli Cable Cradle,
ABB Capacitor Q-Pole Structure
TAURANGA GIRLS COLLEGE
New Zealand
Heating System 3D drawings
TAURANGA BOYS TECH BLOCK
New Zealand
Heating and Ventilation System 3D drawings
RAMAZON HYDRO POWER
Papua New Guinea
Power House Ventilation System
and Switchyard 3D modeling
OPAC NEW COLD STORAGE
New Zealand
Refrigeration System 3D Modeling
HAWKINS REFRIGERATION
PAFCO FIJI
Refrigeration System 2D and 3D drawings.
Develop PID schematic to 3D drawing.
Page 3 of 11
MAY, 2009 - NOV. 2012 JUFFALI ( JAMED )
SENIOR ELECT’L. ENGR.
ITCC DATA CENTER PROJECT (TIER – 4)
Riyadh, Saudi Arabia
Review electrical design for site execution
such as, lighting and power system, Telephone
and Data system, Access Door and Security
system, KNX/DALI lighting control system, Fire
Alarm system, Equipment Power system, and IP
CCTV system
Prepare material and shop drawing submittals
Prepare work schedules
Prepare bill of materials
Prepare shop drawings using Autocad for site
execution
Attend management & technical meeting
Review electrical design for site execution
Prepare weekly and monthly progress report
Prepare variation orders and additional works
Review design drawing against actual
installation.
SENIOR ELECT’L. ENGR.
ALTAMEER RESIDENTIAL PALACE - R5
PROJECT
Riyadh, Saudi Arabia
Monitor daily activities to ensure consistent
work schedule.
Prepare weekly work schedule
Prepare payments certificate base on monthly
progress accomplishment
Prepare as built as per actual installation.
Attend technical and management meeting.
Review electrical design for site execution
Prepare weekly and monthly progress report.
Prepare variation orders and additional works.
Review design drawing against actual
installation.
Prepare design, B.O.Q and pricing for project
bidding.
Page 4 of 11
Review panel board shop drawings, technical
layout, technical description, and bus bar
computation.
Monitor shop drawing and material submittals.
Review equipments to be monitored by BMS for
the entire building.
Prepare shop drawings and detail drawings
using AutoCad.
JULY, 2010 – JAN. 2011 SENIOR ELECT’L . ENGR.
ARAB NATIONAL BANK DATA CENTER
PROJECT
Riyadh, Saudi Arabia
Monitor daily activities to ensure consistent
work schedule.
Prepare weekly work schedule
Prepare payments certificate base on monthly
progress accomplishment
Prepare as built as per actual installation.
Attend technical and management meeting.
Review electrical design for site execution
Prepare weekly and monthly progress report.
Prepare variation orders and additional works.
Review design drawing against actual
installation.
Prepare design, B.O.Q and pricing for project
bidding.
Review panel board shop drawings, technical
layout, technical description, bus bar
computation, etc.
Monitor shop drawing and material submittals.
Review equipments to be monitored by BMS for
the entire building.
Prepare design, shop drawings and detail
drawings using AutoCad.
FEB. 14, 2008 - DEC. 2011 JUFFALI & BROTHERS (JAMED) KSA RIYADH
\SENIOR ELECT’L. ENGR.
MAGRABI HOSPITAL PROJECT
Riyadh, Saudi Arabia
Monitor daily activities to ensure consistent
work schedule.
Prepare weekly work schedule
Page 5 of 11
Prepare payments certificate base on monthly
progress accomplishment
Prepare as built as per actual installation.
Monitor installation and wiring of AHU
devices for BMS such as pressure &
temperature sensor, electronic damper
switch, gate valves and etc.
Monitor cable pulling for main and sub feeders
Monitor installation and termination of fire
alarm devices such as, smoke, duct & heat
detector, flame detector, beam detector, fire
alarm interface /control modules, tamper and
flow switch and supervise installation of fire
alarm panel such as conventional and
addressable.
Monitor correct height and dimensions for
lighting and power devices, including Fire
Alarm, BMS and low current system devices.
Attend weekly management and technical
meeting
Monitor in the installation of cable tray and low current trunk.
Monitor installation of bus-way and supervise
wiring of fire alarm, telephone and public
address system.
Monitor wiring of cameras and installation of
devices such as dome and moving cameras and
supervise wiring of MATV system.
Prepare daily work schedule.
Monitor in the installation of grounding system.
Monitor wiring of telephone and data system
such as fiber optics cable, cat 5 & cat 6 cable,
and multi-pair cable and installation of IDF and
MDF rack.
Monitor correct size of wires and cables as
specified in the plan.
Attend coordination meeting with the other sub-
contractors and prepare daily and monthly
accomplishment report.
Monitor wiring and installation of access control devices such as access control module, (Kantech
brand), magnetic door contacts, card key holder
and electric door strike.
Estimate bill of quantities and material cost.
Monitor testing and commissioning of fire alarm
system, telephone for fire, telephone and data
system, lighting and power system, and CCTV.
Prepare material submittal and checking final
drawing.
Page 6 of 11
Prepare voltage drop calculation
Prepare design and shop drawings using
AutoCad for site execution.
JULY 2005 – MAY 2007 NILE ASTER QATAR
ELECT’L. FOREMAN
LA CIGALE HOTEL PROJECT
Doha, Qatar
Monitor daily activities to ensure consistent
work schedule.
Responsible in the implementation of electrical
System layout, including fire alarm & Low
Current system (exposed & slab works).
Supervise in the cabling of security system
Prepare as built as per actual installation.
Supervise installation and wiring of AHU
devices for BMS such as pressure & temperature
sensor, electronic damper switch, gate valves
and etc.
Supervise in the wire/ cable pulling for main and sub feeders
Supervise installation and termination of fire
alarm devices such as, smoke, duct & heat
detector, flame detector, beam detector, fire
alarm
Interface /control modules, tamper and flow
switch and supervise installation of fire
alarm panel such as conventional and
addressable.
Monitor correct height and dimensions for
lighting and power devices, including
Fire Alarm, BMS and low current system
devices.
Supervise termination & installation of control
module for AHU's
Supervise in the installation of cable tray and
low current trunk.
Supervise in the installation of bus way or bus
duct and supervise wiring of fire telephone and
public address system
Supervise wiring of cameras and installation of
devices such as dome and moving cameras and
supervise wiring of ITTV system. Prepare daily
work schedule.
Supervise in the installation of grounding
system.
Page 7 of 11
Supervise wiring of telephone and data
system such as fiber optics cable, cat 5 &
cat 6 cable, and multi-pair cable and
installation of IDF and MDF rack.
Supervise also in the termination of telephone
and data devices.
Monitor correct size of wires and cables as
specified in the plan.
Attend coordination meeting with the other sub-
contractors and prepare daily and monthly
accomplishment report.
Supervise wiring and installation of access
control devices such as access control module,
(Kantech brand ), magnetic door contacts, card
key holder and electric door strike.
Estimate bill of quantities and material cost.
Supervise testing and commissioning of fire
alarm system, telephone for fire, telephone and
data system, lighting and power system, and
CCTV.
Supervise alignment of emitter beam detector.
MAY 2003 – MAY 2005 Universal Macro Technology
Systems & Services Inc, Cebu City, Phil.
ELECT’L. SITE ENGR.
ISLAND CITY MALL PROJECT
Tagbilaran City Bohol
Philippines
In charge in the Implementations of electrical
system layout.
Attend weekly technical and management and the
other trade contractors.
Monitor daily activities to ensure a consistent
work schedule as specified on the electrical bar
schedule chart.
Estimate and facilitate additional electrical works
(Change orders)
Monitor and supervise the implementation of the
electrical installation that it must correspond with the electrical construction plan and the latest
codes and specification.
Supervise testing and commissioning of feeders,
circuit breakers and transformers.
Supervise in the preparation of as built Plan.
Prepare shop drawing prior to the actual
installation.
Attend weekly Co-ordination meeting with
Page 8 of 11
other contractors
Supervise Roughing-in, cable/ wire pulling, and
termination of main and sub feeders.
Supervise termination of primary and secondary
side of three phase dry type transformers.
Supervise termination of cables for low Voltage
switchgear.
Supervise installation and wiring of meter center.
Supervise cad weld application for grounding
system.
Supervise installation of hangers and supports for raceway system layout.
Electrical Estimator
Supervise testing and commissioning of low
current system, medium and high voltage system.
FEB. 2002 – FEB. 2003 Care Builder
Cagayan De Oro City,PHILS.
FIELD ENGINEER (Electrical Works)
Three Story Commercial Building Project
San Mateo Rizal, Manila
In-charge in the implementation of electrical
system layout
Monitor daily activities to ensure a consistent
works Schedule as specified on the electrical
schedule bar-chart
Monitor and supervise the implementation of the
electrical installation that it must correspond with the electrical construction plan and with the latest electrical codes and specification.
Supervise in the testing and commissioning of
feeders, circuit breakers and transformers.
Supervise roughing-in, cable/wire pulling and
termination of main and sub-feeders and branches
Supervise installation of panel board, lighting
fixtures, and wiring devices.
Supervise in the preparation of as-built plans.
Prepare shop drawings prior to the actual
installation.
Supervise termination of primary and
secondary
side of three phase dry type transformer
Supervise installation and wiring of meter center.
Supervise cad weld application for grounding
system.
Page 9 of 11
AUG. 2001- FEB. 2002 Electrical Contractor - Philippines FIELD ENGINEER
Residential and commercial Building Project
In-charge in the implementation of Electrical
System layout.
Monitor daily activities to ensure a consistent
work schedule.
Monitor and supervise the implementation of the
electrical installation that it must correspond with the electrical construction plan and with the latest Electrical Codes and Specification
Supervise roughing-in., cable/wire pulling and
termination of main and sub-feeders and branches.
Supervise installation of panel board, lighting
fixtures, and wiring devices.
Supervise wiring and termination of main feeders and installation of meter.
Supervise termination of primary and secondary
side of three phase dry type transformer
Design and estimate electrical wiring system
JUNE 2000 - AUG. 2001 National Power Corporation
Dampas, Tagbilaran City,
Philippines
ELECTRICIAN
Bohol Diesel Power Plant
Rehabilitation Project
In charge of roughing-in, cable/wire pulling, and termination of main and sub-feeders and branches.
Responsible of troubleshooting any irregularities of system wiring.
Servicing and testing motor control center.
Assembling direct on line and wye-delta
connection of motor control.
Wiring and termination of feeder for motor
control
Responsible in the termination of power cable
Responsible in the commissioning and testing of
feeders, and circuit breakers.
Responsible in the line checking, insulation
testing and phase sequence test.
Page 10 of 11
1999 - 2000 Coca Cola Bottlers Phils. Inc.
Davao Plant
QUALITY CONTROL ASSISTANT
Waste Water Treatment Plant Operator
Monitoring of ph, dissolved oxygen and bio-
chemical demand of waste water.
Monitoring any irregularities/mal- function of
motors and controls.
Responsible of troubleshooting of mal-function
motors, controls and instrumentation devices.
Responsible of path and torque test, M-blue,
caustic analysis, and caustic residue.
Monitoring of electronics bottle inspector
1997- 1999 Municipality Of Lila
Poblacion Lila, Bohol, Philippines
ELECTRICIAN
Construction of Municipal Building of Lila
And New Public Market Building
Design and estimate system wiring and
accessories
In charge of roughing-in, cable/wire pulling, and termination of main and sub-feeders and branches.
Responsible of troubleshooting any irregularities of system wiring.
Responsible in the commissioning and testing of
feeders, and circuit breakers.
In charge in the termination of main feeders and branches
Responsible in the installation of switches,
lighting fixtures and other wiring accessories.
Responsible in the installation of lighting post, and wiring for perimeter lighting.
Responsible in the line checking, insulation
testing and phase sequence test
Responsible in the installation of meter.
Page 11 of 11
OTHER SKILLS SOFTWARE
MS Word / Excel
Adobe Photoshop CS5
Autocad MEP 2015
Sketchup
Lumion
ELECTRICAL
EIB/KNX/DALI Lighting Control
FIRE ALARM SYSTEM
SECURITY SYSTEM
VOICE & DATA SYSTEM
PUBLIC ADDRESS SYSTEM
NURSE CALL SYSTEM
PLC
INTERESTS Autodesk Software
EDUCATION 1995 Registered Master Electrician Board Exam
( Philippines )
Passed
1997 Registered Electrical Engineer Board Exam
( Philippines )
Passed
1991 to 1996 - Cagayan De Oro
College, Cagayan De Oro City
REFERENCES Brett Waghorn
Business Development Manager
ESP Technologies Ltd.
http://www.esp.co.nz/
P: 64 7 308 9800
Email: *****.*******@***.**.**
Allan Goldsmith ( Snow )
Administration Manager
ESP Technologies Ltd.
http://www.esp.co.nz/
P: +64 7 308 9800
E: ****.*********@***.**.**
AT A1
REP JOB NO.
ORIGINAL SHEET SIZE
REV
A1
DRAWING NUMBER
1
A
21 3 4 5 6 7 8 9 10
CLIENT PROJECT TITLE
B
C
D
E
F
G
H
APPROVED DATE
JUN BESINGA
REV DESCRIPTION DATE BY CHK APP
A ISSUED FOR APPROVAL
Pacific Engineering Projects Ltd
P. O. Box 49 017, Mt Roskill South
Auckland 1041, New Zealand
Tel: +649-***-****
Email: ****@***************.**.**
Web: www.pacificprojects.co.nz
COPYRIGHT:
The information contained herein remains the
property of Pacific Engineering Projects Ltd. and
is to be used only in conjuction with the
performance of work for Pacific Engineering
Projects Ltd. Reproduction in whole or part
without permission is expressly forbidden.
DO NOT SCALE FROM THIS DRAWING.
CHECK AND VERIFY ALL DIMENSIONS
BEFORE COMMENCEMENT OF ANY WORKS. PSD
JB PM BW NT
SCALE
DRAWING TITLE
PROJECT LOCATION
DESIGNED CHECKED
DRAWN
N. TAMBLYN
B. WAGHORN
REF
Refrigeration, Air
Conditioning &
Electrical Engineers
134 Wordsworth St.
PO Box 7075
Ph +64 (3) 3660399
Fax +64 (3) 3669417
10/5/2015 12:08:38 PM
LEVUKA, FIJI
JO135 M.70928.2701
NEW COLDSTORE
Rendering
PACIFIC FISHING COMPANY LTD
05.10.15
A
NTS
05.10.2015