ADEEL HASHIM
Project Engineer (E&I)
Al-Jubail Saudi Arabia - Cell: +966-568593316-0555316594
E-mail: *******@*****.***
Career Summary:
** **** ********** ** *** field of E& I : KSA EXP 05 YEARS
I have worked in Construction, Engineering, Maintenance and Projects in leading national / international companies. I have Additional Experience of managerial position. I have good understanding of Electrical Drawings, planning projects.
Key Skills:
Expertise in planning, designing, budget estimation and resource allocation
Proficiency in understanding and interpretation of applicable international codes and standards such as ANSI, IEEE, IEC, NEMA, NFPA, SABIC and ARAMCO standards
.
Personality traits:
Excellent communication and analytical skills
Motivated and goal oriented
Good team player
Professional Experience:
COLFAXFLUIDHANDLING through
Bezel Arabia Company Ltd. OCT 2015 TO DATE
Working as Project Engineer at regional head office COLFAXFLUID HANDING ( ARAMCO APPROVED VENDOR FOR API 614 SKIDS).
Job responsibilities as below:
To Review and finalize Project documents (E&I) part for ARAMCO approvals.
To Design / Prepare: P&I (E&I Part), Instrument Data Sheets, Instrument LIST / Schedule, Wiring diagram, Junction box.
To review ARAMCO STANDARDS 32-SAMSS-13, 34-SAMSS831, 34-SAMSS-821, SAES-P-104, SAES-P-101, 104, 111. SAES-J-902, 904,002,200,300,400 and related standards for motor, cable, control valves, etc if required.
To comply the ARAMCO comments on returned drawings documents after review of related standards and requirement of that Plant.
Finalizing the PIM (E&I part), procurement assistant (E&I ) part, Manufacturing of Skid ( E&I ) part.
SUB CONTRACTOR EXPERIENCE AS Bezel Arabia Employee for SADARA and SWCC AND SABIC Projects.
-Project Manager (E&I) Feb 2014 to Sep 2015
-Project Engineer (E&I) Dec 2011-Jan 2014
SADARA - POLYETHYLENE TRAIN 2 PROJECT:
Worked as Project Head ( E&I) at construction of Polyethylene Plant Train # 2 SADARA ( Joint venture of Dow chemicals and ARAMCO).
Working as sub-contractor to L&T ATCO to complete the construction activities Including:
1)LV Panel Installation
2)Battery and Battery racks installation
3)Cable Tray Installations
4)Cable Laying
5)Cable Gland & Termination
6)Instrumentation Calibration (Only Supervision No hands on Experience)
7)Instrumentation Installation
8)Conduit Installation
9)Junction box, MCS installation
10)Lighting pole, lighting fixture, lighting socket installation
11)Grounding cable and pads installation
SWCC Ras Al khair Power Plant
Successfully completed the project in SWCC Ras- Al-khair Power Plant, with EPC contractor SEPCO-3 Project under Arabian Etimaad (managing contractor)
Scope: Installation of fuel oil system equipment for six generating stations in 2400 MW power plant. Installation of LV Room equipment and panels of make Petro gas and Atlas Copco. Equipment installation consists of Installation of Motors, Batteries, PLC system related cable laying and terminations.
Responsibilities:
To execute the work as per plan - schedule and client requirement
To Manage available manpower, material and tools as per work front and schedule of work
To Monitor work progress and Invoicing issues
To carry out daily site meeting with the engineers / supervisors regarding the different issues of site.
To carry out daily meeting with client regarding the work executed, work front, quality, drawing issues, invoice problems, site obstacles and all other related site issues.
To carry out frequent meetings with company top management regarding the work progress and site issues.
AL Razi SABIC KSA Project.
Revamp 08 no of Low voltage Mitsubishi 1000A panels with new ones.
Revamp of 02 DC Distribution panels in SS#1 AL Razi Plant no 01
HOME COUNTRY PAKISTAN EXPERIENCE:
Dewan Cement Company Ltd.
DY Manager in Engineering &Maintenance Department Dec-2004 to Nov-2011
Responsibilities:
Preparing progress reports and monitoring project.
Prepare and review scope of work, materials, specifications and drawings
Preparing engineering studies, drawings and documents, after review of that
Study and Review material and equipment specifications.
Plan, supervise and execute plant yearly turnarounds within budget and planned time
Prepare, update and review job plans, work instructions and procedures for electrical maintenance
Ensure availability of spares and timely procurement of spares
Also, worked on projects having below scope:
Installation of Pack house Haver and Boecker Germany Vendor
Installation and commissioning of LV system –Siemens Pakistan
Installation and commissioning of MV switchgear – ALSTOM Pakistan
Installation and testing of PLC system –Siemens S 7 –PCS 7 System
Lucky Cement Company Ltd., Jan-2003 to Nov-2004
E&I Engineer
Worked as shift Engineer E&I in Raw Mill area.
Responsibilities:
Maintenance of LV Room (MCC)
Inspection of Motors (Vibration and motor bearing sound observations)
To log out fault report for general maintenance
Schedule routine maintenance of electrical equipment like motors, MCC (Circuit Breaker and contactors).
Inspection of motor greasing and lubrication requirements
Spare management of the electrical Equipment in the plant.
To control program, maintain, repair and modify the software and hardware of the control system (Siemens PLC), PLC ladder logic.
Worked on Foxboro DCS, Modicon, Allen bradely PLC systems.
Academic Qualifications:
Bachelor of Engineering in Electronics (4 years) 2002
PMP Project Management Training (35 PDU) 2014
Diploma in IT (1 year) 2002
Professional Affiliations:
Member of Pakistan Engineering Council Member Ship No: ELECTRO/7101