Richard W. Surowicz 330-***-****
*** ****** **** ***** **********@*****.***
Medina, Ohio 44256 www.linkedin.com/in/rwsurowicz
SUMMARY
A results driven Manufacturing Leader with 30 years of management experience in plant management, continuous improvement, and sustaining engineering. Experience with machining, metal forming, molded plastics, printed circuit boards, and multiple assembly processes. Analytical thinker with ability to conceptualize a strategic vision and future state road map using lean methodologies.
Lean Implementation
Manufacturing, Operations, Engineering Management
Budgetary Responsibility
Quality/ Inventory/ Lead time Improvement
Future State Process Planning
Empowering Teams
Non-union/union Environments
Stage Gate Product Development
System conversion/business integration
Mixed model/Aggressive lead times
. PROFESSIONAL EXPERIENCE
Parker Hannifin Corporation, Cleveland, Ohio 2004 - 2015
Plant Manager, Akron, Ohio 2012 - 2015
Sole responsibility for 100 person union facility producing make to order pneumatic air cylinders. Responsible for the safety, quality, and cost of all manufacturing processes, planning, purchasing, facility management, manufacturing engineering, and lean.
Implemented mixed model, make to order, one piece flow manufacturing, reducing lead time from 1 to 2 weeks to 48 hours.
Reduced WIP 75% by implementing pull systems and one hour pitch.
Integrated operations from Mexico using 50% fewer resources.
Converted FP1 ERP System to MSS Corporate ERP platform enabling Value Stream alignment and improved metric management.
Twice achieved over 500 days without a lost time accident through 5S, Safety Audits, Near Miss Problem Solving, Management of Change.
Plant Manager Wadsworth, Ohio 2004 - 2012
Responsibility for 90 person non-union make to order manufacturing operation producing pneumatic, hydraulic and electro-mechanical actuators.
Achieved over 1500 days without a lost time accident.
Integrated acquisition with a 60% space reduction collaborating with acquired team.
Reduced make-to-order lead time 60% using partial machining strategy.
Reduced non-warranty refurbish program lead time 45% by implementing standard work and policy changes.
Richard W. Surowicz 330-***-****) Page Two
Novar Controls Corporation, Cleveland, Ohio 2000 - 2004
Manufacturing Manager, 2000 - 2004
Responsible for manufacturing operations in Ohio and Tennessee producing building automation systems, panels, and PCB assemblies for HVAC manufacturers.
Successfully moved manufacturing operations from Ohio to Tennessee. Relocated part of team, ran operations and systems in parallel.
Successfully integrated acquisition from Seattle to Tennessee.
Set up 3PL distribution center and established pull systems enabling easier consolidation and shipment of mixed product systems to customers.
The Genie Company, Alliance, Ohio
Manager of Continuous Improvement/Sustaining Engineering,
Plant Manager (300 person facility)
Manufacturing Manager
Supervisor
EDUCATION / TRAINING
Bachelor of Science, Industrial Technology
Southern Illinois University, Carbondale, Illinois
Professional Development
Parker Lean Boot Camp I, II, III
Rick Harris Making Material Flow
JCT Demand Flow Technology Institute
Thomas Group Cycle Time Reduction – Speed to Market
JAMAC (Japanese Management Association Consultants) TP system
Make/ Buy the Cambridge Model
Taking Charge of Change I, II
Personalysis
Employee Law
Military
US Air Force, Missile Systems Analyst, Top Secret Clearance, Personnel Reliability Program, Cheyenne, Wyoming