Muhammad Atif Munir
ELECTRICAL & INSTRUMENT ENGINEER
CELL: +92-302*******
EMAIL: ****.*******@*****.***
PERMANENT ADDRESS: Rehman Town Abdul Hakim District Khanewal, Pakistan. MY OBJECTIVE
Make use of my dynamic and versatile abilities to cope with the technical & economic challenges and benefit your organization with my determination & dedication to work with honestly. PROFILE
I am positive forward looking team player, and possess outstanding analytical, negotiation, decision making & interpersonal skills. I have the ability to learn quickly with passion and drive to succeed with distinction in an empowered and result oriented culture. EXPIRENCE DETAILS: (Dec 2012 to till date)
Electrical & Instrument Engineer:
Currently, working as Electrical & Instrument Engineer in Projects & Technical Services department at MOL Oil & Gas Pvt. Ltd (Pakistan) which is the fastest growing exploration & Production (E&P) Company in Europe. As a member of the Projects and Technical Services Team, the responsibilities include Supervision/Working of different ongoing projects mainly construction of Gas Processing Facility (LPG plant), Well Head Surface Facilities and installation of new equipment in existing plant aimed at process optimization and variation, design modification at site, review of project documents, material BOQs preparation, reconciliation from Contractor, interfacing with vendor technical teams for the solution of discrepancies in different equipment, inspection/testing/simulation of procured Electrical & Instrument material. Specialties
Instrumentation/control and commissioning.
Power system installation and commissioning.
Project management.
Engineering designs and reviews.
Quality assurance and control
Construction/Execution.
Team Leader and Team Player.
Capable of working under pressure.
A good problem solver with its technical skills. PROJECTS AT MOL PAKISTAN
Construction and Commissioning of Gas Processing Facility (GPF) MOL establishing a LPG plant Gas Processing Facility having capacity of LPG 420 MT/D, OIL 20,000 BB/D and GAS 158 MMSCFD that is one of the largest project of LPG in Pakistan. Responsibilities include supervision of construction/Commissioning activities at Gas Processing Facility (GPF) regarding Electrical and Instrumentation. Ensuring quality work according to method statements and relevant drawings submitted by EPCC. Construction and Commissioning of WHSF’s
Designing/Supervision of Construction/Commissioning activities related to Electrical & Instrumentation including SSV/SSSV Tubing’s, calibration and installation of Process transmitters, Gauges, PSV’s, calibration of auto-choke, installation of Fire and Gas Equipment’s, Methanol injection and Corrosion Inhibitor Skids, installation of Solar Power System and Remote Terminal Units, establishing communication link with Central Processing Facility (CPF) and Gas Processing Facility (GPF) through Optical Fibers, installation of CCTV Camera’s System along with Anti Intrusion Detection System, installation of Wellhead Control Panel, and assisting Vendor in the commissioning of all vendor packages at many WHSF’s.
Tolanj Early Processing Facility.
Construction and Commissioning of Valve Assemblies
Construction and Commissioning of Produced Water treatment and Injection Facility.
Construction and Commissioning of power generation and Distribution system.
Construction and Commissioning of Renewable Energy Projects (Solar Systems).
Procurements/Contracts with relevant Vendors.
Technical Evaluations.
Installation and Commissioning of Multi Phase Flow Meter (MPFM)
Construction and Commissioning of weighbridges for product logistics system.
Misc. Projects such as Building Fire Alarm Systems, Security Cameras and Batch Controllers. This is a well-reputed, top ranked South Korea's leading construction company and took lead in the Korea's striking economical leap, as a mother company of Hyundai group; it gave birth to Hyundai Motors, Hyundai Heavy Industry as well as a hundred subsidiary companies. Quality Engineer (E&I): UCH-II (404MW) EXPANSION POWER PROJECT
(Feb 2011 to Dec 2012)
Previously, worked at UCH Power Limited (UPL) adjacent 404MW expansion Power project with Hyundai Engineering. I am responsible for department of Quality Assurance and Quality Control
(QA/QC) for Electrical & Instrumentation Scope. I am quite familiar with Project Management, Project Quality Plan and control of Engineering, Construction and Procurement activities during project.
SIDE ACTIVITIES
Carried out all inspection and test requirements of the UCH-II Project at all stages as per the method Statements, Specification requirements for all E&I work.
Assist in the initial assessment of the Contractor’s Project Quality Plan (PQP), Request for inspection and Testing (RIT’s) & control procedures as they relate to this specific discipline.
Monitor Contractor to ensure resolution of PAR/NCR/CAR’s in a timely manner.
Carryout surveillance and witness inspection of installation of all the E&I works.
Implement Integrated Management System (IMS) in my area of responsibilities.
Schematic Drawings interpretation & manipulation.
Preventive maintenance & asset management of power plant. ORIENT ENERGY SYSTEM (Pvt.) Limited MuzaffarGarh, Pakistan
(Jan 2009 to Feb 2011)
I worked as "Shift Charge Engineer" at Hashir Textiles (Pvt.) Ltd on Gas & Diesel engines. It is 50MW project of Orient Energy Systems. This is latest technology engines generators installed at this Power Plant.
Job Responsibilities:
Take over charge of the plant from his counterpart of outgoing shift.
Supervise the plant during shift hours for safe, efficient and smooth operation taking care of load demand, according to OEM recommendations.
Manage Personnel & technical management for smooth, trouble free operation of plant.
Analyze the fault from the history of machine data and to minimize deprecation of plant.
Handle emergency condition in case of machine breakdown.
Manage maintenance work team and assure QHSE standard scope of work. SUMMARY OF QUALIFICATION
Master of Science in Project Management, Comsats Institute of Information Technology
(2015-Continued)
Bachelor of Electrical Engineering, Islamic International Engineering College (2005-2009)
(Riphah International University) CGPA: 2.86
Concentrations in Industrial Distributed Control Systems and Process Field Instrumentation, Power System Analysis, Protection System of Switchgear, Transformer, Generator & 132KV/220KV Switch Yard, Plant Operation & Process.
Higher Secondary School Education, P.A.F Degree College Rafique Shorkot Cantt. (2002-2004) Secondary School Education, Govt. High School Abdul Hakim. (2000-2002) Certifications & Trainings
Certified Engineer by PAKISTAN ENGINEERING COUNCIL (PEC) Registration No: ELECT-26547.
Attend 2 Week Training of Programmable Logic Controller (PLC) at WAPDA Engineering academy. In detail training of C &I CRAFT MAN COURSE on Introduction to Analogue Control System, PLC System Layout and PLC System Maintenance.
Attend training sessions of Permit To Work (PTW) and become authorized PTW issuer at MOL OIL & GAS Co. Ltd.
INTERESTS
CCPP's Technologies DCS Interfacing & SACADA
Fire & Plant Safety HSE & IMS Policy
COMPUTER SKILLS
* Expert user of MS Office & Utilities * AutoCAD 2002, MS Project
* Engineering Software’s * Maximo
* Using Internet and Email at advance level
LANGUAGES
* Can Read, Write, Speak & Understand English at an advanced level
* Can Read, Write, Speak & Understand Urdu at an advanced level PERSONAL DETAILS
Father's Name : Munir Hussain.
Date of Birth : 04/06/1986
Marital Status : Married
Nationality : Pakistani
Religion : Islam
* Posses a valid passport.
* Ready for relocation or frequent travelling.
References, original certificates provided on demand.