PERSONAL INFORMATION
Surname: Masiu First Name: Monaheng Ishmael
Monaheng Identity 811**********
Preferred: Number:
Driver's Code C1 (code 10)
License:
Home Address: *** ***** ****, ******* 3
Sunstone road
Casttleview
Germiston
1401
South Sotho English, Tswana,
Home Language: Other IsiXhosa, IsiZulu
Languages:
South African
Nationality: Marital Married
Status:
Telephone No: (W) Cellular No: 071*******
Pr Techni Eng
ECSA Registration 201230182
E-Mail: *************@*****.***
EDUCATION DETAILS
High School:
High School Attended: Queens College
Highest Standard achieved: Grade 12 (2000)
Technikon / University:
Study Duration Institution Diploma/Degree
2001-2005 Tshwane University of National Diploma in Mechanical
Technology Engineering
University of Vaal University of Technology
Currently busy with BTECH
Short Courses:
Basic Hydraulic Course
Report Writing
Quality Control job observation and kaizen
Heat load Calculation course
SANS 10139
Solar energy
VRV commissioning
Piping
Computer Literacy:
Ms Word, Power Point, Excel and Outlook
Basic Auto Cad
Loadest
Daikin Pro
WORK EXPERIENCE
Practical 1
Duration: 5th January 2004 - 31st April 2004
Workshops: At Centurion College - courses
. General Machine
. Sheet Metal
. Welding
. Turning
. Basic Hand Tool
. Basic Electricity
Reason for leaving: finish the course
Practical 2
Nissan SA: Foreman
Rosslyn, Pretoria
Duration: 1st August 2004 - 31st January 2005
Responsibilities
. Work at Nissan SA as a Foreman at the MML (multi model line) production
line supervising 8 people
. Wrote SOS (standard operational sheet)
. I did job observation
. I did some operation e.g. Fitted boot light wires and did kaizen for
defects
. Checking and tracing the defects and also bringing solutions, updating
the Foreman's defect boards
. Compile End of Shift Report on a daily basis (Enquire and record time
lost during production)
. Fixing cars which are Side tracked
. I was doing fault finding on breaks system
. I spent time on each department: process engineering, Planning, body
shop, paint shop and wheel alignment for exposure
Reason for leaving: The lecture advised me to go to a company that does
mechanical not production
Practical 2
South Deep Mine: Internship Program
Westonaria (Burgersdal)
Duration: 1st February 2005 -31st December 2005
Responsibilities:
. Employed at South Deep Gold Mine as a Trainee. I worked in the following
sections: Refrigeration plant, Plan maintenance, Logistics, Mechanical
Work Shop, Gold Plant, Winders, Back Fill, Pump Station, Conveyer and
Trackless. In a section I spent a minimum of two months
. I was working with Artisans doing daily checks on winders
. Changed winder ropes6
. Fixed the skip wheels
. Assist in changing the balancing disk on the pumps
. Wrote the process of every section on my reports and recommendations and
submitted it to Mine Engineer for approval
. I worked on chair lift
. Fixed hopper
. I had a project on the installation of the door shoot
. Exposed to chilled water system
Reason for leaving: internship was for one year
Tshwane North College: Lecture
Pretoria, Mamelodi
Duration: January 2006 - April 2006
Responsibilities:
. Mechano technique N4
. Drawing NCOR
. Mathematic N2
. Mathematic NCOR
Reason for leaving: end of contract
SC Johnson: Internship Program
Rosslyn, Pretoria
Duration: 25th April 2006 - 31st April 2007
Responsibilities
. I worked on liquid line (filmatic) and Aerosol line
. I was a machine operator for three months (Working with labeling machine,
shrink wrapper machine and filler machine)
. I had a project on the unscramble machine
. For the 9 months I was working with SAP program
Reason for leaving: Got a permanent offer
Dihlase Consulting Engineers: Mechanical Technician
Randburg
Duration: June 2007 - October 2012
Responsibilities
Involved with the design and development of building services in the public
and private sectors
Conducting feasibility studies
Design the pipe system of Medical compressed air, medical gasses and Vacuum
installation.
Design Heating Ventilation and Air Conditioning Installations.
Design Fire detection installation.
Design Central heating.
Lift installation
Liaising with client bodies and contractors.
Compilation of Reports and Tender Documentation.
Cost estimating.
Tender evaluation.
Project Management.
A Consult Engineers: Mechanical Engineer
Edenvale
Duration: October 2012 - April 2013
Responsibilities
HVAC Projects with city property's JHB
Project name: Mr Price clear off store
Conducting feasibility studies
Design Heating Ventilation and Air Conditioning Installations
Liaising with client bodies and contractors.
Project Management (meetings, Site inspection, etc)
Project name : Marlborough house offices
Conducting feasibility studies
Approve payment certificate.
Design Heating Ventilation and Air Conditioning Installations
Compile an adjudication report.
Liaising with client bodies and contractors.
Project Management (meetings, Site inspection, etc.)
Project name : Windsor house shop
Budget estimate report
Design for Ventilation Installations
Compile an adjudication report.
Approve payment certificate.
Liaising with client bodies and contractors.
Project Management (meetings, Site inspection, etc.)
Project name : FHM Building basement ventilation
Design for Ventilation Installations
Compile an adjudication report.
Liaising with client bodies and contractors.
Project name : New gates shopping mall
Conducting feasibility studies
Design Heating Ventilation and Air Conditioning Installations
Compile an adjudication report.
Liaising with client bodies and contractors.
Project name : DB Schenker
Compile a tender document.
Design Heating Ventilation and Air Conditioning Installations (chilled water
system)
Project name : Pavilion shops pta
Design Heating Ventilation and Air Conditioning Installations
Liaising with client bodies and contractors.
Project Management (meetings, Site inspection, etc.)
Selanya Consulting Engineers: Mechanical Engineer
Bedford view
Duration: May 2013 - June 2014
Responsibilities
Project name : Market Theatre JHB
Liaising with client bodies and contractors.
Compile the site inspection report.
Ensure the selected equipment is within the noise level
Project name : Project management for SAPS
Compiling report as per the client requirement.
Project name : Laager Theatre
Conducting feasibility studies
Design Heating Ventilation and Air Conditioning Installations
Design for drainage
Design for Hot and cold water
Liaising with client bodies and contractors.
Project Management (meetings, Site inspection, etc.)
Project name : Villa lisa Clinic
Design Heating Ventilation and Air Conditioning Installations
Design for drainage
Design for Hot and cold water
Design for the Fire protection.
Liaising with client bodies and contractors.
Project name : ARV Clinic JHB (This project is in construction stage)
Heating Ventilation and Air Conditioning Installations
Drainage
Hot and cold water
Fire protection.
Liaising with client bodies and contractors.
Project name : Two JHB Mall
These two malls are still in concept design
Compile budget for the client
HVAC design
Project name : New Development (residential area)
Design for the Fire protection.
Liaising with client bodies and contractors.
Project name : Harpur
Compile budget Estimates
Design for Hot and cold water (central system)
Liaising with client bodies and contractors.
Project name : PTA hostels
Compile budget Estimates
Design for the Fire protection.
Design for Hot and cold water (central system)
Liaising with client bodies and contractors.
Project name : South west Gauteng College
Compile tender document.
Design Heating Ventilation and Air Conditioning Installations
Design for the Fire protection.
Design for Hot and cold water (Solar panels)
Liaising with client bodies and contractors.
I E S (Improve Air ): Mechanical Project Engineer
Kempton Park
Duration: July - current
Responsibilities
Project name : Mall of Africa (Chilled water system)
Liaising with client bodies and contractors.
Ensure the selected equipment is within the noise level
Purchase material
Ensure material a correctly specified
Providing information to the drawing office for construction drawing
Obtain and processing equipment submission
Ensure that pre site activity conforms to construction program
Responsibilities
Project name : East Rand Mall (heat pump system)
Liaising with client bodies and contractors.
Ensure the selected equipment is within the noise level
Purchase material
Ensure material a correctly specified
Providing information to the drawing office for construction drawing
Obtain and processing equipment submission
Ensure that pre site activity conforms to construction program
Compile O& M Manual
ATTRIBUTES
I would be an asset for any corporation in view of the fact that I am:
Confident
Hard Working
My Ability to handle challenge and to take on important responsibilities
My Ability to operate in a team environment as well as independently
My Ability to liaise with clients at all levels
Fast Learner
Self-Motivated
REFERENCES
Company Contact Name Telephone
1. SC Johnson Mr. Justice Mogola - Production Cell: 074-***-****
coordinator
2. Dihlase Mr. Jerry Lencoe Botong - Senior 012-***-****
consulting Engineer Cell: 084-***-****
Engineers
3. A consult Greg Senior Engineer
Cell: 084-***-****