RESUME
V.BALAMURUGAN
E-mail: ************@*****.***
Mobile no : +919*********
CAREER OBJECTIVE
To be successful professional by team work and achieve the goals of the company I am in.
ACADEMIC CREDENTIALS
DIPLOMA. – Mechanical Engineering,
Scad Polytechnic collage, cheranmadevi, Tamilnadu
Computer Proficiency:
WELL EXPERIENCED MS-WORD, MS-EXCEL, MS-POWER POINT,AUTO CADD and INTERNET APPLICATIONS
CAREER CONSPECTUS
Mechanical Engineer with 6 years experience in Construction & Project management in the field of fabrication of steel, STG Equipment & Oil piping, plant IBR&NIBR piping, Boilers piping, structural etc
CAREER HIGHLIGHTS
I have experienced in the field of Power plant Erection & commissioning in the following projects.
1. Name of the concern : ENERCORE POWER BUILDERS.
M/S DCW CHEMICAL & POWER LTD (2X25MW)
Tuticorin Dist, Tamil Nadu.
Job Responsibility : 2x25Mw Power Plant Erection & Commissioning
With BFP pump erection and alignment, ACW&MCW Erection,
Aux.Steam piping,NIBR&IRB piping Main stream piping&Boilerpiping
Designation : Erection Engineer
Period of Time : 01/06/2008 to 05/01/2009.
2. Name of the concern : ENERCORE POWER BUILDERS.
M/S DHARANI SUGAR & POWER LTD (1X25MW)
Kallakuruchi, Vilupuram Dist, Tamil Nadu.
Job Responsibility : 1 25Mw Power Plant Erection & Commissioning
1x25Mw STG (TDPS) Erection & Alignment,
With STG Equipment erection and alignment, Oil piping
Aux.Steam piping.
Designation : Site Engineer
Period of Time : From 10/01/2009 to 15/11/2009
3. Name of the concern : ENERCOREPOWER BUILDERS
M/S DEEPAK STEEL & POWER LTD (2X25MW)
Barbil, Orissa.
Job Responsibility : 2x25Mw Power Plant Erection & Commissioning
2x25Mw STG SET (Siemens) Erection & alignment
With STG Equipment erection, Boiler Feed Pump & ACW & MCW
Pumps, ACW & MCW Water Line piping, Oil Piping, Aux.Steam
Piping, plant NIBR & IBR piping.
Designation : Site Engineer
Period of Time : From 25/11/2009 to 11/12/2010
4. Name of the concern : ENERCORE POWER BUILDERS.
M/S SHREE CEMENT POWER LTD (2X150 MW)
Beawar, Rajasthan.
Job Responsibility : 2x150 Mw Power Plant Erection & Commissioning
Erection and Commissioning STG NIBR & IBR piping,
Aux.Steam piping, STG Steam piping and ACW Water piping.
Designation : Site Engineer
Period of time : From 22/12/2011 to 15/03/2012
5. Name of the concern : ENERCORE POWER BUILDERS.
M/S BHATIA COKE & ENERGY LTD (1X12.5 MW)
Gummidipoondi, Tamil Nadu.
Job Responsibility : 1 12.5Mw Power Plant Erection & Commissioning
1x12.5Mw STG SET (Siemens) Erection & Alignment,
With STG Equipment erection and alignment, Oil piping Aux.Steam piping.
Designation : Site Engineer
Period of time : From 25/03/2012 to 10/08/2012
6. Name of the concern : ENERCORE POWER BUILDERS.
M/S TULSIYAN POWER LTD (1X35 MW)
Gummidipoondi, Tamil Nadu.
Job Responsibility : 1 35Mw Power Plant Erection & Commissioning
1x35Mw STG SET (Siemens) Erection & Alignment,
With Equipment erection and alignment, Oil piping
Aux.Steam piping.
Designation : Site InCharge
Period of time : From 10/08/2012 to 15/01/2013
7. Name of the concern : ENERCORE POWER BUILDERS.
M/S PANDURANGA POWER LTD (1X38 MW)
Rajamandhri, Andhra Pradesh.
Job Responsibility : 1 38 Mw Power Plant Erection & Commissioning
1x38 Mw STG SET (SNM) Erection & Alignment,
With STG Equipment, Condenser erection, Boiler Feed Pump and alignment, Oil piping, Aux.Steam piping.
Designation : Site In charge
Period of time : From 20/01/2013 to 30/03/2013
8. Name of the concern : ENERCORE POWER BUILDERS.
M/S ITC PAPER & POWER LTD (1X25 MW)
Sarapaka, Andhra Pradesh.
Job Responsibility : 1 25 Mw Power Plant Erection & Commissioning
1x25 Mw STG SET (TDPS) Erection & Alignment,
With STG Equipment erection, Condenser erection and alignment, Oil piping, NIBR&IBR Steam piping,Main Steam piping.
Designation : Site In charge
Period of time : From 01/04/2013 to 12/11/2014
Inward materials inspection for its dimensional aspects, Verification of Specification and Grade, Material Traceability, mill defects and damages during transition .
Inspection during fit-up stage, inspection before, during and after welding.
Identification of required materials as per Approved Erection and Fabrication drawings
Arrangements of Materials, Manpower & Machineries to Sites as per requirement.
Leading a team of Technicians and Foremans.
Assist with Site Engineer Site routed piping drawings and As Built drawings for Hydraulic Testing of the systems.
Co-ordination with Quality Control department and planning department.
Co-ordination with Site Engineer for defects in materials, routing deviations, erection constraints, approvals, etc
Identifying extra works, extra material / manpower supply and reporting to Manager.
Maintaining accounts in my site.
Preparation of Protocols for completed inspection activities.
Submit daily field reports of all mechanical work activities to Manager.
PERSONAL PROFILE:-
Date of Birth : 21 Jun 1987
Gender : Male
Nationality : Indian
Marital Status : Single
Languages Known : Tamil,English, Hindi&Telugu
Permanent Address : 53/55,School Street,
Sanganapery, Sundaresapuram -627751
Tenkasi (Taulk), Tirunelveli (District)
TamilNadu, India.
FUTURE OUT LOOK
To enhance abilities through exposure to latest technologies, achieve a steady enhancement in career by Being loyal to the company and growing together.
Yours faithfully,
PLACE: V.BALAMURUGAN
DATE: