Post Job Free
Sign in

Project Construction

Location:
Dammam, Eastern Province, Saudi Arabia
Salary:
4000USD
Posted:
November 15, 2015

Contact this candidate

Resume:

Name: RONEILEX P. DOMINGO

Nationality: Filipino

Languages: English and Filipino

Email Address:**********@*****.***

Contact Information: +966-0565730868 Saudi,

:+63-092******** roaming

Position: Mechanical Inspector(Client Representative)

Professional Qualification: Licensed Mechanical Engineer

Licensed Number: 0064193

Years of Work Experience: 8+ years

Geographical Areas of Work: Philippines, Saudi Arabia & Qatar

CSWIP 3.1 Cert. #: 55037

API-653 Cert.#: 60221

ISO 9001-2008QMS Cert. # PP-QMS03-2692

Saudi Aramco Personal (SAP) #: 70009451

Qatar Petroleum:Piping/Welding Inspector Approved

International Codes Standard Used:ASME B31.1 / B31.3, ASME Sec. V, VIII Div.2, IX, API 1104,

API 650, API 620, API 610, AWS D1.1 ISO Standard, BS Standard, Aramco & QP Standard

WORK EXPERIENCES:

Position: Mechanical Inspector (Client Representative)

Company: Saudi Aramco General Inspection Services under the sponsorship of Construction Technical Services Arabia LTD (CTSA)

Project: Loading Rack Facility at Rastanura Distribution Project

Duration: May 2015 to Present

Position: Mechanical Inspector (Client Representative)

Company: Saudi Aramco General Inspection Services under the sponsorship of Construction Technical Services Arabia LTD (CTSA)

Project: Upgrade Gas Flow Capacity AH crude Oil Sales Gas & Ethane Pipeline

Duration: January 2015 to April 2015

Position: Mechanical Inspector (Client Representative)

Company:Saudi Aramco General Inspection Services under the sponsorship of Construction Technical Services Arabia LTD (CTSA)

Project: Yanbu Aramco Sinopec Refining Company (YASREF)

SP-1 Tank Farm Package

Duration: January 2012 to December 2014

Responsibilities

Work as Mechanical Inspector client representative responsible for all quality concerns relative to mechanical activities in my package of jurisdictions such as welding, piping, storage tank construction, Construction of Sphere pressure Vessel, Construction of Spheroid Low Pressure Storage tank, API Pumps Installation ensure the compliance with the project specification, standards & codes.

Maintain a look-ahead schedule of proposed Expenditure Requests in order to facilitate the planning for inspection manpower, office, and accommodation requirements based on Project Quality Plans and Schedule “Q” of attachment VI.

Assist PMT in enforcing and interpreting Company standards codes and specifications, and recommend solutions to construction problems/ violations and if possible consult with the assigned Specialist in the Engineering Services Organization.

Review & Approved the Contractor's quality control documents and test results for conformance to project requirements such as Inspection Test Plan (ITP), Procedures, and Method Statement and submittal of special process based on Schedule “Q” requirement.

Conduct interview of Contractor's proposed QC personnel & disqualified any individual if found unsatisfactory performance.

Initiate weekly quality meeting with the contractor to discuss quality highlights such as Log Book Entry, Proactive Notifications, General Comment, Standard Violation, NCR to ensure that such problems does not happen again.

Liaise with the PMT regarding corrective actions against NCR.

Ensure that all welding procedure is approved and welders are qualified.

Conduct site surveillance of welding activities before, during and after welding basis to ensure that they follow the WPS and related standards.

Perform inspection on cylindrical tank with, floating roof, dome roof, internal floating roof, spheroid low pressure storage tank, spherical pressure vessel, check the foundation level, tank bottom plates laying inspection, material traceability.

Perform inspection of tank shell plates erection, fit up of vertical & horizontal joint, nozzles orientation, stair & structural related to tank, Bottom test(vacuum box test), oil penetrate test(OPT) Pneumatic test of nozzles pad, Plumbness( verticality), peaking, banding, roundness, hydro test, Hydro pneumatic test inspection.

Review of Tank & Piping Hydro Test Package & NDT requirement according to code API 650, API 620 ASME VIII div.2.

Perform Final Inspection for PMCC requirement identifies if “YES Item” or “No items” and ensure that all open logbook entries, NCRs, and Worksheets are resolved or included on the exception item List.

Position: QA/QC Inspector – Piping/Welding

Company: Black Cat Engineering & Construction W.L.L

Company Address: Dukhan, Qatar.

Project: Epic for Produced Water Treatment & Injection Phase II

Client: Qatar Petroleum.

Duration: March 2011 to October 2011

Position: QA/QC Inspector – Piping/welding

Company: Black Cat Engineering & Construction W.L.L

Location: Dukhan, Qatar.

Project: Epic of Sweet Fuel Gas Supply to Dukhan Consumers

Client: Qatar Petroleum

Duration: November 2010 to March 2011

Position: QA/QC Inspector – Piping/Welding

Company: Black Cat Engineering & Construction W.L.L

Location: Dukhan, Qatar.

Project: EPIC of Smokeless Flare & Automatic Blowdown System and New Control Room at (Fahahil Stripping Plant Dukhan)

Client: Qatar Petroleum

Duration: July 2009 to November 2010

Responsibilities:

Piping:

Preparation & Review of Test Packs for hydro testing, Line checking as per requirement.

To conduct in-process shop/field production inspection including verification and acceptance of all quality control hold point indicated to travellers against approved drawing and specification.

Review and check the flow and orientation of piping on AFC drawing based on actual field installation at site.

Check dimension and location of on plot piping as per required on the AFC Isometric & P&ID drawings.

To check specified materials given on the AFC drawing including classification of bolts and gaskets.

Materials checked by colour coding, wall thickness and stamping of pipes.

Perform line check and issue internal punch list to construction section.

To fill date of line check and date of internal punch completion in control sheet.

Conduct final inspection, prepare punch list and verify completion of punch items

Check and review all item as per line class

To conduct final inspection of materials from laydown area to be delivered at fabrication shop and at site.

Prepare and review Hydro test package and other necessary document prior to hydro testing such as P&ID, Isometrics drawing, weld log sheets and NDT reports

Witness hydro & pneumatic test, water flushing, service test

To prepare all equipment punch lists and verifies all items are in place and act as an agent for the Company during punch list activity.

To collate all relevant documentation for the job and apply the data to the creation of a Test Pack to undertake pre-hydro test inspection activity

Welding:

Conduct Welder’s Qualification Test (WQT) based on the given procedures with respect to applicable code, standard and specification for the requirements of the project.

Check fit-up/dimension, orientation of pipe and prior for welding.

Check visual inspection of weld joint for monitoring and acceptance.

Prepare inspection reports such as weld visual, weld summary, Hydro test reports.

Coordinate NDT test of piping system such as RT, PT, MT, Hardness Test based on standards and project requirements

Check and monitor the welding percentage repair rates of individual welder.

To conduct in-process shop production inspection including verification and acceptance of all quality control hold point indicated to travellers against approved drawing and specification.

Make sure that all NDT requirement is completed prior to release for painting

Preparation of Hydro test packs.

Witnessing of piping hydro test.

Review of project related procedures and method statements

Execute quality assurance inspection on project/construction works to ensure compliance with QP Standards.

Review of material test certificates.

Review and interpretation of RT films as per codes and specifications,

Supervising and monitoring all welding related inspection activities.

Witnessing of Non Destructive test, Pneumatic test, Hydro test and Load test.

Ensure that inspection stages are carried out in line with approved inspection plans and/ or procedures.

To undertake verification of welding machines to ensure equipment meets job requirements specification and provide verification of electrode baking and holding temperature including control and issue

To monitor Welder performance and conduct visual inspections of welds and repairs of welds in accordance with Company procedures and international codes of practice.

To coordinate with clients to undertake Procedure Qualification Tests (PQT) and inspections of prepared test specimens and witness destructive tests

To identify and prepare Welding Procedure Specification (WPS) & PQR for jobs as per project specifications and verify Welders meet PQR requirements

Position: QA/QC Inspector – Piping

Saudi Aramco Personal #: 70009451

Company: Nesma& Partners Const. Co. Ltd.,

Project : Shaybah Central Processing Facilities (Gas & Oil Separation Plant Project) GOSP-4

Client : SNC Lavalin (Saudi Aramco Project)

Duration: July 2008 to July 2009

Responsibilities:

Responsible for inspection of materials as per codes and process standards specification.

Perform inspection of fit-ups and dimensions, orientation as per drawing specification.

Monitoring work and ensuring uniformity and consistency in the application of the procedures in conformance of project specification requirements.

Coordinate NDT test of piping system such as RT, PT, MT PWHT, BHN based on standards and project requirements.

Responsible for inspection in accordance with specifications and procedures of the piping fabrication and erection / installation and the compilation / retention of QC reports and records.

Prepare and review Hydro test package and other necessary document prior to hydro testing such as P&ID, Isometrics drawing, weld log sheets and NDT reports.

Conduct in-process inspection during pipe installations and construction.

Request for Inspection (RFI) and witness of hydro& pneumatic Testing.

Responsible for inspection of internal cleanliness of piping system such the method of pressurized Air Shock Blowing (PASB), Chemical, Hydro-milling cleaning.

Conduct and prepare surveillance reports on all piping activities which does not conform to Aramco and ASME standards.

Verification & clearing of “A” item construction punch list.

Ensure drawings are in current revisions and approved by the customer authorized representative

Prepare reports and documentations for all inspection and testing activities.

Familiar on Saudi Aramco code and standard using SAIC, SATR, SATIP and SAES for inspection.

Involved in hydro testing of all valves to be used on all aspects of piping system.

Responsible for conducting the inspection activities and enforcing the applicable standards,

Line checking of pipelines, which cover check-up for proper instillation and of standard pipe supports and in accordance with isometric drawing. Inspect and witness piping re-instatement and bolt torqueing.

Monitoring chemical cleaning of storage tanks (flushing, degreasing, acid cleaning and passivation) and final internal inspection.

Position: HSE Officer

Company: Consolidated Contractors Company (CCC)

Location: Saudi Arabia

Project : KGP (Khursaniyah Gas Plant Project)

Client : Bechtel Technip Joint Venture (BTJV)(Saudi Aramco Project)

Duration: January 2007 to March 2008

Responsibilities:

Undertake daily inspection tours in area of responsibility to ensure of implementation of adherence to the procedures set out in the HSE Site Plan Group HSE Manual and any additional project specific requirements.

Take necessary action to rectify breaches of procedures or newly identified hazards, to ensure safe working conditions. Refers more complex issues to a senior HSE authority.

Complete the daily activity reports, bringing to attention actions taken on identified matters of concern and issues requiring resolution by higher authority.

Identify potential hazards on new contacts before work commences and take action to have it rectify.

Conducts Daily Inspection in the site ensuring that all safety measures included in the Project HSE Plan have been carried out accordingly.

Attends the Joint Weekly HSE Construction Walk Through by Saudi Aramco, BTJV, CCC& Subcontractors on a regular basis.

Ensure that safe working and emergency procedures have been carried out in the project site.

Participate in the Incident/Accident investigation along with the site /Construction Manager, HSE Supervisor Team Leader.

Promote periodical safety talks & training with the area Construction Supervisor, Forman & Charge Hands through the Safety Task Assessment Risk Reduction Talk (STARRT) Cards.

Active participate in the Near Miss Reporting by encouraging Construction to be alert in identifying Near Misses, unsafe acts, condition & practices in the site.

Ensure that appropriate works permits are carried out accordingly & systematically.

Ensure “Permit to Work” (PTW) compliance, ensure all personnel aware of the system on system operates and review that the system is being followed by all personnel.

Advise about further improvements in existing working methods suitable standards PPE to be use on the job.

Position: Product Development Engineer & Quality Assurance Officer

Company: Mega Gem Wiring System Inc

Company Address:

Duration: July 2005 to August 2006:

Responsibilities:

Product Development Engineer:

Develops and coordinates with customer regarding new products for development.

Prepares Bill of Materials of all materials used for costing particular for new items Prepares production cutting specification, working Instructions, Product Specification Guides, Actual Samples

Coordinates all necessary production equipment for mass production in terms of tooling, set up, Testing Equipment, and Fixtures

Coordinates with suppliers for new materials for production use.

Prepares necessary documents for qualification, engineering analysis report, Declaration Forms for R.O.H.S

Collects necessary tack-time for issuance of new item/ product standard cycle time

Quality Assurance Officer

Collects data for study of rejection rate for quality efficiency.

Prepares and collects data regarding quality problems and formulates corrective actions.

Conducts quality assurance meeting that promotes awareness comprehensive quality analysis.

Line monitoring during in process to ensure during actual process.

Evaluates all production quality rejection and formulates long term corrective action plan

TRAININGS AND SEMINARS ATTENDED:

ISO-9001-2008 Quality Management System Auditor/Lead Auditor NevilleClarke

CSWIP 3.1 Welding Inspector TWI

Comprehensive Training Program for Oil and Gas Drilling Basic Introduction for Drilling Technology

Introduction to Hydrogen Sulphide H2S RODECH

IADC Rig Pass Orientation & Basic Safety Awareness RODECH

First Aid at Oil & Gas Drilling Rig RODECH

Basic Occupational Safety and Health for Construction RODECH

EDUCATIONAL BACKGROUND:

Bachelor of Science in Mechanical Engineering

Technological Institute of the Philippines, Manila, Philippines

Graduated on : April 12, 2004

Passed Licensure Exam on: October 2004

PRC Registration #: 0064193

Secondary Education

Isabela National High School

# 132 Claraval St., San Vicente, Ilagan, Isabela

(1996 - 1999)

Primary Education

Bigao, Elementary, School

Brgy.Bigao, Ilagan, Isabela

(1989 - 1996)

I certify that above information are certified true and correct to thebest of my knowledge and belief.

RONEILEX P. DOMINGO



Contact this candidate