CURRICULUM
Applicant Name: DANTE A. DEMEGILIO
Position Applied: PIPEFITTER
Address: */** ******** *** **** CANNINGTON 6107
Mobile number: 043*-***-***
AVAILABILITY: CAN WORK AS SOON AS POSSIBLE
Email Add: ************@*****.***.**
Birth Date: OCT.30, 1970 Birth Place: MANILA
Height: 5’6” Weight: 68 KGS
Educational Information
Education Yr – To School/Address Course
Tertiary
1988 - 1991
(UNDERGRADUATE)
FEATI UNIVERSITY / WEST NEGROS COLLEGE
Philippines
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
Vocational
1996 - 1997
(UNDERGRADUATE)
VISAYAN MARITIME ACADEMY
Philippines
BMMC
High School
1983 - 1988
FOUNDATION COLLEGE Philippines
Elementary
1977 - 1983
DON JALANDONI ELEM SCHOOL Philippines
Employment Information;
COMPANY : DOWNER/TECNICAS REUNIDAS
ADDRESS : TAN BURRUP KARRATHA
POSITION : PIPEFITTER
INCLUSIVE DATE : 28 AUGUST 2014 – 14 NOVEMBER 2014
JOB DESCRIPTION AND REAPONSIBILITIES;
PROJECT : AMMONIA REFINARY EXTENSION (COMPRESSOR)
FITTING UP STAINLESS STEEL, CARBON STEEL, CHROMOLY AND LOW TEMP PIPE RANGING TO SMALL BORE TO 60’ DIAMETER
SCHEDULED TO 20, 40, 80, AND 120 HEAVY WALL PIPES.
WORKING AT THE COMPRESSOR RISER AND RESPONSIBLE ON THEIR TRUE NORTHING, EASTING AND ELEVATIONS
RESPONSIBLE FOR THE WELDERS WELDING ACCURACY REGARDING ON GAPS AND BEVELS NEEDED FOR WELDING PROCEDURE
APPLYING TRIGONOMETRIC CALCULATIONS FOR THE DEGREE OFFSETS AND ANGLES SPECIFIED BY THE ENGINEERING DEPT. AND MODIFICATIONS.
JOINTING PIPES FROM MODULE TO MODULE
INSTALLING DIAPHRAGM VALVES, CHECK VALVES, GATE VALVES AND MOTOR OPERATED VALVES
FITTING UP PIPES TO THEIR CORRECT MEASUREMENT, SPOOLS, MATERIALS, FITTINGS AND ORIENTATION BASED ON THE DRAWING GIVEN BY THE SUPERVISOR
RESPONSIBLE FOR THE SAFETY OF MY CO-WORKERS BY DOING PRE-START, HOUSEKEEPING AND SECURING THE HUMPY TO PREVENT ANY HAZARDS.
COMPANY : AUSTAL SHIPS
ADDRESS : HENDERSON MARINA BAY
CONTACT PERSON : (DAVID CRAMER supervisor)
POSITION : PIPEFITTER
INCLUSIVE DATE : 02 AUGUST 2013 – 16 JAN 2014
PROJECT : PATROL BOAT (NAVY DEFENSE)
JOB DESCRIPTION AND REAPONSIBILITIES;
MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING
CALCULATING EACH NORTHING, EASTING AND ELEVATION TO MEET THE DESIRE HEIGHTS OF THE PIPE LINE AND EACH SYTEM
MITTERING AND FABRICATING SPECIAL ELBOWS LIKED 22.5, 15 AND 30 DEGREES ELBOWS
FITTING UP AND INSTALLING FIRE FIGHTING SYSTEM, GREY WATER SYTEM, CRUDE OIL SYSTEM, AND BLACK WATER SYSTEM USING STAINLESS STEEL PIPES AND COPPER PIPES.
RESPONSIBLE FOR WELDERS WELDING ACCURACY
BENDING TUBES 8MM TO 12MM DIAMETER
PARTICIPATING IN HYDRO TESTING AND AIR TESTING UP TO 7 BAR CAPACITY
WELDING STRUCTURAL AND PIPE USING ALUMINUM WIRE AND TIG WELDING
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES
AND READING PIPE DIAGRAM, ISOMETRIC, 3D FOR TAKING OFF MATERIALS AND EACH OF THEIR COMPONENTS TOO AND TO THEIR CORRECT ORIENTATION
COMPANY : OBI RECRUITMENT AGENCY (SUSTAIN-AG)
ADDRESS : NARRABRI NEW SOUTH WALES
CONTACT PERSON :( MISS JOANN)
POSITION : WELDER/ FITTER
INCLUSIVE DATE : 13 MARCH 2013 – 28 APRIL 2013
PROJECT : AGRICULTURAL PRECISION TOOLS AND EQUIPMENT
JOB DESCRIPTION AND REAPONSIBILITIES;
MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING
WELDING FILLET JOINTS, LIFTING LUGS, C TUBES USING MIG AND ARC WELDING MACHINE
INSTALLING AND ASSEMBLING BEARINGS, BLADE WHEELS AND COMPONENTS FOR THE PLANTING SEEDS
ALLIGNING AND FITTING UP HYDRAULIC TUBES AND FITTINGS INCH AND INCH DIAMETER
BENDING AND PRESSING TUBES FOR SEED PLANTING AND COMPRESSING BEARINGS TO THEIR CASING
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES
COMPANY : WESTRALIAN ENGINNERING
ADDRESS : HENDERSON PERTH
CONTACT PERSON : AMIE GA (foreman)
POSITION : PIPE FITTER/ BOILERMAKER
INCLUSIVE DATE : 14 JAN 2013 – 18 FEB 2013
PROJECT : APACHE WATER PIPELINE
JOB DESCRIPTION AND REAPONSIBILITIES;
MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING
CHECKING ALL COMPONENTS WITH THEIR TRUE GIVEN DIMENSION AND MEASUREMENT BEFORE INSTALLING
PIPELINES IN THE SKID WITH THEIR TRUE ORIENTATION
FABRIATING SKID, PIPE RACK, PIPE SUPPORT
MITTERING AND CUTTING PIPE WITH ANGLES GIVEN BY THE DRAWING
FITTING UP ELBOWS AND FLANGES WITH DEGREES SPECIFIED BY THE DRAWING
FITTING UP CARBON STEEL PIPE SIZES 2”DIAMETER TO 12” DIAMETER WITH SHCEDULE 40 TO EXTRA STANDARD
TACKING WITH BULLETS BY TIG WELDING
COMPANY : SPECIALISED WELDING AUSTRALIA
ADDRESS : HAZELMERE ABERNEETHY RD.
CONTACT PERSON : REAL ALDOVINO (shop supervisor)
POSITION : BOILERMAKER
INCLUSIVE DATE : 22 JUNE 2012 – 15 OCTOBER 2012
PROJECT : ALCOA – HEATER PRESSURE VESSEL
JOB DESCRIPTION AND REAPONSIBILITIES;
MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING
CHECKING ALL COMPONENTS WITH THEIR TRUE GIVEN DIMENSION AND MEASUREMENT BEFORE INSTALLING
FABICATING AND REPAIRING BUFFLE PLATES, PIPE TUBES, RINGS, AND PIPE NOOZLES
BEVELING ACCORDING TO THEIR DEGREE SPECIFIED FOR WELDING PENETRATION AND ACCURACY
ALLIGNING PIPES TUBES INSERTED THRUOGH AND THROUGH TO EACH OF THE BUFFLE PLATES
JOINTING SIM WELD PIPE ROLLED PLATE, PIPES SIZES 16” TO 1500 MM DIAMETER; SCH 160 TO 16 MM THICKNESS
PROJECT : CIVMEC – WATER FACILITIES
JOB DESCRIPTION AND REAPONSIBILITIES;
CUTTING PIPES AND SPOOLING ACCORDING TO THEIR DIMENSIONS AND THEIR TRUE LENGTH SPECIFIED BY THE DRAWING
FABRICATING COMPADS AND PIPE SUPPORT ACCORDING TO THEIR ELEVATIONS AND DEGREE FALL
INSTALLING PIPE SUPPORT TO THEIR EXACT MEASUREMENT
JOINTING PIPES WITH 3mmTO 4mm GAP AND WITH THEIR TRUE ORIENTATION, DEGREE OFFSET AND ELEVATION,SIZES TO 50mm to 24” DIAMETER; SCH 80 TO 180; CARBON STEEL; STAINLESS STEEL AND ALLOY AND FITTINGS ALL SPECIFIED BY THE DRAWING
CUTTING PIPES WITH DEGREE ANGLE, LATERAL
HOUSEKEEPING
COMPANY : VALE STEEL INDUSTRIES
POSITION : FABRICATOR
INCLUSIVE DATE : AUGUST 03 2010 – MAY 13 2012
PROJECT : CONCRETE MOULDING
JOB DESCRIPTION AND REAPONSIBILITIES;
FABRICATING ALL INNER AND OUTER STRUCTURAL COMPONENTS FOR CHUTES, TANKS, AND MOULDINGS
FABRICATING LIFTING LUGS, EYE PAD, GASSETS PLATE, WEB FLANGES, DOWELLS, STEEL FRAMES
ASSEMBLING, JOINTING, SPLICING ACCORDING TO ITS DRAWING SPECIFICATIONS AND TRUE ORIENTATION
MARKING LAY – OUTS FOR HOLES AT SQUARENESS AND ACCORDING TO ITS DRAWING SPECIFICATIONS
CUTTING PLATES 10MM TO 100MM THICKNESS WITH QIUCKIE SPECIFIED BY THE DRAWING
RESPONSIBLE OF DOING GROOVES, BEVELS FOR WELDERs WELDING ACCURACY
WELDING FILLET JOINTS AND BUTT JOINTS USING FCAW, MIG, SMAW, TIG
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES
POSITION :BOILERMAKER (QUEENSLAND AUSTRALIA)
INCLUSIVE DATE :JANUARY 19, 2009 – MAY 15 2009
COMPANY :GLADSTONE PRESSURE WELDERS
PROJECT :YARWUN RIO TINTO TANKAGE PROJECT
AGITATION TANK CCL DUMP TANK COARSE SEED FILTRATION TANK PURIFIER TANK WINERY TANK
JOB DESCRIPTION AND RESPONSIBILITIES;
FABRICATING AND INSTALLING CARBON & STAINLESS STEEL TANKS, TANK COMPONENTS, CONE AND SPHERE, PIPE NOOZLES, CLADDING, SPHERE BOTTOM PLATE, LADDER, FRAMES, CHUTE, PLATFORMS, PIPINNG AUXILLIARIES, VESSELS.ALL DETAILS AND SECTIONS ARE VERIFIED BY THE FOREMAN FOR TRUE AND CORRECT ORIENTATION.
WELDING FILLET JOINTS ACCORDING TO WELDING SPECIFICATIONS USING TIG,MIG,SMAW
VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY LAY OUT FULL SCALE DRAWINGS
RESPONSIBLE FOR WELDER’S WELDING ACCURACY,
RESPONSIBLE OF DOING ACCURATE BEVELS AND GROOVES
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES
POSITION :BOILERMAKER (QUEENSLAND AUSTRALIA)
INCLUSIVE DATE :APRIL 24, 2008 – DECEMBER 09, 2008
COMPANY :TOWNSVILLE ENGINEERING INDUSTRY PTY LTD
PROJECT :MINING EQUIPMENT & FACILITIES
JOB DESCRIPTION AND RESPONSIBILITIES;
VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY LAY OUT FULL SCALE DRAWINGS
FABRICATING AND INSTALLING CARBON & STAINLESS STEEL COMPONENTS,TANKS,FRAMES,TROMMEL.,SQUARE TO ROUND,CONE
CHUTE,VESSELS AND PIPE RACK, PIPE AND STRUCTURAL CONVEYOR.ALL DETAILS AND SECTIONS ARE VERIFIED BY THE FOREMAN FOR TRUE AND CORRECT ORIENTATION
SPILCING AND FITTING UP CARBON & STAINLESS STEEL -STEAM STRESS,TANK, PIPE AUXILIARIES,PIPE NOOZLES,6”DIA TO 12” DIA RANDOM PIPES ACCORDING TO THEIR DRAWING SPECIFICATIONS.
WELDING AND TACKING CARBON STEEL PLATE AND STRUCTURALS USING FCAW,MIG,SMAW AND TIG
REPAIRING AND ACTUAL FIXING MINING EQUIPMENTS,GAS TANK,HEAVY EARTH MOVING EQUIPMENT WASHING OUT WELD BEADS BY GOUGING AND CUTTING TORCH
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
RESPONSIBLE OF DOING ACCURATE BEVELS AND GROOVES
RESPONSIBLE FOR MAINTAINING USING THE HIGH PROFILE CUTTER(OXY-ACETYLENE)
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING
POSITION :PIPE/STRUCTURAL FITTER (LOUISIANA, U.S.A)
INCLUSIVE DATE :DECEMBER 09, 2006 – OCTOBER 30, 2007
COMPANY :GIS ENGINEERING SERVICES, A DIVISION OF GRANDISLE SHIPYARD
PROJECT :RELIANCE & BG TOBAGO JACKET LEG OFFSHORE PLATFORM
(MCDERMOTT FABRICATION)
JOB DESCRIPTION AND RESPONSIBILITIES;
FITTING UP FULL SIZE X & Y LATERAL PIPE BRACES SCHEDULE-120,48 INCHES DIAMETER,82 FEET LONG
FITTING UP RANDOM RUBBER COATED ALLOY STEEL PIPE 16 INCHES DIAMETER,PIPE LEG,WATER SUNCTION PIPE,
PIPE SUPPORT,SPRINKLER,ANODES
FABRICATING PRESSURE VESSEL AND ITS INNER STRUCTURED COMPONENTS AND PIPINS SYSTEM
FABRICATING AND WELDING, INSTALLING HELIPADS, STRUCTURAL AIR DUCTS,SKIDS,CHUTES,OFFSHORE PLATFORM DECK, OFFSHORE OIL RIG PLATFORM, H-BEAM,I-BEAM TANKS, TANKS COMPONENTSAND ITS PIPINS AUXILLIARIES, SQUARE TO ROUND STRUCTURED AIR DUCT,AND CONE ALL SPECIFIED BY THE DRAWING
SHIP REPAIR (BARGE) AND PREPARATIONS BEFORE LOADING FULL SIZE JACKET LEG OFFSHORE PLATFORM,DECK
PARTLY INVOLVED IN HYDRO TESTING
RESPONSIBLE OF DOING ACCURATE BEVELS AND GROOVES
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES………
POSITION : PIPE FITTER (TAIWAN)
INCLUSIVE DATE : JUNE 07, 2005 – MAY 15, 2006
COMPANY : SAMSUNG ENGINEERING IND. (FORMOSA PLASTIC IND . AND REFINERY)
PROJECT : SHUTDOWN R4 &R5 AND R6 REHABILITATION
JOB DESCRIPTION AND RESPONSIBILITIES;
FITTING UP 6 INCHES CARBON STEEL TO 54 INCHES DIAMETER AND 8 INCH DIAMETER STAINLESS STEEL RANDOM PIPES AND THEIR FITTINGS ELEVATED TO 10M TO 15 METERS FOR THREE DIFFERENT HIGH RISE PIPE RACK
FITTING UP 10 INCHES TO 12 INCHES DIAMETER PIPE LOOPING HORIZONTALLY AND VERTICALLY
FITTING UP 24 INCH DIAMETER HEAVY WALL (J-GROOVE BEVEL) RANDOMLY AT HIGH RISE PIPERACK
FITTING UP ALL TYPES OF VALVES MANUALLY TO MOTOR OPERATED VALVES
FITTING UP AUXILIARY PIPES AND STEAM STRESS PIPES
FITTING UP PIPE BRANCHES TO LIVE OPERATED PIPE HEADER(TIE-IN) WITH HOT-COLD WORK PERMIT AND HOT WORK PREPARATION
WELDING STRUCTURAL FOR PIPE SUPPORT AND COMPONENTS
REPAIRING WELDING JOINTS CAUSING FORMS LIKE SLUG, PINHOLE AND IMPENETRATED WELDING.
DEMOLISHING OLD EXISTING PIPE LINES BY COLD CUTTING EQUIPMENT AND HOT CUTTING EQUIPMENT
FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES
SPLICING AND INSTALLING FITTINGS AND EXISTING PIPE LINES ARE ALL SPECIFIED BY ISOMETRIC DRAWING GENERAL PLAN AND P&ID
SELF-OWNED RIGGING TECHNIQUE AND SCAFFOLDING
VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION FOR DEGREE OFFSET,FITTINGS TAKE OFF,LATERALS AND SADDLES
PARTLY INVOLVED IN HYDRO TESTING,OIL FLUSHING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
ASSIGNED IN PWHT
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE
POSITION :PIPEFITTER/POLY WELDER (MENA ABDULLAH KUWAIT)
INCLUSIVE DATE :AUGUST 01, 2002 – DECEMBER 31, 2004
COMPANY :NATIONAL INDUSTRIES COMPANY
PROJECT :HDPE TANKS AND PIPE MANUFACTURER
JOB DESCRIPTION AND RESPONSIBILITIES;
1) REPAIRING UNDERCUT LINING
2) WELDING PLASTIC USING EXTRUSION GUNNER
*PIPE SOCKET WELD JOINTS
*BUTT JOINTS BEVELED 50MM DEEP
*FILLET AND OVERLAPPED JOINTS
*TANKS USED FOR UNDERGROUND,MANHOLE,ELECTRICAL PUMP ROOM
*PATCHING
3)EXPERIENCED IN FABRICATION
* SADDLES
*TEE BRANCH,Y BRANCH,
*ELBOWS IN PIECES (MITER)
*TANKS
*ECCENTRIC AND CONCENTRIC CONES
*TANK NOOZLES
* 30,45,TO 60 DEGREES LATERALS
VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION,MARKING,LAY OUT FULL SCALE DRAWING
4)SPLICING PLASTIC PIPES 60CM TO 2METERS DIAMETER USING SOME EQUIPMENT
*INTERNAL RING EXPANDER
*PRESSURE RING THIGHTENER
*U-COILED BRASS HEATING POLARITY
*WELDING APPARATUS kr 500-KWS
WELDING PROCESS --THE PARAMETERS WILL BE APPLIED SPECIFIED TO THEIR DIAMETER,VOLTAGE AND TIME LIMIT RIGHT AFTER THE PRESSURE RING THIGHTENED
ONTO THE SOCKET WELD JOINT AND CONNECT THE HEATING ADAPTER AND BEGIN THE PROCESS. –
PARTLY INVOLVED IN HYDRO TESTING AND WEIGHT TESTING (BACK FILLING DURABILITY)
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES……
POSITION :PIPEFITTER (SINGAPORE)
INCLUSIVE DATE :JUNE 20, 2001 – FEBRUARY 04, 2002
COMPANY : PLANT ENGINEERING CONSTRUCTION PRIVATE LTD.
PROJECT :PFIZER ASIA REFINERY & MOBILE EXXON SERRAYA POWER PLANT
JOB DESCRIPTION AND RESPONSIBILITIES;
(PFIZER ASIA REFINERY)
RESPONSIBLE OF MARKING AND DRILLING CONCRETE HOLES SPECIFIED FROM THE NORTHERLY
EASTERLY AND ELEVATION OF THE DRAWING
FITTING UP VERTICAL 16 INCHES STAINLESS STEEL PIPE SUPPLY LINES
FITTING UP ALLOY,CARBON,STAINLESS RANDOM PIPE STEEL FROM PIPE RACK DOWN TO MOTOR PUMP ROOM
FABRICATING AND WELDING, INSTALLING PIPE SUPPORT,INSTALLING VALVES
FABRICATING AND FITTING UP FIRE FIGHTING EXISTING LINE
SPLICING AND INSTALLING FITTINGS AND EXISTING PIPE LINES ARE SPECIFIED BY ISOMETRIC DRAWING AND GENERAL PLAN
VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION,MARKING,LAY OUT FULL SCALE DRAWING
SELF-OWNED RIGGING TECHNIQUE AND SCAFFOLDING
VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION FOR DEGREE OFFSET,FITTINGS TAKE OFF,LATERALS AND SADDLES
PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES
( SHUT DOWN EXXON SERRAYA POWER PLANT )
HOT AND COLD WORK PREPARATION WITH PERMIT PROCEEDING AFTER HAVING A HOT AND COLD PERMIT
INSTALLING TIE – IN WORK OF OBSOLETE PIPE ANGLES AND FITTINGS BRANCHING TO PIPE HEADER
DEMOLISHING OLD EXISTING PIPE LINES BY COLD CUTTING EQUIPMENT AND HOT CUTTING EQUIPMENT
FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES
UNBOLTING FLANGE WITH SEQUENCE FOR REPLACING GASKETS, BOLTS AND FITTINGS………
POSITION :PIPEFITTER (ABU DHABI, UAE)
INCLUSIVE DATE :JANUARY 13, 2001 – APRIL 30, 2001
COMPANY :DESCON ENGINEERING
PROJECT :RUWAIS GASCO PETROCHEMICAL
JOB DESCRIPTION AND RESSPONSIBILITIES;
FITTING UP CARBON AND ALLOY PIPE STEEL IN PIPE RACK
FITTING UP UNDERGROUND WATER SUPPLY LINES FOR FIRE HYDRANT
INSTALLING VESSEL,HIGH RISE VERTICAL PIPE LINES,VALVES
INSTALLING SELF MODIFIED STEAM STRESS PLAN
INSTALLING SELF MODIFIED EXISTING PIPE LINES FOR SUNCTION MOTOR PUMP
PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES
POSITION :BOILER MAKER (SAN NICOLAS ARUBA)
INCLUSIVE DATE :JUNE 28, 1998 – SEPTEMBER 03, 1998
COMPANY :STORK WESCAR
PROJECT :COAL FIRED POWER PLANT
JOB DESCRIPTION AND RESPONSIBILITIES;
HOT AND COLD WORK PREPARATION WITH PERMIT
DEMOLISHING OLD EXISTING PIPE LINES BY COLD CUTTING EQUIPMENT AND HOT CUTTING EQUIPMENT
FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES
INSTALLING GAS BURNER,PRIMARY,SECONDARY AND SUPERHEATER PIPES,ECONOMIZER FOR HANGING TYPE BOILER
INSTALLING HIGH RISE VERTICAL PIPE LINES FOR VESSELS
CLEANING GAS CHAMBER,GAS DUMPER,FURNACE
UNBOLTING FLANGE WITH SEQUENCE FOR REPLACING GASKETS, BOLTS AND FITTINGS
PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES
POSITION :PIPEFITTER (SAUDI ARABIA)
INCLUSIVE DATE :JUNE 1994 – NOVEMBER 1995
COMPANY :MCC-SAUDI OGER
PROJECT :ALKHARJ AIRBASE- OFFICE OF MODA
JOB DESCRIPTION AND RESPONSIBILITIES;
FABRICATING AND INSTALLING CARBON AND COOPER PIPE STEEL FOR SUPPLY AND RETURN WATER COOLING SYSTEM FEEDING TO CHILLER,AIR HANDLING UNIT AND CENTRALIZED SPLIT TYPE AIR CONDITIONING
INSTALLING COPPER PIPES AND NOOZLE TUBES FOR 3-WAY FAN COIL UNIT,HOT AND COLD SYSTEM FORHEATER SYSTEM, BATHROOMS,LAVATORY AND KITCHENS
INSTALLING CARBON STEEL PIPE FOR FIRE FIGHTING WATER SYSTEM,FOUNTAINS,DRAINAGE
FITTING UP PVC FOR KITCHEN SINK,BATHROOMS,DOWN SPOUT,DRAINAGE SYSTEM
WELDING PIPES USING GAS WELDING AND SMAW
INSTALLING SUCH MACHINES LIKE: WATER CIRCULATING PUMP, CHILLER, MOTOR PUMPS, AIR HANDLING UNIT, FAN COIL UNIT (SPLIT TYPE)
FABRICATING AIR DUCTS,HEATER TANKS,FRAMES,LADDER TANKS
FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES
SPLICING AND INSTALLING FITTINGS AND EXISTING PIPE LINES ARE SPECIFIED BY ISOMETRIC DRAWING AND GENERAL PLAN
PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM
RESPONSIBLE FOR WELDER’S WELDING ACCURACY
RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES
POSITION :PIPE FITTER (SAUDI ARABIA)
INCLUSIVE DATE :JUNE 08, 1991 – DECEMBER 01, 1993
COMPANY :HADI HAIDER BROS. CO. MANPOWER SUPPLY
PROJECT :QURAYYAH POWER PLANT - TURBINE 1 & 2
:KING KHALID AIRBASE BALLAST NEDAM
:RIYADH,SAFANIYAH AND ABQAIQ PUMP STATION
:RASTANURA REFINERY
:MADINAH WATER DESALIENATION
:JUBAIL PETRO-CHEMICAL
JOB DESCRIPTION AND RESPONSIBILITIES;
SECURING THE WORK PLACE BEFORE AND AFTER ALL OBSTRUCTION AND RISK FACTOR LEADING TO FATAL ACCIDENTS BY DOING HOUSEKEEPING AND LOOK-STOP-INTERVENE PROCEDURES OF SAFETY PRACTICES.
LAY OUT FULL SCALE DRAWINGS, BLUEPRINTS, STRUCTURAL DRAWINGS AND ISOMETRIC PIPE SYSTEMS. GUIDING THE PIPELINES UP NORTH. FITTING-UP STRUCTURAL ACCESSORIES AND ITEMS BOTH ACCORDINGLY SPECIFIED BY THE DRAWING.
( PIPING )
SPLICING PRESSURED PIPE SUCH AS ASTM A106-A53-A312 & 312M TO A358 & 358M, COOPER PIPES/TUBES,WITH SCHEDULE 40 TO 120, 150LBS. TO 350LBS. TO SMALL BORE TO 72ӯ INTO DESIRED ORIENTATION AND IN PROPER ALIGNMENT, FABRICATING, SPLICING, AND CALCULATING DEGREE OFFSETS AND RUNNING OFFSETS LIKE; UNCOMMON DEGREES OF FITTINGS FOR ELBOWS, STEAM STRESS, INSTRUMENTATION, FULL SIZE 30 TO 60 LATERAL, SADDLES, TWISTED FLANGE AND NOZZLES IN DEGREE AT PRESSURE VESSELS. RIGGING AND FITTING UP PIPE SUPPORTS, PRESSURIZED MANUAL TO MOTOR OPERATED VALVES, RANDOM PIPES FOR PIPE RACK AND PIPE LINES (CROSS COUNTRY). PARTLY INVOLVED IN COMMISSIONING, TIE-IN, SHUT DOWN, MAINTAINING PIPE SYSTEMS & HYDRO TESTING. RESPONSIBLE IN PUNCH LISTING, IN PRE-WELD HEATING TREATMENT (PWHT) AND REPAIRING WELDING JOINTS CAUSING FORMS LIKE SLUG, PINHOLE AND IMPENETRATED WELDING.
( STRUCTURAL )
WELDING,FABRICATING AND DEVELOPS LAYOUT PLAN SEQUENCE FOR STRUCTURAL WORK SUCH AS ; STAINLESS AND CARBON, PRESSURE VESSELS, TANKS, PIPE AND STRUCTURAL CONVEYOR, PIPE NOZZLES, LADDER, PLATFORM, PLATE CONE, AIR DUCTS, SQUARE TO ROUND ELBOWS IN PIECES, FRAMEWORKS OR SHELLS FOR MACHINERY,, MANIFOLDS, USING SOME EQUIPMENT AND MACHINES SUCH AS: WELDING MACHINE LIKE (MIG, SMAW, FCAW, TIG) CUTTING TORCH,OXY-ACETYLENE PROFILE CUTTER, MANUAL PLASMA CUTTER, HYDRAULIC AND PNEUMATIC MACHINE SUCH AS (JACK, BENDER, PUNCHER, DRILL, AND ROLLER), GRINDER, CHAIN BLOCKS, OVERHEAD CRANE AND FORKLIFT.
INSTALLING SUCH MACHINES LIKE: WATER CIRCULATING PUMP,DIESEL GENERATORS, CHILLER, MOTOR PUMPS, HEAT EXCHANGER AND STEAM TURBINES
Tools and Equipment Used:
OXY- ACETYLENE PROFILE CUTTER
HDPE high density poly-ethylene EXTRUSION WELDING
MANLIFT
HYDRAULIC PUNCHER, BENDER, DRILLER, ROLLER, SHEARING
FORKLIFT
MASSIVE DOUGS AND WEDGES
DUMPY LEVELING
OVERHEADCRANE
WELDIND MACHINE (tig, smaw, mig, fcaw)
L-SQUARE
COMPASS
CALCULATOR for MATHEMATICS
STRING MARKER
DEGREE FINDER
QUICKY
PLASMA CUTTER
Seminar/ Training / Achievements / Certification Information
BOSIET (Helicopter Capsizing)
Shipboard Welding course (top 3 STUDENT)
General Fitting (Singapore institute)
Pre-Weld Heating Treatment
VETASSESS
Career Related skills
PIPEFITTER
WELDER (FCAW MIG TIG SMAW)
BOILERMAKER
PLASTIC WELDER
Personal Skills Information
Work more than 16 years abroad and have expertise and experienced as Pipe Fitter / Fabricator & Boiler Maker and Plastic welder in construction, building, air base and royal palaces, plastic industries, shipyard, heavy fabrication, rehabilitation of Petro-Chemical Refineries, power plant, desalination, horizontal – vertical construction and platform structure (jacket leg). Ability to work in a safe and responsible manner, effective verbal and listening communication skills and very good decision making skills. Honest, trustworthy, respectful and flexible. Able to deal with the clients in a positive, courteous and respectful manner.
My resume has been supported all information written below by my training and working certificate’s
I’m willing to produce it over once it needed thank you..
SINCERELY YOURS
Dante A. Demegilio