Post Job Free

Resume

Sign in

Power Plant Project

Location:
Western Australia, Australia
Posted:
November 12, 2015

Contact this candidate

Resume:

CURRICULUM

Applicant Name: DANTE A. DEMEGILIO

Position Applied: PIPEFITTER

Address: */** ******** *** **** CANNINGTON 6107

Mobile number: 043*-***-***

AVAILABILITY: CAN WORK AS SOON AS POSSIBLE

Email Add: acsfad@r.postjobfree.com

Birth Date: OCT.30, 1970 Birth Place: MANILA

Height: 5’6” Weight: 68 KGS

Educational Information

Education Yr – To School/Address Course

Tertiary

1988 - 1991

(UNDERGRADUATE)

FEATI UNIVERSITY / WEST NEGROS COLLEGE

Philippines

BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

Vocational

1996 - 1997

(UNDERGRADUATE)

VISAYAN MARITIME ACADEMY

Philippines

BMMC

High School

1983 - 1988

FOUNDATION COLLEGE Philippines

Elementary

1977 - 1983

DON JALANDONI ELEM SCHOOL Philippines

Employment Information;

COMPANY : DOWNER/TECNICAS REUNIDAS

ADDRESS : TAN BURRUP KARRATHA

POSITION : PIPEFITTER

INCLUSIVE DATE : 28 AUGUST 2014 – 14 NOVEMBER 2014

JOB DESCRIPTION AND REAPONSIBILITIES;

PROJECT : AMMONIA REFINARY EXTENSION (COMPRESSOR)

FITTING UP STAINLESS STEEL, CARBON STEEL, CHROMOLY AND LOW TEMP PIPE RANGING TO SMALL BORE TO 60’ DIAMETER

SCHEDULED TO 20, 40, 80, AND 120 HEAVY WALL PIPES.

WORKING AT THE COMPRESSOR RISER AND RESPONSIBLE ON THEIR TRUE NORTHING, EASTING AND ELEVATIONS

RESPONSIBLE FOR THE WELDERS WELDING ACCURACY REGARDING ON GAPS AND BEVELS NEEDED FOR WELDING PROCEDURE

APPLYING TRIGONOMETRIC CALCULATIONS FOR THE DEGREE OFFSETS AND ANGLES SPECIFIED BY THE ENGINEERING DEPT. AND MODIFICATIONS.

JOINTING PIPES FROM MODULE TO MODULE

INSTALLING DIAPHRAGM VALVES, CHECK VALVES, GATE VALVES AND MOTOR OPERATED VALVES

FITTING UP PIPES TO THEIR CORRECT MEASUREMENT, SPOOLS, MATERIALS, FITTINGS AND ORIENTATION BASED ON THE DRAWING GIVEN BY THE SUPERVISOR

RESPONSIBLE FOR THE SAFETY OF MY CO-WORKERS BY DOING PRE-START, HOUSEKEEPING AND SECURING THE HUMPY TO PREVENT ANY HAZARDS.

COMPANY : AUSTAL SHIPS

ADDRESS : HENDERSON MARINA BAY

CONTACT PERSON : (DAVID CRAMER supervisor)

POSITION : PIPEFITTER

INCLUSIVE DATE : 02 AUGUST 2013 – 16 JAN 2014

PROJECT : PATROL BOAT (NAVY DEFENSE)

JOB DESCRIPTION AND REAPONSIBILITIES;

MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING

CALCULATING EACH NORTHING, EASTING AND ELEVATION TO MEET THE DESIRE HEIGHTS OF THE PIPE LINE AND EACH SYTEM

MITTERING AND FABRICATING SPECIAL ELBOWS LIKED 22.5, 15 AND 30 DEGREES ELBOWS

FITTING UP AND INSTALLING FIRE FIGHTING SYSTEM, GREY WATER SYTEM, CRUDE OIL SYSTEM, AND BLACK WATER SYSTEM USING STAINLESS STEEL PIPES AND COPPER PIPES.

RESPONSIBLE FOR WELDERS WELDING ACCURACY

BENDING TUBES 8MM TO 12MM DIAMETER

PARTICIPATING IN HYDRO TESTING AND AIR TESTING UP TO 7 BAR CAPACITY

WELDING STRUCTURAL AND PIPE USING ALUMINUM WIRE AND TIG WELDING

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES

AND READING PIPE DIAGRAM, ISOMETRIC, 3D FOR TAKING OFF MATERIALS AND EACH OF THEIR COMPONENTS TOO AND TO THEIR CORRECT ORIENTATION

COMPANY : OBI RECRUITMENT AGENCY (SUSTAIN-AG)

ADDRESS : NARRABRI NEW SOUTH WALES

CONTACT PERSON :( MISS JOANN)

POSITION : WELDER/ FITTER

INCLUSIVE DATE : 13 MARCH 2013 – 28 APRIL 2013

PROJECT : AGRICULTURAL PRECISION TOOLS AND EQUIPMENT

JOB DESCRIPTION AND REAPONSIBILITIES;

MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING

WELDING FILLET JOINTS, LIFTING LUGS, C TUBES USING MIG AND ARC WELDING MACHINE

INSTALLING AND ASSEMBLING BEARINGS, BLADE WHEELS AND COMPONENTS FOR THE PLANTING SEEDS

ALLIGNING AND FITTING UP HYDRAULIC TUBES AND FITTINGS INCH AND INCH DIAMETER

BENDING AND PRESSING TUBES FOR SEED PLANTING AND COMPRESSING BEARINGS TO THEIR CASING

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES

COMPANY : WESTRALIAN ENGINNERING

ADDRESS : HENDERSON PERTH

CONTACT PERSON : AMIE GA (foreman)

POSITION : PIPE FITTER/ BOILERMAKER

INCLUSIVE DATE : 14 JAN 2013 – 18 FEB 2013

PROJECT : APACHE WATER PIPELINE

JOB DESCRIPTION AND REAPONSIBILITIES;

MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING

CHECKING ALL COMPONENTS WITH THEIR TRUE GIVEN DIMENSION AND MEASUREMENT BEFORE INSTALLING

PIPELINES IN THE SKID WITH THEIR TRUE ORIENTATION

FABRIATING SKID, PIPE RACK, PIPE SUPPORT

MITTERING AND CUTTING PIPE WITH ANGLES GIVEN BY THE DRAWING

FITTING UP ELBOWS AND FLANGES WITH DEGREES SPECIFIED BY THE DRAWING

FITTING UP CARBON STEEL PIPE SIZES 2”DIAMETER TO 12” DIAMETER WITH SHCEDULE 40 TO EXTRA STANDARD

TACKING WITH BULLETS BY TIG WELDING

COMPANY : SPECIALISED WELDING AUSTRALIA

ADDRESS : HAZELMERE ABERNEETHY RD.

CONTACT PERSON : REAL ALDOVINO (shop supervisor)

POSITION : BOILERMAKER

INCLUSIVE DATE : 22 JUNE 2012 – 15 OCTOBER 2012

PROJECT : ALCOA – HEATER PRESSURE VESSEL

JOB DESCRIPTION AND REAPONSIBILITIES;

MARKING AND LAY OUTING DIMENSIONS AND MEASUREMENT SPECIFIED BY THE DRAWING

CHECKING ALL COMPONENTS WITH THEIR TRUE GIVEN DIMENSION AND MEASUREMENT BEFORE INSTALLING

FABICATING AND REPAIRING BUFFLE PLATES, PIPE TUBES, RINGS, AND PIPE NOOZLES

BEVELING ACCORDING TO THEIR DEGREE SPECIFIED FOR WELDING PENETRATION AND ACCURACY

ALLIGNING PIPES TUBES INSERTED THRUOGH AND THROUGH TO EACH OF THE BUFFLE PLATES

JOINTING SIM WELD PIPE ROLLED PLATE, PIPES SIZES 16” TO 1500 MM DIAMETER; SCH 160 TO 16 MM THICKNESS

PROJECT : CIVMEC – WATER FACILITIES

JOB DESCRIPTION AND REAPONSIBILITIES;

CUTTING PIPES AND SPOOLING ACCORDING TO THEIR DIMENSIONS AND THEIR TRUE LENGTH SPECIFIED BY THE DRAWING

FABRICATING COMPADS AND PIPE SUPPORT ACCORDING TO THEIR ELEVATIONS AND DEGREE FALL

INSTALLING PIPE SUPPORT TO THEIR EXACT MEASUREMENT

JOINTING PIPES WITH 3mmTO 4mm GAP AND WITH THEIR TRUE ORIENTATION, DEGREE OFFSET AND ELEVATION,SIZES TO 50mm to 24” DIAMETER; SCH 80 TO 180; CARBON STEEL; STAINLESS STEEL AND ALLOY AND FITTINGS ALL SPECIFIED BY THE DRAWING

CUTTING PIPES WITH DEGREE ANGLE, LATERAL

HOUSEKEEPING

COMPANY : VALE STEEL INDUSTRIES

POSITION : FABRICATOR

INCLUSIVE DATE : AUGUST 03 2010 – MAY 13 2012

PROJECT : CONCRETE MOULDING

JOB DESCRIPTION AND REAPONSIBILITIES;

FABRICATING ALL INNER AND OUTER STRUCTURAL COMPONENTS FOR CHUTES, TANKS, AND MOULDINGS

FABRICATING LIFTING LUGS, EYE PAD, GASSETS PLATE, WEB FLANGES, DOWELLS, STEEL FRAMES

ASSEMBLING, JOINTING, SPLICING ACCORDING TO ITS DRAWING SPECIFICATIONS AND TRUE ORIENTATION

MARKING LAY – OUTS FOR HOLES AT SQUARENESS AND ACCORDING TO ITS DRAWING SPECIFICATIONS

CUTTING PLATES 10MM TO 100MM THICKNESS WITH QIUCKIE SPECIFIED BY THE DRAWING

RESPONSIBLE OF DOING GROOVES, BEVELS FOR WELDERs WELDING ACCURACY

WELDING FILLET JOINTS AND BUTT JOINTS USING FCAW, MIG, SMAW, TIG

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES

POSITION :BOILERMAKER (QUEENSLAND AUSTRALIA)

INCLUSIVE DATE :JANUARY 19, 2009 – MAY 15 2009

COMPANY :GLADSTONE PRESSURE WELDERS

PROJECT :YARWUN RIO TINTO TANKAGE PROJECT

AGITATION TANK CCL DUMP TANK COARSE SEED FILTRATION TANK PURIFIER TANK WINERY TANK

JOB DESCRIPTION AND RESPONSIBILITIES;

FABRICATING AND INSTALLING CARBON & STAINLESS STEEL TANKS, TANK COMPONENTS, CONE AND SPHERE, PIPE NOOZLES, CLADDING, SPHERE BOTTOM PLATE, LADDER, FRAMES, CHUTE, PLATFORMS, PIPINNG AUXILLIARIES, VESSELS.ALL DETAILS AND SECTIONS ARE VERIFIED BY THE FOREMAN FOR TRUE AND CORRECT ORIENTATION.

WELDING FILLET JOINTS ACCORDING TO WELDING SPECIFICATIONS USING TIG,MIG,SMAW

VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY LAY OUT FULL SCALE DRAWINGS

RESPONSIBLE FOR WELDER’S WELDING ACCURACY,

RESPONSIBLE OF DOING ACCURATE BEVELS AND GROOVES

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOPS, INTERVENE PROCEDURE OF SAFETY PRACTICES

POSITION :BOILERMAKER (QUEENSLAND AUSTRALIA)

INCLUSIVE DATE :APRIL 24, 2008 – DECEMBER 09, 2008

COMPANY :TOWNSVILLE ENGINEERING INDUSTRY PTY LTD

PROJECT :MINING EQUIPMENT & FACILITIES

JOB DESCRIPTION AND RESPONSIBILITIES;

VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY LAY OUT FULL SCALE DRAWINGS

FABRICATING AND INSTALLING CARBON & STAINLESS STEEL COMPONENTS,TANKS,FRAMES,TROMMEL.,SQUARE TO ROUND,CONE

CHUTE,VESSELS AND PIPE RACK, PIPE AND STRUCTURAL CONVEYOR.ALL DETAILS AND SECTIONS ARE VERIFIED BY THE FOREMAN FOR TRUE AND CORRECT ORIENTATION

SPILCING AND FITTING UP CARBON & STAINLESS STEEL -STEAM STRESS,TANK, PIPE AUXILIARIES,PIPE NOOZLES,6”DIA TO 12” DIA RANDOM PIPES ACCORDING TO THEIR DRAWING SPECIFICATIONS.

WELDING AND TACKING CARBON STEEL PLATE AND STRUCTURALS USING FCAW,MIG,SMAW AND TIG

REPAIRING AND ACTUAL FIXING MINING EQUIPMENTS,GAS TANK,HEAVY EARTH MOVING EQUIPMENT WASHING OUT WELD BEADS BY GOUGING AND CUTTING TORCH

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

RESPONSIBLE OF DOING ACCURATE BEVELS AND GROOVES

RESPONSIBLE FOR MAINTAINING USING THE HIGH PROFILE CUTTER(OXY-ACETYLENE)

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING

POSITION :PIPE/STRUCTURAL FITTER (LOUISIANA, U.S.A)

INCLUSIVE DATE :DECEMBER 09, 2006 – OCTOBER 30, 2007

COMPANY :GIS ENGINEERING SERVICES, A DIVISION OF GRANDISLE SHIPYARD

PROJECT :RELIANCE & BG TOBAGO JACKET LEG OFFSHORE PLATFORM

(MCDERMOTT FABRICATION)

JOB DESCRIPTION AND RESPONSIBILITIES;

FITTING UP FULL SIZE X & Y LATERAL PIPE BRACES SCHEDULE-120,48 INCHES DIAMETER,82 FEET LONG

FITTING UP RANDOM RUBBER COATED ALLOY STEEL PIPE 16 INCHES DIAMETER,PIPE LEG,WATER SUNCTION PIPE,

PIPE SUPPORT,SPRINKLER,ANODES

FABRICATING PRESSURE VESSEL AND ITS INNER STRUCTURED COMPONENTS AND PIPINS SYSTEM

FABRICATING AND WELDING, INSTALLING HELIPADS, STRUCTURAL AIR DUCTS,SKIDS,CHUTES,OFFSHORE PLATFORM DECK, OFFSHORE OIL RIG PLATFORM, H-BEAM,I-BEAM TANKS, TANKS COMPONENTSAND ITS PIPINS AUXILLIARIES, SQUARE TO ROUND STRUCTURED AIR DUCT,AND CONE ALL SPECIFIED BY THE DRAWING

SHIP REPAIR (BARGE) AND PREPARATIONS BEFORE LOADING FULL SIZE JACKET LEG OFFSHORE PLATFORM,DECK

PARTLY INVOLVED IN HYDRO TESTING

RESPONSIBLE OF DOING ACCURATE BEVELS AND GROOVES

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES………

POSITION : PIPE FITTER (TAIWAN)

INCLUSIVE DATE : JUNE 07, 2005 – MAY 15, 2006

COMPANY : SAMSUNG ENGINEERING IND. (FORMOSA PLASTIC IND . AND REFINERY)

PROJECT : SHUTDOWN R4 &R5 AND R6 REHABILITATION

JOB DESCRIPTION AND RESPONSIBILITIES;

FITTING UP 6 INCHES CARBON STEEL TO 54 INCHES DIAMETER AND 8 INCH DIAMETER STAINLESS STEEL RANDOM PIPES AND THEIR FITTINGS ELEVATED TO 10M TO 15 METERS FOR THREE DIFFERENT HIGH RISE PIPE RACK

FITTING UP 10 INCHES TO 12 INCHES DIAMETER PIPE LOOPING HORIZONTALLY AND VERTICALLY

FITTING UP 24 INCH DIAMETER HEAVY WALL (J-GROOVE BEVEL) RANDOMLY AT HIGH RISE PIPERACK

FITTING UP ALL TYPES OF VALVES MANUALLY TO MOTOR OPERATED VALVES

FITTING UP AUXILIARY PIPES AND STEAM STRESS PIPES

FITTING UP PIPE BRANCHES TO LIVE OPERATED PIPE HEADER(TIE-IN) WITH HOT-COLD WORK PERMIT AND HOT WORK PREPARATION

WELDING STRUCTURAL FOR PIPE SUPPORT AND COMPONENTS

REPAIRING WELDING JOINTS CAUSING FORMS LIKE SLUG, PINHOLE AND IMPENETRATED WELDING.

DEMOLISHING OLD EXISTING PIPE LINES BY COLD CUTTING EQUIPMENT AND HOT CUTTING EQUIPMENT

FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES

SPLICING AND INSTALLING FITTINGS AND EXISTING PIPE LINES ARE ALL SPECIFIED BY ISOMETRIC DRAWING GENERAL PLAN AND P&ID

SELF-OWNED RIGGING TECHNIQUE AND SCAFFOLDING

VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION FOR DEGREE OFFSET,FITTINGS TAKE OFF,LATERALS AND SADDLES

PARTLY INVOLVED IN HYDRO TESTING,OIL FLUSHING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

ASSIGNED IN PWHT

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE

POSITION :PIPEFITTER/POLY WELDER (MENA ABDULLAH KUWAIT)

INCLUSIVE DATE :AUGUST 01, 2002 – DECEMBER 31, 2004

COMPANY :NATIONAL INDUSTRIES COMPANY

PROJECT :HDPE TANKS AND PIPE MANUFACTURER

JOB DESCRIPTION AND RESPONSIBILITIES;

1) REPAIRING UNDERCUT LINING

2) WELDING PLASTIC USING EXTRUSION GUNNER

*PIPE SOCKET WELD JOINTS

*BUTT JOINTS BEVELED 50MM DEEP

*FILLET AND OVERLAPPED JOINTS

*TANKS USED FOR UNDERGROUND,MANHOLE,ELECTRICAL PUMP ROOM

*PATCHING

3)EXPERIENCED IN FABRICATION

* SADDLES

*TEE BRANCH,Y BRANCH,

*ELBOWS IN PIECES (MITER)

*TANKS

*ECCENTRIC AND CONCENTRIC CONES

*TANK NOOZLES

* 30,45,TO 60 DEGREES LATERALS

VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION,MARKING,LAY OUT FULL SCALE DRAWING

4)SPLICING PLASTIC PIPES 60CM TO 2METERS DIAMETER USING SOME EQUIPMENT

*INTERNAL RING EXPANDER

*PRESSURE RING THIGHTENER

*U-COILED BRASS HEATING POLARITY

*WELDING APPARATUS kr 500-KWS

WELDING PROCESS --THE PARAMETERS WILL BE APPLIED SPECIFIED TO THEIR DIAMETER,VOLTAGE AND TIME LIMIT RIGHT AFTER THE PRESSURE RING THIGHTENED

ONTO THE SOCKET WELD JOINT AND CONNECT THE HEATING ADAPTER AND BEGIN THE PROCESS. –

PARTLY INVOLVED IN HYDRO TESTING AND WEIGHT TESTING (BACK FILLING DURABILITY)

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES……

POSITION :PIPEFITTER (SINGAPORE)

INCLUSIVE DATE :JUNE 20, 2001 – FEBRUARY 04, 2002

COMPANY : PLANT ENGINEERING CONSTRUCTION PRIVATE LTD.

PROJECT :PFIZER ASIA REFINERY & MOBILE EXXON SERRAYA POWER PLANT

JOB DESCRIPTION AND RESPONSIBILITIES;

(PFIZER ASIA REFINERY)

RESPONSIBLE OF MARKING AND DRILLING CONCRETE HOLES SPECIFIED FROM THE NORTHERLY

EASTERLY AND ELEVATION OF THE DRAWING

FITTING UP VERTICAL 16 INCHES STAINLESS STEEL PIPE SUPPLY LINES

FITTING UP ALLOY,CARBON,STAINLESS RANDOM PIPE STEEL FROM PIPE RACK DOWN TO MOTOR PUMP ROOM

FABRICATING AND WELDING, INSTALLING PIPE SUPPORT,INSTALLING VALVES

FABRICATING AND FITTING UP FIRE FIGHTING EXISTING LINE

SPLICING AND INSTALLING FITTINGS AND EXISTING PIPE LINES ARE SPECIFIED BY ISOMETRIC DRAWING AND GENERAL PLAN

VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION,MARKING,LAY OUT FULL SCALE DRAWING

SELF-OWNED RIGGING TECHNIQUE AND SCAFFOLDING

VERIFIES CONFORMANCE OF WORK PIECE TO SPECIFICATIONS BY APPLYING CALCULATION OF TRIGONOMETRIC FUNCTION FOR DEGREE OFFSET,FITTINGS TAKE OFF,LATERALS AND SADDLES

PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES

( SHUT DOWN EXXON SERRAYA POWER PLANT )

HOT AND COLD WORK PREPARATION WITH PERMIT PROCEEDING AFTER HAVING A HOT AND COLD PERMIT

INSTALLING TIE – IN WORK OF OBSOLETE PIPE ANGLES AND FITTINGS BRANCHING TO PIPE HEADER

DEMOLISHING OLD EXISTING PIPE LINES BY COLD CUTTING EQUIPMENT AND HOT CUTTING EQUIPMENT

FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES

UNBOLTING FLANGE WITH SEQUENCE FOR REPLACING GASKETS, BOLTS AND FITTINGS………

POSITION :PIPEFITTER (ABU DHABI, UAE)

INCLUSIVE DATE :JANUARY 13, 2001 – APRIL 30, 2001

COMPANY :DESCON ENGINEERING

PROJECT :RUWAIS GASCO PETROCHEMICAL

JOB DESCRIPTION AND RESSPONSIBILITIES;

FITTING UP CARBON AND ALLOY PIPE STEEL IN PIPE RACK

FITTING UP UNDERGROUND WATER SUPPLY LINES FOR FIRE HYDRANT

INSTALLING VESSEL,HIGH RISE VERTICAL PIPE LINES,VALVES

INSTALLING SELF MODIFIED STEAM STRESS PLAN

INSTALLING SELF MODIFIED EXISTING PIPE LINES FOR SUNCTION MOTOR PUMP

PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES

POSITION :BOILER MAKER (SAN NICOLAS ARUBA)

INCLUSIVE DATE :JUNE 28, 1998 – SEPTEMBER 03, 1998

COMPANY :STORK WESCAR

PROJECT :COAL FIRED POWER PLANT

JOB DESCRIPTION AND RESPONSIBILITIES;

HOT AND COLD WORK PREPARATION WITH PERMIT

DEMOLISHING OLD EXISTING PIPE LINES BY COLD CUTTING EQUIPMENT AND HOT CUTTING EQUIPMENT

FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES

INSTALLING GAS BURNER,PRIMARY,SECONDARY AND SUPERHEATER PIPES,ECONOMIZER FOR HANGING TYPE BOILER

INSTALLING HIGH RISE VERTICAL PIPE LINES FOR VESSELS

CLEANING GAS CHAMBER,GAS DUMPER,FURNACE

UNBOLTING FLANGE WITH SEQUENCE FOR REPLACING GASKETS, BOLTS AND FITTINGS

PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES

POSITION :PIPEFITTER (SAUDI ARABIA)

INCLUSIVE DATE :JUNE 1994 – NOVEMBER 1995

COMPANY :MCC-SAUDI OGER

PROJECT :ALKHARJ AIRBASE- OFFICE OF MODA

JOB DESCRIPTION AND RESPONSIBILITIES;

FABRICATING AND INSTALLING CARBON AND COOPER PIPE STEEL FOR SUPPLY AND RETURN WATER COOLING SYSTEM FEEDING TO CHILLER,AIR HANDLING UNIT AND CENTRALIZED SPLIT TYPE AIR CONDITIONING

INSTALLING COPPER PIPES AND NOOZLE TUBES FOR 3-WAY FAN COIL UNIT,HOT AND COLD SYSTEM FORHEATER SYSTEM, BATHROOMS,LAVATORY AND KITCHENS

INSTALLING CARBON STEEL PIPE FOR FIRE FIGHTING WATER SYSTEM,FOUNTAINS,DRAINAGE

FITTING UP PVC FOR KITCHEN SINK,BATHROOMS,DOWN SPOUT,DRAINAGE SYSTEM

WELDING PIPES USING GAS WELDING AND SMAW

INSTALLING SUCH MACHINES LIKE: WATER CIRCULATING PUMP, CHILLER, MOTOR PUMPS, AIR HANDLING UNIT, FAN COIL UNIT (SPLIT TYPE)

FABRICATING AIR DUCTS,HEATER TANKS,FRAMES,LADDER TANKS

FABRICATING AND INSTALLING NEW MODIFIED EXISTING PIPELINES,SUPPORTS,FITTINGS AND VALVES

SPLICING AND INSTALLING FITTINGS AND EXISTING PIPE LINES ARE SPECIFIED BY ISOMETRIC DRAWING AND GENERAL PLAN

PARTLY INVOLVED IN HYDRO TESTING,COMMISSIONING AND MAINTENING OF PIPE SYSTEM

RESPONSIBLE FOR WELDER’S WELDING ACCURACY

RESPONSIBLE FOR EVERYBODY’S SAFETY BY DOING HOUSEKEEPING AND LOOK, STOP, INTERVENE PROCEDURE OF SAFETY PRACTICES

POSITION :PIPE FITTER (SAUDI ARABIA)

INCLUSIVE DATE :JUNE 08, 1991 – DECEMBER 01, 1993

COMPANY :HADI HAIDER BROS. CO. MANPOWER SUPPLY

PROJECT :QURAYYAH POWER PLANT - TURBINE 1 & 2

:KING KHALID AIRBASE BALLAST NEDAM

:RIYADH,SAFANIYAH AND ABQAIQ PUMP STATION

:RASTANURA REFINERY

:MADINAH WATER DESALIENATION

:JUBAIL PETRO-CHEMICAL

JOB DESCRIPTION AND RESPONSIBILITIES;

SECURING THE WORK PLACE BEFORE AND AFTER ALL OBSTRUCTION AND RISK FACTOR LEADING TO FATAL ACCIDENTS BY DOING HOUSEKEEPING AND LOOK-STOP-INTERVENE PROCEDURES OF SAFETY PRACTICES.

LAY OUT FULL SCALE DRAWINGS, BLUEPRINTS, STRUCTURAL DRAWINGS AND ISOMETRIC PIPE SYSTEMS. GUIDING THE PIPELINES UP NORTH. FITTING-UP STRUCTURAL ACCESSORIES AND ITEMS BOTH ACCORDINGLY SPECIFIED BY THE DRAWING.

( PIPING )

SPLICING PRESSURED PIPE SUCH AS ASTM A106-A53-A312 & 312M TO A358 & 358M, COOPER PIPES/TUBES,WITH SCHEDULE 40 TO 120, 150LBS. TO 350LBS. TO SMALL BORE TO 72ӯ INTO DESIRED ORIENTATION AND IN PROPER ALIGNMENT, FABRICATING, SPLICING, AND CALCULATING DEGREE OFFSETS AND RUNNING OFFSETS LIKE; UNCOMMON DEGREES OF FITTINGS FOR ELBOWS, STEAM STRESS, INSTRUMENTATION, FULL SIZE 30 TO 60 LATERAL, SADDLES, TWISTED FLANGE AND NOZZLES IN DEGREE AT PRESSURE VESSELS. RIGGING AND FITTING UP PIPE SUPPORTS, PRESSURIZED MANUAL TO MOTOR OPERATED VALVES, RANDOM PIPES FOR PIPE RACK AND PIPE LINES (CROSS COUNTRY). PARTLY INVOLVED IN COMMISSIONING, TIE-IN, SHUT DOWN, MAINTAINING PIPE SYSTEMS & HYDRO TESTING. RESPONSIBLE IN PUNCH LISTING, IN PRE-WELD HEATING TREATMENT (PWHT) AND REPAIRING WELDING JOINTS CAUSING FORMS LIKE SLUG, PINHOLE AND IMPENETRATED WELDING.

( STRUCTURAL )

WELDING,FABRICATING AND DEVELOPS LAYOUT PLAN SEQUENCE FOR STRUCTURAL WORK SUCH AS ; STAINLESS AND CARBON, PRESSURE VESSELS, TANKS, PIPE AND STRUCTURAL CONVEYOR, PIPE NOZZLES, LADDER, PLATFORM, PLATE CONE, AIR DUCTS, SQUARE TO ROUND ELBOWS IN PIECES, FRAMEWORKS OR SHELLS FOR MACHINERY,, MANIFOLDS, USING SOME EQUIPMENT AND MACHINES SUCH AS: WELDING MACHINE LIKE (MIG, SMAW, FCAW, TIG) CUTTING TORCH,OXY-ACETYLENE PROFILE CUTTER, MANUAL PLASMA CUTTER, HYDRAULIC AND PNEUMATIC MACHINE SUCH AS (JACK, BENDER, PUNCHER, DRILL, AND ROLLER), GRINDER, CHAIN BLOCKS, OVERHEAD CRANE AND FORKLIFT.

INSTALLING SUCH MACHINES LIKE: WATER CIRCULATING PUMP,DIESEL GENERATORS, CHILLER, MOTOR PUMPS, HEAT EXCHANGER AND STEAM TURBINES

Tools and Equipment Used:

OXY- ACETYLENE PROFILE CUTTER

HDPE high density poly-ethylene EXTRUSION WELDING

MANLIFT

HYDRAULIC PUNCHER, BENDER, DRILLER, ROLLER, SHEARING

FORKLIFT

MASSIVE DOUGS AND WEDGES

DUMPY LEVELING

OVERHEADCRANE

WELDIND MACHINE (tig, smaw, mig, fcaw)

L-SQUARE

COMPASS

CALCULATOR for MATHEMATICS

STRING MARKER

DEGREE FINDER

QUICKY

PLASMA CUTTER

Seminar/ Training / Achievements / Certification Information

BOSIET (Helicopter Capsizing)

Shipboard Welding course (top 3 STUDENT)

General Fitting (Singapore institute)

Pre-Weld Heating Treatment

VETASSESS

Career Related skills

PIPEFITTER

WELDER (FCAW MIG TIG SMAW)

BOILERMAKER

PLASTIC WELDER

Personal Skills Information

Work more than 16 years abroad and have expertise and experienced as Pipe Fitter / Fabricator & Boiler Maker and Plastic welder in construction, building, air base and royal palaces, plastic industries, shipyard, heavy fabrication, rehabilitation of Petro-Chemical Refineries, power plant, desalination, horizontal – vertical construction and platform structure (jacket leg). Ability to work in a safe and responsible manner, effective verbal and listening communication skills and very good decision making skills. Honest, trustworthy, respectful and flexible. Able to deal with the clients in a positive, courteous and respectful manner.

My resume has been supported all information written below by my training and working certificate’s

I’m willing to produce it over once it needed thank you..

SINCERELY YOURS

Dante A. Demegilio



Contact this candidate