Resume:

ROLANDO PASCO VALENZUELA

Alinsod Compound, Brgy. Tagapo, City of Santa

Rosa, Laguna, Philippines 4026

Home-(063-**-***-****, Cell phone-(063)922-***-****

**********************@*****.***

Passport no. EC1834079

Educational Attainment:

Technical / Vocational: Lyceum of the Philippines

Intramuros, Manila

Course : Industrial Electronics Technician

Date Graduated : October 1977

College : Perpetual Help College of Laguna

Binan, Laguna

Course : Bachelor of Science in Electrical

Engineering

(College Level)

Period : 1980 - 1981

Work Experience :

I. Inclusive Dates : Jan. 1998 to present

Company : LCM Petro Oil Services Libya

Client : AKAKUS OIL OPERATION

(Repsol Oil Operation- formerly)

Job site : Ubari, El sharara field, Libya

Position : Senior Instrument Specialist

JOB DESCRIPTION AND RESPONSIBILITIES:

Responsible in carrying out Instrumentation works in all Oil/Gas

Separation Plant (GOSP) Early Production Facilities (EPF), Gas compression

Facilities, Water Injection plant, Turbine Fuel facilities and in all Oil

wells, Water source and Injection Wells. Including Accommodation facilities

within NC-115 and NC-186 Elsharara Field.

Responsible in securing work permits with safety requirements, house

keeping and closing completed work orders.

Performed as task supervisor to coordinate with Operators and

production supervisors in carrying out work orders such as preventive,

corrective, service and modification..

Responsive to all emergencies and urgent calls at anytime. Taking all

immediate and necessary action in resolving and repairing any problem

concerning process Instrumentation failures or plant shutdown and putting

back the plant in to operation. Carrying out periodical Preventive

maintenance by checking all Process control, monitoring, analyzer and

various measuring instruments for, density, pressure, temperature, level,

flow at maximum working performance with in the Plant and outside the

Field's.

Responsible in Instrument trouble shooting and repair, calibration and

settings of various electronics and pneumatic transducers, controllers,

MOV's, valves, actuators, relays, switches,fire and gas devices;

Responsible in restoration and upgrading of instrument system;

Checking PLC and PCS/DCS input output signals; Replacement, reinstallation

of Electronics and pneumatic instrument devices and equipments; Assisting

OHTL / REDA pump section in setting up protection for pumps on oil and

water source wells;

Responsible in material preparation for Installation, modification and

safety upgrading of Chemical injection system;.

Responsible in Maintaining Water treatment plant controls and

monitoring system including Sewage and Irrigation plant system at Central

Complex facilities and in all Accommodations facilities;, Involved in pre-

commissioning and acceptance test in various projects.

Knowledgeable in P&ID, Instrument Loop drawings and integrated

Electrical /Instrument logic control system,PLC,DCS,PCS, Computer and

Maximo system literate. Duty to report to Instrument section head;

Instrument section Head reliever; Supervises and provides training to

Libyan trainees;

II. Inclusive Dates : January 1997 to December 1997

Company : DAEWOO CORPORATION

Site AI-9

Tripoli, Libya

Project : Tripoli Medical Center

Tripoli, Libya

Position : Electrical Technician /

Instrument Foreman

JOB DESCRIPTION AND RESPONSIBILITIES:

Responsible in operation and maintenance of the hospital, under

electrical/ instrumentation supervision.

Performed routine works such as substation switchgear monitoring and

recording, from medium voltage to low voltage power distribution. On call

duties for work order in the hospital facilities.

Work also includes preventive maintenance of various electrical

equipment's. Trouble shooting and repair of power and lighting, motor

control panels and switchboard and fixtures.

Assigned in Installation of electrical motor control on industrial and

commercial projects.

Knowledgable in building automation system, knowledgeable in reading

logic control drawing, modification, design and testing.

Assigned as instructor in electrical power distribution system for

Libyan Trainees.

III. Inclusive Dates : December 1994 to December 1995

Company : JAMJOOM WESCON S.A. COMPANY, LTD

Jeddah, K.S.A.

Project : Saudi Aramco Mobil Refinery

(S A M R E F)

Yanbu, K.S.A.

Position : Senior Instrument Technician

JOB DESCRIPTION AND RESPONSIBILITIES:

Worked with E &I department in three major projects namely The Acid

Evacuation System, Flare and Knockout Drum Turnaround and the Iomerization

improvement Project.

Responsible in preparation of all electronics and pneumatic

instruments required for the project by checking, and calibrating all

various process Instruments such as pneumatic and electronic transducers,

controllers, converters, Valves, MOV's, PSV's, Switches, relays, analyzer,

detectors and gauges/indicators devices use for level, pressure, flow and

temperature,

Responsible in function testing of Instrument control loops, relay

logic panels, pneumatic control panels, ESD panels, H2S detection system,

PLC and DCS input / output signals, Instrument and Electrical Interface

system. Including cable insulation and continuity testing, valve seat,

airline and impulse signal testing.

Responsible in Instrument installation, tubing hook up, cable pulling

and glanding to wire termination, tagging and safety upgrading.

Responsible to record all Instrument data sheets, as built drawing,

pre-commissioning check sheet and punch list, discrepancies, drawing update

and documentation. Knowledgeable in basic PLC and DCS, able to read and use

P&ID's, ESD matrix and loop diagrams.

Responsible in work shop supervision Knowledgeable in Environment and

health safety regulation.

IV. Inclusive Dates : February 1992 to September 1992

Company : ADININ works and Engineering, Kuala

Belait,

Negara Brunei Darussalam

Project : Brunei Liquefied Natural Gas (BLNG)

: Panaga Hospital Project

Position : Electrical/ Instrument Technician

JOB DESCRIPTION AND RESPONSIBILITIES:

Assigned in BLNG as instrument technician under Electrical and

Instrument department, Responsible in calibration and servicing of

instruments and field installation.

Assigned to Supervised and managed electrical and instrument

construction and installation of Panaga hospital project;

Responsible in project coordination, material procurement, time

keeping, work delegation and scheduling, supervision and technical

assistance. Worked covered Electrical and instrument cable and piping

layout, glanding and wire terminations; installation of power distribution

panel and main control board for motors and lightings, electrical equipment

and fittings; fire alarm system and HVAC interface system;

Responsible in drawing update and review, modification and as built

drawing, Acceptance Test and commissioning .

V. Inclusive Dates : July 1988 to August 1991

Company : Sulaiman Development Services,

Client : Brunei Shell Petrolium Co.Sdn.Bhd

Kuala Belait,Negara Brunei, Darussalam

Position : Instrument Technician

JOB DESCRIPTION AND RESPONSIBILITIES:

Worked as Instrument Technician under Electrical and Instrument (E&I)

Section Engineering construction and Operation Offshore and onshore

project;

Responsible in material preparation and fabrication of instrument

supports and brackets for cables tray and ladder, tubing layout, terminal

boxes, panels, modules, stand poles and all required material needed for a

particular projects.

Responsible in installation of Electronics, Hydraulic and pneumatic

instruments and equipments such as transmitters, controllers, recorders,

analyzers, thermocouples, relay and booster, regulators, valves, switches,

pilots, indicator and gauges; Production surveillance monitoring (PSM),

Computer Assisted Operation (CAO) sub-board, shutdown ESD and startup

system and Auto control module, control relays shutdown and relief valves;

Fire and Gas detection system in all Oil and Gas well head Separators,

contactor, compression system, gas lift to gather station, heat exchanger,

boiler glycol regeneration and to all remote and platform facilities.

Responsible in Electrical and instrument interface installation form

field to marshaling cabinets to control center.

Responsible in calibration and testing of all electronics and

pneumatic Instruments.

Responsible in securing work environmental safety, as built drawing

and documentation and commissioning.

VI. Inclusive Dates : January 1986 to June 1988

Company : Jardine Offshore Technical Services

Client : Brunei Shell Petroleum Co. Sdn. Bhd

Position : Instrument Technician / Foreman

JOB DESCRIPTION AND RESPONSIBILITIES:

Worked as Instrument Technician/Foreman under Electrical and

Instrument (E&I) Section Engineering construction and Operation Offshore

and onshore project.

Responsible in construction, installation and commissioning of

Pneumatic, Electrical, Electronics and Hydraulics Instrumentation Systems

for oil and gas well head hook ups, inhibitor skids, water injection

system, gas lift, launcher, gas compression system, auto control, satellite

well terminal module system, shutdown system (E.S.D.), fire and gas system,

separator, contractor, steel column and vessels, boiler regeneration, heat

exchanger and to all remote and Platform facilities.

Performed site survey, review and as built drawing, work and material

planning and preparations, Instrument support Fabrication, instrument logic

control panel assembly, work shop testing and calibration.

Assigned as foreman with multi national instrumentation team,

responsible in work delegation and secure work environmental safety,

material preparation, planning, and coordinator, time sheet preparation and

reporting to immediate supervisor.

Responsible in securing work environmental safety, as built drawing

and documentation and commissioning.

VII. Inclusive Dates : February 1984 to November 1984

Company : Dallah Avco Trans Arabia Ltd.

Client : Arabian Bechtel Company Ltd

Project : PF - 24 King Khalid Intl. Airport Riyadh, K.S.A.

Position : Test and Start-up Foreman/Electrician

JOB DESCRIPTION AND RESPONSIBILITIES:

Responsible in Fire alarm system, HVAC and security system

construction, installation and commissioning, material and site

coordinator, work preparation and delegation, supervision and reporting.

Responsible in Insrument hookup completion, verification test, check

device location and identification, review panel, module, check contract

relays for interfere and wire computer number, troubleshoot and repair,

Responsible to prepare all instrument needed for testing, review all

drawings and design, review system interface and cause and effect, conduct

final test of all loop wiring and devices, demonstrate function and

acceptance test, As built drawing and documentation.

Worked with multinational instrumentation team, responsible in work

delegation and secure work environmental safety, material preparation,

planning, and coordination, time sheet preparation and reporting to

immediate supervisor.

VIII. Inclusive date : November 1981 to January 1984

Company : Saudi Electro Mechanical Company

Client : Arabian Bechtel Company Ltd.

Project : PF - 24 King Khaled Intl. Airport Riyadh,

K.S.A

Position : Test and Start-up Foreman/Electrician

JOB DESCRIPTION AND RESPONSIBILITIES:

Worked in Construction and Installation of Fire and Life safety, Security &

HVAC system. Carried out installation of various Fire and Gas detection

system, security control and monitoring system.

Responsible in system verification and commissioning of relay interface,

data digital system and electrical interface system.

Responsible in supervision and worked delegation, time keeping and

reporting.

Courses, Training and Seminar Attended:

1. Name : Meralco Foundation Institute

Place : Pasig City, Philippines

Course : Instrumentation - Electro Pneumatic

Date : 2011

2. Name : DuPont Safety Resources

Place : Libya

Course : Safety Training Observation Programme for

Supervisors Seminar

Date : 2009

3. Name : Exploration Logistics

Place : Libya

Course : Desert driving course

Date : 2008 - 2006 - 2005

4. Name : LCM Oil Field Services

Place : Libya

Course : Basic HSE and Fire Awareness Course

Date : 2005

5. Name : Repsol Oil Operation

Place : Libya

Course : ISO - 14001 environmental Seminar

6. Name : Repsol Oil Operation

Place : Libya

Course : Basic Safety and Fire Fighting course

7. Name : Repsol Oil Operation

Place : Libya

Course : Maximo 3 system Implementation

8. Name : Eshrak Computer & Information Center

Place : Libya

Course : Microsoft word 97, Window 95 and DOS

Date : 1999

9. Name : Festo Didetic

Place : Philippines

Course : Introduction to Programmable

Logic Controller (PLC)

Date : 1992

10. Name : Brunei Liquefied Natural Gas (BLNG)

Place : Brunei

Course : Electrical and Safety seminar

Date : 1992

11. Name : Megas training Co.

Place : Brunei

Course : Offshore Survival, Safety, Fire

Fighting and First

Aid

Date : 1991

12. Name : Swagelok co.

Place : Brunei

Course : Valve and Fittings, Safety Seminar

Date : 1987 and 1988

Rolando P. Valenzuela Date: October 13, 2015