Junda Qiu
Phone: 201-***-**** Email: ************@*****.***
Available to work immediately
OBECTIVE: Looking for a full-time job in the position of Structural Engineer.
SUMMARY: 2 years’ experience in Structural Design of reinforced concrete structures for high-rise residential
building using AutoCAD.
2 years strong Structural Analysis software experience. Input data such as structural loads, the structure's geometric representation and support conditions, and the materials' properties. Output quantities include support reactions, stresses, displacements and reinforcement plan.
4 years solid experience in Structural Mechanics, such as computation of deformations, deflections, and internal forces or stresses within structures.
Excellent knowledge of Advanced Structural Mechanics concepts like the Finite Element Method, effects of stability and non-linear behaviors.
Fundamental working experience as project engineer, well trained verbal & writing skills and people skills.
Passed Fundamentals of Engineering (FE) exam, E.I.T. and pursue P.E. License very soon.
Highly-self-motivated, strong engineering background and ability to take challenges.
EDUCATION: Stevens Institute of Technology, Hoboken, NJ
Master of Engineering, Structural Engineering, May 2015 GPA: 3.75
Core Courses: Adv. Structure Analysis, Adv. Reinforced Concrete Structure, Adv. Steel Structure,
Geotechnical Design, Adv. Mechanics of Material, Finite Element Analysis, Bridge Design,
Construction Management, Eng. Economics & Cost Analysis
Fuzhou University, Fuzhou, Fujian, China
Bachelor of Engineering, Civil Engineering, July 2013 GPA: 3.00
Activities & Rewards: 2014 the Second Class Scholarship, 2012 Second Prize in Structural
Design Competition, 2012-2013 College Chorus’s Leader
CERTIFICATE: E.I.T. and pursue P.E. License very soon.
SKILLS: Language: English, Mandarin/Chinese
Computer Software: AutoCAD, Revit, Prolog Manger, Mathcad, Abaqus, MATLAB2009, MS Office Outlook, Excel, Word, Adobe Acrobat, Adobe Photoshop.
Instrument: Instron 1342 MTS Hydraulic Servo Testing System, SHT4106 Testing System, Theodolites, Electronic Distance Measurement (EDM), Data collectors. GPS Total station Automatic and self-leveling laser levels
PROJECTS: Stevens Institute of Technology, Hoboken, New Jersey
Rehabilitation and Design for Widening an Existing Highway Bridge 02/15 - 05/15
Design a new deck, girders, piers and abutment complied with AASHTO, FHWA and NYSDOT code.
Develop construction sequencing for the entire project, work zones and economical required lane widths
Complete the new deck, stringers design and modification to existing stringers and other details (LRFD).
Accomplish the substructure design with reinforced concrete abutment and approach slab. Used estimate table to draw a cost estimate from pre-construction to post-construction.
My project proposal won the bid with 6 months length and lower estimate cost of $3.2 million among bids in course.
Fuzhou University, Fuzhou, Fujian, China
The Hysteretic Performance Test and Numerical Simulation of T Connection with Backing Plates, Fujian Undergraduate Innovative Experiment Program
Research Assistant and team leader, College of Civil Engineering 05/11 - 06/12
T Connection was made of High-quality Carbon Structural Steel which contains 0.05% 0.70% carbon. and It is equipped between column and girder to absorb earthquake energy. We specialized the shape, material, and fabrication method of T Connection seeking for a better hysteretic Behavior.
Designed the steel components and connections for anti-seismic performance test by using AutoCAD, MATLAB, and Abaqus analysis software.
Fabricated testing models and run loading test and material property test through Instron 1342 Electro-Hydraulic Servo Testing System and SHT4106 Testing System respectively.
Compiled the result and reported to the instructor for closing of the project.
EXPERIENCE: DMR Construction Service, Inc., 160 Hopper Avenue, Waldwick, NJ
Communications Room at Verrazano Narrows Bridge Service Building, Staten Island
Project Engineer (Temporary) 08/15 - 09/15
Processed, tracked, and distributed submittals and RFIs. Took meeting minutes. Managed document control process, including change orders, purchase order and contract administration.
Produced significant cost savings, potential cost avoidance, and preventive problem solving through numerous cost saving ideas, suggestions, and recommendations.
Ensured equipment and materials were in accordance with contract drawings and specifications by monitoring and coordinating construction activities.
Negotiated and tracked subcontractor contracts, agreements, change orders, and insurance. Dealt with suppliers/vendors, and consultants to secure company’s benefit.
Vanasse Hangen Brustlin Inc., 1 Gateway Center #15, Newark, NJ
Port Authority of NY & NJ Transportation Planning
Field Technician (Contract) 10/14 - 05/15
Completed Traffic Time and Delay Study, Traffic Volume Study. Handed out and collected survey via mail which is required by Trip Generation data. Used tablets to record observations of state of plate & number of passengers of vehicle passing through certain station.
Accomplished traffic data collection to create Trip Generation and using Logit Models to build Trip Distribution Models.
Fujian Hengyu Real Estate Development Company, Fuzhou, Fujian, China
Hengyu International Garden First phase of residential project. (Design and Build)
Structural/Project Engineer 06/11 - 08/13
Executed oversight of the $660 million residential building project, an 186,000 square foot high-rise apartment with 2 basement level.
Completed design of reinforced concrete stairwells #4 residential building by AutoCAD, and used structural analysis software to determine dimension of the components and construction material. Communicated with architects and owner to check utilities and function details continuously.
Worked with inspectors and resident engineer to track all the construction material regarding contract documents, and secured approvals of them. Verified scheduling the construction logs and made odds and ends work in parallel, take coordinated steps in Rebar Cutting & Bending Work and Distribution.
The project period was shortened by 6 months out of 28 months, on account of the rework rate greatly reduced by 40% compared with previous project. Significantly economized at least 8% maintain and administrative cost of project.