NAVALTA, PAUL ROBERT M.
Unit *D **** Consuelo Street, Malate Manila,1004 Philippines
Mobile No.+639*********
Email: ******************@*****.***
PERSONAL DATA
Date of Birth: July 20, 1985
Age: 30
Place of Birth: Quezon City, Philippines
Gender: Male
Height: 5 ‘8
Weight: 75 Kg.
Nationality: Filipino
EDUCATION
Bachelor’s Degree: MAPUA INSTITUTE OF TECHNOLOGY, Muralla St. Intramuros Manila
B.S. Mechanical Engineering - Year 2002-2007
Secondary Education: Holy Child Catholic School - Year 1998-2002
Primary Education: Magat Salamat Elementary School - Year 1992-1998
EXTRA-CURRICULAR ACTIVITIES
MEMBER – Philippine Society of Mechanical Engineers, MIT – December 2006-December 2007
Organized and coordinated internal and external activities for the organization
RESEARCH AND STUDIES
Design of Heat Ventilation and Air conditioning for High Rise Building
: Study includes the basic principles about air-conditioning, related equipment and developments
Design of a Fire Protection system for Condominium building
: Project was meant to design a Fire Protection System for a condominium building.
TRAININGS AND SEMINARS ATTENDED
oApplied Heat Ventilation and Air Conditioning Seminar : Mapua Institute of Technology, June 2007
Japan Automotive Recycling Association : Mapua Institute of Technology, May 2006
Presentation on SEEPEX Progressive Cavity Pumps : Mapua Institute of Technology, May 2006
Metal Casting and Patterns : Mapua Institute of Technology, May 2006
Boiler Technology and Boiler Water Treatment : Mapua Institute of Technology, May 2006
Toyota: Way to safety : Toyota Philippines, June 2006
Coca Cola (Flow process and Manufacturing) : Coca Cola Philippines, Sta. Rosa, June 2, 2006
oKaeser Kompressoren Philippines, Inc. March 2010
SKILLS AND STRENGHT
Knowledgeable in Microsoft office such as Word, Excel, PowerPoint, MS Project.
Knowledgeable in Basic and Advance 2D and 3D in AutoCAD.
Basic Knowledge in Solid Works.
Can work under pressure with minimal Supervision.
With excellent people management skills.
Willing to learn and to work in any Location.
Excellent Interpersonal, Leadership and Communication skill. Hardworking and trustworthy.
WORKING EXPIREINCE
MECHANICAL ENGINEER April 26, 2013- PRESENT
PEG South East Asia Inc.:
8Th floor F and M Lopez Bldg II, 109 Carlos Palanca St., Makati City, Philippines
Website: www.pegsea.com
Email: ***@******.***
Job Responsibilities
Project Estimation Engineer Role:
Preparation of Preliminary estimation, Budget estimation, Detailed estimation (With Rate Analysis) Insurance claims and administration.
Visiting site / attending pre-bid meetings.
Preparing Project Risk Analysis report.
Sending enquiries and obtaining prices, analyze prices, prepare material and labor cost estimation and bid price
Conducting negotiations, Identification of cost or pricing data submitted during the negotiations and relied upon in reaching a settlement.
Preparation of List of Technical Queries for Consultant clarification.
Quantity take-off
Preparation of Technical Data sheet for all the equipment list.
Prepare technical and commercial proposals follow up until finalization.
Mechanical Design Engineer Role:
Provide Cement Equipment flow diagrams Base on Clients tender and requirements
Computation and Calculation of Equipment sizing and Requirements base on DCS(Design Criteria Standard).
Design calculation of material handling equipment like belt conveyor, screw conveyor, bucket elevator, airslide.
Provide Equipment Data sheet and Equipment Specification.
Provide Design of Dust Collection System.
Design Calculation and Sizing of Compressor, Blowers, Dryers and Air Tank receiver.
Equipment Erection, installation and operating cost estimates
Chute Design for every Transfer point and Transfer Tower Conveyors.
Analysis of Technical and Commercial proposals
Client’s drawings review if any
Provide General arrangement drawings
Construction support and start-up assistance
Project/Site Engineer Role:
Mechanical Engineer responsible for site execution and inspection
Planning & scheduling of maintenance activities, managing the manpower and assigning the specific responsibilities according to their experience and skills.
Responsible for maintaining critical and non-critical items
Maintaining day to day activities related to the plant.
Working closely with other department team to ensure ease in the flow of building facility
Liaise with mechanical contractor, suppliers, site supervisors, maintenance engineers and project manager.
Responsible for maintaining the safety measures in the working area.
Expertise in all aspects of engineering, design and construction of Cement Plant
PROJECTS
LOESHE CEMENT MILL No.3 for APO Cement CEMEX Philippines (Naga,Cebu City Philippines.
oDesign Calculation of Airslide and Sizing of Roots Blower
oDesign of Dust Collection System.
oProvide Technical Data sheet every equipment
oProvide Flow sheet diagram
oBelt Conveyor Installation and Commissioning
oDesign of Feed Chute From Belt Conveyor to Vertical Mill
oCivil/Structural Engineering and Construction.
oMechanical Installation and Erection.
oProject Management.
January 2011 – September 2013
JETTY TRANSPORT for APO Cement CEMEX Philippines (Naga,Cebu City Philippines.
oDesign Calculation of Belt Conveyor From Bulk Ship Loader to Silo According to CEMA 5th Edition and Client’s Stadards.
oDesign of Loading Hopper
oDesign Calculation of Dust Collection System,
oDesign of Discharge Chute, Transfer Chute.
oProvide Material take off
oProvide Equipment Data Sheet and Specification.
oCivil/Structural Engineering and Construction.
oMechanical Installation and Erection.
oProject Management.
March 2012 – September 2013
APO 3K SILO for APO Cement CEMEX Philippines (Naga,Cebu City Philippines.
oDesign Calculation for material handling for raw material like screw conveyor, belt Conveyor and Airslide According to CEMA 5th Edition, ISO and ANSI
oTransfer Chute design According to CEMA Standard
oDust Collection System design According to ISO or Client’s DCS(Design Criteria Standard)
oDesign Calculation and sizing of Compressor, dryer and Air Tank Receiver
oCivil/Structural Engineering and Construction.
oMechanical Installation and Erection.
oProject Management.
March 2012 – September 2013
DAVAO TERMINAL for CEMEX Philippines (Davao City Philippines.
oCivil/Structural Engineering and Construction.
oDesign and Calculation for Screw Conveyor and Bucket Elevator.
oTransfer Chute Design According to CEMA or Client’s DCS(Design Criteria Standard)
oDust Collection System design According to ISO or Client’s DCS(Design Criteria Standard)
oProvide plant layout
oMechanical Installation and Erection.
oProject Management.
March 2012 – September 2013
ILOILO TERMINAL for CEMEX Philippines (International Port, Iloilo City Philippines.
oCivil/Structural Engineering and Construction.
oPneumatic Conveyor Transport Design from Bulk ship loader to Cement Silo.
oDust Collection System design According to ISO or Client’s DCS(Design Criteria Standard)
oAeration layout inside Silo.
oPiping system for aeration of Cement Silo.
oDesign Calculation and sizing of Compressor, dryer and Air Tank Receiver.
oMechanical Installation and Erection.
oProject Management.
March 2012 – September 2013
FUEL TRANSPORT AND SERVICES for DS3 management inc. Polloc, Maguindanao Philippines.
oDesign of Pump use to pump from Fuel Barge to Gantry
oDesign of Pump Metering Skid According to Client’s Standard
oPiping system from Fuel Barge to Gantry
oCivil/Structural Engineering and Construction
oMechanical Installation and Erection.
oProject Management.
February 2015 – June 2015
PRODUCTION ENGINEER September 21, 2010 – April 26, 2013
EAGLE CEMENT CORPORATION : San Ildefonso, Bulacan Philippines
Job Responsibilities as Burner
oControls rotary type kiln and auxiliary equipment’s
oCoordinated with concerned personnel for any breakdowns or abnormalities observed in the whole pyro-process system.
oParticipated in team discussion and root cause analysis to have a common approach on the problem.
Job Responsibilities as Commissioning Engineer
oPart of the production team, supervised and coordinated of start-up and commissioning activities.
oPlanned and proposed changes in process or equipment in order to improve efficiencies improve quality or reduce costs.
oIn shift, continuously patrols plant production areas (kiln, pre-heater, clinker cooler, raw mill, coal mill and including the plant’s Centralized Compressed Air Plant, Water Treatment Plant, Water Pumping Station and Gas Conditioning Tower) and visually inspects equipment for malfunctions, out-of-adjustments, equipment failures or potential failures, proper lubrication, housekeeping concerns, and air or other leaks. Observes mechanical devices in operation and listens for unusual sounds from machines or equipment.
oDiscusses operation variations with other supervisors or production, electrical and maintenance workers to diagnose problems.
oCoordinates the repair of machines, tools and equipment through the maintenance departments to ensure continuous production operations.
Job Responsibilities as Coal Mill and Raw Mill Operator
oOperated the coal grinding mills, raw mill grinding and its auxiliaries effectively to obtain desired coal and raw mix fineness.
oResponsible for the proper handling and storage of raw coal and ensure proper feeding of coal dust to the rotary Kiln for smooth combustion.
oResponsible for the proper handling and storage of raw mix going to homosilo for feeding in Preheater.
oCoordinated with concerned personnel for any breakdowns or abnormalities observed in the grinding plant.
oTroubleshoot process abnormalities to facilitate continuous and productive operations.
MECHANICAL DESIGN ENGINEER December 03, 2007 – September 21, 2010
CEMA (Cement Management) Consultancy Inc.: 153 Efipanio delo Santos Avenue Brgy Wack-Wack Mandaluyong City
Job Description:
Conceptualizes design schemes and alternative with respect to client requirements and constraints.
Design Calculation for Bulk Material Handling e.g. Belt Conveyor, Screw Conveyor,Airslide According to CEMA 4th edition, ISO and ANSI
Design of Transfer Chute for bulk Loading, Silo loading, Conveyor
Design Calculation of Dust Collection system
Provide Technical Data sheet for every Equipment and Computation.
Produce Drawings used for bidding purposes.
Prepares technical specifications and chooses materials to be used.
Prepares quantity take off estimate.
Prepares tender documents.
Prepares preliminary procurement and construction schedule.
Liaise with suppliers and manufacturers on product specifications and prices.
Request quotations from contractors and suppliers for prices which is used in
Budgetary cost estimates.
Conduct routine inspection during manufacturing and construction.
PROJECTS
1.5 Million TPY CEMENT PLANT for EAGLE CEMENT CORPORATION (Sn. Ildefonso, Bulacan)
(Mechanical installation, STAGE 2)
December 03, 2007 – January 2010
ACCOMPLISHMENTS
DIESEL PIPING FOR KILN BURNER
oDesign Two Diesel Tank each Have a Capacity of 6000 Gallons by Petron Corp. Going to Pump Unit to valve unit to Kiln burner.
oPiping System from Fuel tank Storage to Burner pipe.
oDesign Calculation of pump unit.
HOMOSILO/KILN FEED SYTEM
oProvide piping layout for instrument air came from the centralized compressed air, with the working pressure of 6 bar to 8 bar max. Tank receiver and dryer supplied the pneumatic valve, shut off gate, slide gate, flow meter and dedusting filter.
oDesign calculation of Compressor, Dryer and Air Tank Reciever
oDesign Calculation of blower to be use in Airslide transport Discharge Silo.
ALTERNATIVE FUEL FOR BURNING (SLUDGE TREATMENT)
oOil Sludge for alternative Fuel by removing the 40 % of water in the tank and adding chemical additive. Then by heating and recirculation the oil in constant temperature, it will use as a heavy fuel for Burner.
oPiping System from Fuel tank Storage to Burner pipe.
oDesign Calculation of pump unit.
CONVEYOR SYTEM
oDesign calculation of Belt Conveyor from Quarry to Cement Mill
oProvide Plant layout and elevation Arrangement for every Department
oDesign of Dust Collector system for every transfer tower of conveyor.
oDesign of Transfer Chute from one Belt Conveyor to the other According to CEMA Standards.
oProvide material Take off for every conveyor system.
oProvide Technical Data Sheet for every Conveyor System
oDesign Calculation of blower to be use in Airslide transport Discharge Silo.