Post Job Free

Resume

Sign in

Electrical Engineer System

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
3000 US Dollar
Posted:
November 09, 2015

Contact this candidate

Resume:

HAFIZ SAMIULLAH - MSc Electrical

CONTACTS:

Address : House No. 34A, Street No. 1 Main Bazar Awan Town Multan Road

Lahore, Pakistan

Contact No : +971-*********

: +92-323*******

Email ID : acsdlz@r.postjobfree.com

LinkedIn : acsdlz@r.postjobfree.com

Skype ID : hsamiullah

OBJECTIVE:

More than Nine years of extensive experience in design, cost estimation, equipment selection, shop drawings review and preparations, project management of Air Ports, Schools, Colleges, Hospitals, Shopping Malls, Auditoriums, Residential and Commercial Complexes with leading companies Such as ASCE - [Al-Shathry Consulting Engineers], CSCEC-FWO J/V - [China State Construction & Engineering Corporation], ACE - [Associated Consulting Engineers] and UEC - [United Engineers and Contractors], and consultants in performing Electrical Design (High current Systems, Low current system, Electronics Security System, IP networking, BMS System, Etc.) for numerous projects. I am eager for knowledge and looking to develop my expertise in fields of Smart Building Systems, Renewable Technologies. I possess strong leadership and management qualities to motivate my colleagues and forge strong allies.

PROFESSIONAL WORK EXPERIENCE:

1: Job Title : MEP Consultant

Experience Period : 1st June, 2013 to 30th April, 2015

Company Name : Al-Shathry Consulting Engineers (ASCE)

Project : Royal Embassy of Saudi Arabia, Ashgabat Turkmenistan.

Key Roles and responsibilities:

A.Site Work:

-To approve the execution of works as per design and specification.

-To approve the installation, testing & commissioning of Low Current System (FAS, Tell, Data, Satellite, Security System, IBS etc.)

-To approve the fixing and installation of cable trays, cable ladders and trunking for low current and high current system.

-To approve the installation, termination, testing & commissioning of High Current System (Lighting System, Power System, HVAC System, Sub-station System, termination and assembling etc.)

-To approve the termination of DB’s, Panels, TJB, MS Boxes, EPABX, TTB

-To approve the installation of Electrical Fixtures and Fittings according to design drawing and specification.

-Testing & Commissioning of All Electrical System.

-Installation of HVAC Ducts, Fire Fighting system and Public health works.

B.Office Work:

-Reviewing IPC for the approval of payments from the client.

-Making progress report on daily, weekly and monthly basis.

-Approving method statements received from the contractor to execute work.

-Correspondence with Head Office regarding progress of the works.

-Attending meetings with Local Authority, Contractor (AAC), Client (MOFA) from Consultant’s side (ASCE).

-Making schedule of MEP Works.

-To review and approve MEP technical and material submittals.

-Arranging and keeping logs for MEP materials, letters and all the correspondence.

-Reviewing Variation Order for MEP Works sent by the contractor.

-Issuing field instructions, non-conformance reports for the site works.

-Reviewing and responding to all the MEP’s Request for information sent by the contractor

-Preparing CVI (Confirmation of Verbal Instruction)

2: Job Title : Electrical Engineer

Experience Period : 20th June, 2011 to 10th May, 2013

Company Name : China State Construction & Engineering Corporation. (CSCEC)

Project : New Benazir Bhutto International Airport Islamabad, Pakistan.

Key Roles and responsibilities:

A.Site Work:

-Making a daily plan for site work as per design drawings and specifications.

-Installation and testing & commissioning of Low Current System (FAS, Tell, Data, Satellite, Security System, IBS etc.)

-Fixing and Installation of Cable Tray. Cable Ladders and Trunking for Low Current and High Current System.

-Installation, Termination, Testing & Commissioning of High Current System (Lighting System, Power System, Sub-station System, Termination and Installation etc.)

-Installation and termination low current system such as of DB’s, Panels, TJB, MS Boxes, EPABX, TTB and electronics security system.

-Installation of Electrical Fixtures and Fittings according to design drawing and specification.

-Testing & Commissioning of All Electrical System.

-Preparing shop drawings for the approval from the consultant.

B.Office Work:

-Making IPC for the consultant to get the approval for payments from Client.

-Making progress report on daily, weekly and monthly basis

-Preparing the delivery check and Invoices for MEP Material.

-Keeping track of the status regarding MEP Material from Supplier/Manufacturer.

-Preparing schedule for material to be delivered on site.

-Preparing method statement for the approval from consultant.

-Corresponding with Head Office regarding major issues on site and progress of the work.

-Attending meetings with Client (CAA) and Consultant (LPG) from contractor’s side.

-Procurement and documentation regarding MEP Material.

-Arranging and keeping logs for MEP materials, letters and all the correspondence.

-Preparing technical submittals to get the approval from the consultant.

-Preparing variation order for MEP Work.

-Maintaining records for the MEP material delivered on site.

-Coordinating with venders and suppliers for ordering and Quotations for MEP materials.

3: Job Title : Electrical Consultant

Experience Period : 28th April, 2007 to 31st May, 2011

Company Name : Associated Consulting Engineers (ACE). Pvt Ltd.

Projects : THQ Hospital Hattian Bala, Muzaffarabad Azad Jammu & Kashmir [AJK] &

THQ Hospital Hajira, Rawlakot Azad Jammu & Kashmir [AJK].

Key Roles and responsibilities:

A.Site Work:

-To approve the execution of works as per design and specification.

-To approve the installation, testing & commissioning of Low Current System (FAS, Tell, Data, Satellite, Security System, IBS etc.)

-To approve the fixing and installation of cable trays, cable ladders and trunking for low current and high current system.

-To approve the installation of Medical Equipment’s according to Bio Medical Design.

-To approve the installation, termination, testing & commissioning of High Current System (Lighting System, Power System, HVAC System, Sub-station System, termination and assembling etc.)

-To approve the termination of DB’s, Panels, TJB, MS Boxes, EPABX and TTB.

-To approve the installation of Electrical Fixtures and Fittings according to design drawing and specification.

-Testing & Commissioning of All Electrical System.

-To Check & approve the testing and Commissioning of Transformer, Generators, UPS and LT Panels as per Single Line Diagram.

-Approval from Local authority regarding Telephone line, Main Power Supply, Fire Protection system and Main Sewerage Line.

B.Office Work:

-Reviewing IPC for the approval of payments from the client.

-Check the Shop drawings according to Specification and Electrical Codes.

-Preparing as-built drawings for Health Department, Local Authority and EEAP (Client)

-Making progress report on daily, weekly and monthly basis.

-Approving method statements received from the contractor to execute work.

-Corresponding with Head Office and Client (EEAP) regarding progress of the works.

-Attend Meetings with Local Authority, Contractor (Trade wall), Client (EEAP) and Consultant (ACE).

-Making schedule of MEP Works.

-To review and approve MEP technical and material submittals.

-Procurement and documentation regarding MEP Material.

-Arranging and keeping logs for MEP materials, letters and all the correspondence.

-Reviewing Variation Order for MEP Works sent by the contractor.

-Issuing field instructions, non-conformance reports for the site works.

-Check & approve the coordinate with venders and suppliers for ordering and Quotations for MEP materials by the contractor.

-Reviewing and responding to all the MEP’s Request for information sent by the contractor

-Preparing CVI (Confirmation of Verbal Instruction)

4: Job Title : ELECTRICAL ENGINEER.

Experience Period : 25th March, 2005 to 15th April, 2007

Company Name : United Engineers and Contractors (UEC) Pvt Ltd.

Project : FC College (Science Block Building) Lahore.

Key Roles and responsibilities:

A.Site Work:

-Executing the site works in accordance with approved design drawing, Project specification and Consultant instructions.

-Installation, termination, testing & commissioning of High Current System (Lighting System, Power System, HVAC System, Sub-station System, termination and assembling etc.)

-Fixing and Installation of Cable Tray. Cable Ladders and Trunking for Low Current and High Current System.

-Testing and Commissioning of Transformer, Generators, UPS and LT Panels as per Single Line Diagram.

-Installation and termination low current system such as of DB’s, Panels, TJB, MS Boxes, EPABX, TTB and electronics security system.

-Installation of Electrical Fixtures and Fittings according to design drawing and project specification.

-Final Testing & Commissioning of All Electrical System.

B.Office Work:

-Making IPC for the consultant to get the approval for payments from Client.

-Making progress report on daily, weekly and monthly basis

-Preparing the delivery check and Invoices for MEP Material.

-Keeping track of the status regarding MEP Material from Supplier/Manufacturer.

-Preparing schedule for material to be delivered on site.

-Preparing method statement for the approval from consultant.

-Corresponding with Head Office regarding major issues on site and progress of the work.

-Attending Meetings with Contractor (UEC), Client (FCC) and Consultant (FCC).

-Procurement and documentation regarding MEP Material.

-Arranging and keeping logs for MEP materials, letters and all the correspondence.

-Preparing technical submittals to get the approval from the consultant.

-Preparing variation order for MEP Work.

-Maintaining records for the MEP material delivered on site.

-Coordinating with venders and suppliers for ordering and Quotations for MEP materials.

EDUCATION:

MSc-Electrical 1st Division 2009 to 2011 Preston University, Islamabad Pakistan

B-Tech (Honours) Electrical 1st Division 2007 to 2008 Preston University, Islamabad Pakistan

B-Tech (Pass) Electrical 1st Division 2006 to 2007 Preston University, Islamabad Pakistan

DAE (Electrical) 1st Division 2001 to 2004 GCT Ray wind Road Lahore, Pakistan

Matriculation (Science) 1st Division 1999 to 2000 Govt H/S Iqbal Town Lahore, Pakistan

EXTRA QUALIFICATION:

Diploma in Computer Sciences June, 2005 to Sep, 2005 PCIT Lahore, Pakistan

Diploma in MEP AutoCAD June, 2008 to Jan, 2009 PEC Lahore, Pakistan

SKILL SET SUMMARY:

Strong work ethics, work well with others.

Designing talent coupled with innovation.

Excellent project management skills.

Strong conceptual and analytical skills.

Skilled at managing multiple priorities and meeting strict deadlines.

Excellent communication and interpersonal team skills.

Ability to quickly grasp the latest technologies.

Good teamwork, cross-functional leadership skills.

Well organized, hard worker, self-motivated.

STAFF MANAGEMENT:

My role is Electrical Engineer, and my responsibilities included:

1. Ensuring each staff member was aware of their specific duties.

2. Maintained the relevant time-lines and ensured each team-member's deliverables arrived on time.

3. Arranged, coordinated, and led meetings to discuss current and upcoming problems.

4. Maintained a professional and comfortable interpersonal environment for my staff.

5. Motivation & Establishment, Better performance, Balance the teams and their works

6. Management and works together, achieves the goals, in depended thing & new ideas.

PERSONAL INFORMATION:

Father Name : Muhammad Shafi Nasir

Religion : Islam

Date of Birth : 15th March 1983

Material Status : Married

NIC No : 35202-4639768-1

Nationality : Pakistan

Passport No : AD5297682

REFERENCES AND DOCUMENTS:

Will be provided if required.



Contact this candidate